• 제목/요약/키워드: Management Performance Improvement

검색결과 1,997건 처리시간 0.029초

진료재료대 수가누락방지 및 비용절감 개선활동 (Prevention of Missing the Fee of Medical Supplies and Improvement Activity of Cost Cutting)

  • 최현주
    • 한국의료질향상학회지
    • /
    • 제21권1호
    • /
    • pp.52-61
    • /
    • 2015
  • Objectives: Because recently hospital had to faced with financial hardship, we have to have more effective hospital management. The purpose of this study was to reduce loss costs of the hospital through the systematic management of medical supplies and increase operational efficiency. Methods: The team was composed of outpatient nursing staff, medical record administrator, nurses in medical insurance, medical computer center, dermatologists for this study. We surveyed for 114 people including outpatient nursing staff, nurse aids, medical assistant, physician assistant. Pre-survey period was 2013.03.11 ~ 03.30(2 weeks), and post-survey period was 2013.09.03 ~ 09.17(2 weeks). Result: We improved this way through the computational improvement, conservation campaigns, inventory management, staff training, replaced by low-cost medical supplies. The finding of this study were as follows: Comparing before and after the activity of outpatient nursing staff's degree of knowledge, performance, economic consciousness, the degree of knowledge, performance was increased, but there was no significant change in economic consciousness. Performance of Married person is higher than the unmarried, In addition, the high-position people were more the degree of knowleage, economic consciousness. After activity, correlation of goods and treatment, examinations is increasing, but statistically there was no mean. Conclusion: This study revealed that knowledge in a short period of activity, but also can improve, perform the same change in behavior is not easy. This one shows the intensive training required to sustained and systematic behavioral changes, such as changes in behavior, perform rituals to help the economy. Expensive medical supplies to replace a similar effect as the cost of materials just to have a lot of cost savings. Therefore, more medical supplies change is necessary to develop alternative treatment and cost cutting.

의류기업의 공급사슬관리 기반활동과 마케팅 역량이 업무성과에 미치는 영향 (The Effect of Supply Chain Management Activities and Marketing Capabilities on the Performance of Apparel Firms)

  • 이경훈;박재옥
    • 한국의류학회지
    • /
    • 제31권6호
    • /
    • pp.942-954
    • /
    • 2007
  • 본 연구는 의류기업의 공급사슬 기반활동과 마케팅 역량, 업무성과의 구성차원을 파악하고, 업무성과 향상을 위한 공급사슬 기반활동과 마케팅 역량의 효율적인 활용방안을 모색해 보았다. 공급사슬구조의 중간단계에 위치하고 있어 전체 산업의 전후방에 미치는 효과가 크고, 모든 가치활동을 수행할 능력을 가진 대규모 의류유통기업을 대상으로, 한국패션브랜드연감, 한국의류산업협회 등에 등록된 회원사 리스트를 바탕으로 단순무작위 표집하였다. 설문지 조사방법을 통해 총 95부를 자료분석에 이용하였고, 공급사슬 기반활동, 마케팅 역량, 업무성과 수준을 6점 척도로 측정하였다. 변수의 차원 분류 및 타당도, 신뢰도를 파악하기 위해 요인분석과 신뢰도분석을 실시하였고 공급사슬 기반활동, 마케팅 역량이 업무성과에 미치는 영향을 알아보기 위해 다중회귀분석을 실시하였다. 공급사슬 기반활동은 구조적, 물류적, 기술적 요인으로 분류되었고, 마케팅 역량은 차별화, 비용우위, 경영우위 요인으로 분류되었고, 업무성과는 재무시장, 생산, 고객만족으로 분류되었다. 공급사슬 기반활동이 업무성과에 미치는 영향은 기술적 활동강화를 통해 재무시장, 생산, 고객만족성과를 얻을 수 있었고, 구조적 활동강화를 통해서는 생산성과를 극대화 할 수 있었다. 마케팅 역량이 업무성과에 미치는 영향은 차별화 역량강화를 통해 재무시장과 고객만족성과를 얻을 수 있었고, 비용우위 역량은 생산성과에, 경영우위 역량은 재무시장성과에 영향을 미치는 것으로 나타났다.

