• Title/Summary/Keyword: Management Performance Measurement

Search Result 971, Processing Time 0.023 seconds

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

A General ion Method of Measurement Units for Performance Tracking (진도율 산정을 위한 측정 단위 도출 방안에 관한 연구)

  • Yoon Su-Won;Chin Sang-Yoon;Kim Yea-Sang;Jung Young-Soo;Park Sung-Soo;Park Soon-Chan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.521-524
    • /
    • 2003
  • Recently various construction management systems are applied for more efficient project management, and through them as-built construction information is collected. However, the accuracy of the collected information shows big differences among projects, since tile collection of tile as-built information is not based on objective manner or criteria and also each management personnel uses difference criteria on this based on individual experiences. This initiates the need for a development of methods and information frameworks for efficient collection and management of as-built information with assurance of data accuracy. Therefor the objective of this study is to suggest a method to determine the task performance measurement unit depending on the characteristics of work types. A prototype system was developed for generating task performance measurement units by utilizing MS ACCESS. The information framework and the system developed in this research is expected to help standardized performance measurements across projects by improving the objectivity and the accuracy of the collected information.

  • PDF

A Case Study on the Development of Strategic Performance Measures (전략적 성과측정 지표 개발을 위한 사례 연구)

  • 최재영;최기준;권태형
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.211-214
    • /
    • 2000
  • The paper presents a case study with application of a performance measurement questionnaire in analyzing a semi-conductor-related manufacturing company. The case may contribute to the development of strategic performance measurement system. The questionnaire contains considerable non-financial measurement indices as well as financial ones, which may strengthen the strategic aspect of measurement system. The strategy, actions, and measures have to be balanced through communication process in an organization. The result shows the usefulness of the congruence and consensus analysis of performance factors in effectively managing strategic action programs and identifying investment task areas to be targeted.

  • PDF

A Risk Performance Measurement System for the Mega-Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.12 no.1
    • /
    • pp.57-64
    • /
    • 2010
  • In recent years, interests and studies on the urban regeneration projects have been increased and largely conducted. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

The Performance Measurement of Business & Industry and University Foodservice Operated by Contracted Foodservice Management Company (위탁 경영사업체 및 대학교 급식소의 수행평가)

  • Han, Kyung-Soo
    • Journal of the Korean Society of Food Culture
    • /
    • v.17 no.3
    • /
    • pp.252-259
    • /
    • 2002
  • The purpose of this study examined important factor of performance on Contract Foodservice management. Three contract Foodservice companies were selected which were located in Seoul & kuonggi province. 300 units were chose. The questionnaire was composed of seven part. There were the operation of food management, the operation of menu, the operation of equipment and facilities management, the operation of solid waste and safety management, the operation of waiting time management. As a result of the survey B&I foodservice was listed higher than University foodservice as food hygiene, FIFO and food shelf life. University foodservice employees worked 4 hour longer than B&I foodservice employees, so turnover rate was higher than it. Comparing the number of feeding, B&I foodservice equipment and facilities scale was bigger than University foodservice equipment and facilities. The rate of solid waste on B&I foodservice was 11.468% and the rate of University foodservice was 16.23%, the waiting time of University foodservice was about 8mins longer than B&I foodservice.

Research on Importance-Performance Analysis of Smart Construction Safety Management System (스마트 건설안전관리시스템의 중요도-성과도 분석 연구)

