• 제목/요약/키워드: Manual grouting method

검색결과 3건 처리시간 0.021초

거가대교 케이슨기초 그라우트 충전 사례연구 (A Case Study on Caisson Foundation Grouting in Geo-Ga Bridge)

  • 배경태;차경섭;김영진;박충환;정경환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1046-1050
    • /
    • 2010
  • During construction of a sea-crossing bridge grouting was used to fill densely the space between the bottom of caisson and the ground. This grout mixture was mixed with an anti-washout admixture after locating accurately the pre-cast caisson on three concrete landing pads. This method differs significantly from the costly conventional method, for bridge foundations offshore, where concrete is placed in situ after excavating inside of a temporary concrete coffering wall. To verify the grouting method in advance, the full-scale field tests were performed twice on land. After identifying the fluidity of the grout material to be filled, finding some possible problems with the main construction and revising the original design, the main construction has been continuing successfully with 20 caissons completed to date. The purpose of this paper is to introduce for the first time in Korea the grouting method including the automatic and the manual monitoring system based on the main construction of the caisson foundation.

  • PDF

부산~거제간 연결도로 해상교량기초 그라우팅 시공사례 연구 (Application of Grouting of the Sea-Crossing Bridge Foundation in Busan-Geoje Fixed Link)

  • 박충환;정상균;정경환;신민식;박찬우;권진욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.665-678
    • /
    • 2007
  • It was applied the grouting method to fill densely the space between the bottom of the caisson and the ground with the grout mixture mixed with anti-washout admixture after locating accurately the precast caisson on three concrete landing pads but it is far different from a costly conventional method, which place concrete to build the foundation of reinforcement concrete on the spot after excavating inside of the temporary coffering wall for the bridge foundation in the sea. To verify the grouting method in advance, the full-scale trial test was performed twice on the land. After confirming the fluidity of material for the injection and some possible problems during construction and then enhancing the original design, the main process is ongoing and it has been finished 12 spots until now. The purpose of this study is to introduces for the first time in Korea the grouting method including the automatic and the manual monitoring process applied to, based on the main process of the caisson foundation finished already in the site. In a similar construction it is sincerely expected to be referred to in the future.

  • PDF

손상된 콘크리트 구조물에 에폭시수지를 이용한 보수·보강효과에 대한 연구 (A Study on the Repair and Strengthening Effects of Epoxy Grout for the Damaged Concrete Structure)

  • 신성우;조태관
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제1권1호
    • /
    • pp.125-132
    • /
    • 1997
  • This study was intended to investigate the effects of epoxy grout on compressive strength for damaged concrete structures. For this purpose, concrete molds were manufactured and tested for compressive strength at 28 days after water curing. Two kinds of Korea-made and one Japan-made epoxy grouts were injected into the broken concrete molds with the automatic low-pressure injecting method or the hand injecting method.

  • PDF