• Title/Summary/Keyword: Manpower Program Applying

Search Result 12, Processing Time 0.02 seconds

Vitalization Strategy Research of Private Modern Dance Organizations: Centered on The Importance of Experts and Urgency Assessment (민간 현대무용단의 활성화 전략 연구: 전문가 중요도 및 시급성 평가를 중심으로)

  • Kim, Gyu-Jin
    • Journal of Digital Convergence
    • /
    • v.18 no.11
    • /
    • pp.527-538
    • /
    • 2020
  • This research measures the urgency and importance listening to experts' opinions as a proposal for vitalization of folk modern dance groups. Firstly, the open type FGI(Focus Group Interview) was implemented for five groups of an expert by applying the new industry foster theory, and total 24 types of second questionnaire were developed through importantly referred or repeated contents. They were distributed to 20 people including a dance group representative, a planner, a university professor and etc to measure experts' importance and urgency. In the research result, For big list, Financial aid for both importance and urgency appear first, and for comparative analysis of importance and urgency for small list, differences in infrastructure construction are shown. "expansion of dance program's advertisement channels" and "rank 1" appeared in "Secure space for dancers". Suggestions for analyzing such results are as follows. It is shown that "detailed financial aid for the operation of dance groups" and etc in the aspect of financial aid, "the employment of professional human resources including design and producing etc" in that of performance and education related production development, "training a dancer who can assimilate a complex genre" in that of manpower training, "arrangement of exclusive space for a dance group" in that of infrastructure building, and "the employment of professional human resources including design and producing etc" in that of consulting support are important and urgent matters considered by experts.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.