  • Jong-Yil Park;Chang-Hee Yun
    • Journal of the Korea Safety Management & Science
    • /
    • v.26 no.2
    • /
    • pp.43-53
    • /
    • 2024
  • This study analyzes the importance-performance analysis (IPA) of the 10 dimensions of the smart construction safety management system, and analyzes which dimensions are important and which dimensions are performing to determine key improvement tasks, incremental improvement tasks, Maintenance and reinforcement tasks and continuous maintenance tasks were derived. Among the 10 dimensions of the smart construction safety management system, the dimensions that are recognized as important by all field managers and field workers and have high performance are the automatic risk displacement measurement system, smart environmental sensor system, and heavy equipment seizure prevention system. However, areas that were perceived as having high importance but low performance were worker location tracking systems, smart safety helmet chin muscles, and smart safety ring fastening. Among the smart construction safety management systems perceived by field managers, areas for key improvement with high importance and low performance included worker location tracking system and smart safety ring fastening. Among the smart construction safety management systems perceived by field workers, the area for key improvement with high importance and low performance was the automatic risk displacement measurement system.

An Empirical Approach to Evaluate Management Performance Using a Trading Area Analysis: Focus on Small and Medium-sized Retail Businesses

  • Bae, Jae-Ho
    • Journal of Distribution Science
    • /
    • v.10 no.12
    • /
    • pp.5-11
    • /
    • 2012
  • Purpose - This paper proposes measurement models to evaluate the management performance of small and medium-sized retail businesses on the basis of a trading area analysis that compares their proposed revenue to actual revenue in the trading area. Research design, data, methodology - The study proposes measurement models consisting of five stages, namely: (1) district background survey, (2) customer survey, (3) competitor survey, (4) business district survey, and (5) business performance analysis. Results - To identify business districts easily, this study preferred a minor-adjusted method based on the Euclidean distance, as it is simple to employ for the small and medium-sized businesses. This model was applied to select coffee shops in Daejeon. Results indicated that although the targeted shop was not located in an appropriate location, actual sales were higher than expected. Conclusions - Small- or medium-sized retail businesses face difficulties regarding the economies of scale and brand recognition and must choose an appropriate location to ensure management stability. However, such businesses will find it difficult to evaluate their competitive edge accurately using a trading area analysis.

  • PDF

Design and Application of Two-Stage Performance Measurement System Considering Dynamic Capabilities (동태적 역량을 고려한 2단계 성과측정시스템 설계 및 적용)

  • Kwon, Sun-Man;Han, Chang Hee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.2
    • /
    • pp.65-73
    • /
    • 2018
  • The dynamic capabilities of sensing market signals, creating new opportunities and reconfiguring resources and capabilities to new opportunities in a rapidly changing economic environment determines the competitiveness of the enterprise to create added value and survival. This study conceptualized a two-stage performance measurement framework based on the casual model of resource (input)-process-performance (output). We have developed a 'Process capability index' that reflect the dynamic capabilities factors as a key intermediary product linking resource inputs and performance outputs in enterprise performance measurement. The process capability index consists of four elements : manpower (level of human resource), operation productivity, structure and risk management. The DEA (Data Envelopment Analysis) model was applied to the developed performance indicators to analyze the branch office performance of a telecom company. Process capability efficiency (stage 1) uses resource inputs to reach a certain level of process capabilities. In performance result efficiency (stage 2), the process capabilities are used to generate sales revenues and subscribers. The two-stage DEA model derives intermediate output values that optimize the individual stages simultaneously. Some branch offices in the telecom company have focused on process capability efficiency or some other branch offices focused on performance result efficiency. Positioning map using two-stage efficiency decomposition and benchmarking can help identify the sources of inefficiencies and visualize strategic directions for performance optimization. Applications of two-stage DEA in conjunction with the case study that are meaningfully used in performance measurement areas have been scarce. In particular, this paper has the contribution to present a new performance measurement model considering the organization theory, the dynamic capabilities.

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

A study of the Performance Measurement Based on Lean Construction (린 건설에 기초한 성과측정 방안에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.492-495
    • /
    • 2006
  • The performance measurement has been taken with the transformation concept of production, which is considered to be a major cause of existing problems. In order to improving productivity, it is argued that the performance measurement based on Lean Construction is necessary. This study suggests new performance measurement indicators based on work flow ; Reliability, Effectiveness, Efficiency.

  • PDF