Key Performance Indicators for Project Management Performance of Large Contractors in Developing Countries: A Case Study in Vietnam

  • Soo-Yong Kim;Troung-Van Luu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1599-1607
    • /
    • 2009
  • In order to deal with severe competition in the construction market of developing countries, large contractors must continually improve their own performance and operation. Performance measurement is the heart of ceaseless improvement in organizations. Key performance indicators (KPIs) play a key role in measuring project management performance (PMP) of large contractors in developing countries. The main objective of this paper is to identify KPIs, which can be used to measure PMP of contractors, and then analyze the underlying relationships of these KPIs in order to gain insight into PMP of large construction firms in Vietnam construction industry (VCI). Literature reviews and the pilot survey provided 30 KPIs. Fourteen KPIs, which have the mean values higher than 3.0, were considered as important KPIs through a questionnaire survey of 32 professionals. Factor analysis of these KPIs was employed to categorize them. The results of the survey revealed that top six KPIs are construction time and cost, owner satisfaction on services and products, and quality management and project team performance. Factor analysis uncovered that 14 top-ranked KPIs can be grouped under six categories, namely: (1) construction input management, (2) owner satisfaction, (3) cost and quality, (4) manpower management, (5) subcontractor performance and (6) equipment management. The findings of this research can be used as a guideline to measure PMP of contractors in Vietnam as well as in other developing countries. Since contractors from a country to the other country may have the same manner to manage construction projects, the results of this study may be useful not only to practitioners and researchers in Vietnam but also to participants in other developing countries.

  • PDF

On the Performance Management System to Analyse the Effectiveness of Type Approval System for Railway Vehicle

  • Lee, Young Hoon;Lee, Jee Ha;Park, Chan Kyung;Kim, Young Min
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권1호
    • /
    • pp.1-10
    • /
    • 2021
  • The type approval system for railway vehicle has been in effect since 2016 in order to establish a regular safety management system to secure railway safety and enhance the technological competitiveness of the railway industry, abolished the conventional performance test system through the reform of the Railroad Safety Act in 2012. Until now, there has been appreciated it has been making significant contributions to railway safety and industry of operation and manufacturing companies, taking their place in accordance with the implementation of the system. But there has been no case of quantitative analysis on the effectiveness of the actual system. In this study, in order to examine the full-scale performance of the approval system and quantitatively analyze effectiveness, we identified and defined the relationships with the major elements of the type approval system based on system thinking principle and determined the calculated outcomes to relevant stakeholders. A method of establishing a type approval performance management system that can be grasped, utilized, and adjusted from a point of various stakeholders' views was proposed. This is expected to be more helpful in the implementation of the system, such as improving and applying quantitative effects to analysis by closely reviewing the effects and influencing factors of the type approval system based on the data accumulated through continuous performance management and reflecting to system improvement.

품질경영시스템과 흡수역량이 전기전자분야 중소벤처 제조기업의 경쟁력에 미치는 영향 (The Effect of Quality Management System and Absorptive Capacity on the Competitiveness of Small and Medium Venture Manufacturing Company in Electric and Electronic Industry)

  • 진성한;이철규;이동명
    • 품질경영학회지
    • /
    • 제39권2호
    • /
    • pp.292-304
    • /
    • 2011
  • This study is to search for the core factors of improving competitiveness of small and medium venture manufacturing company in electric and electronic industry and to do an in-depth analysis of the relations with management performance through systematic approach and to provide implications of importance of the management for the improvement factors for the domestic small and medium venture manufacturing company in electric and electronic industry. The report is analyzed how the relationship between the quality management system that was discussed in existing literature and the core factors of absorbing capability impact to the enterprise management performance.

방폭설비 성능유지 실태분석을 통한 관리방안 연구 (A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities)

  • 권용준;변정환
    • 한국안전학회지
    • /
    • 제35권2호
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

만족도-중요도 매트릭스를 이용한 건설현장에서의 RFID 개선 방향에 관한 연구 (A Study on the Improvement Direction of RFID Using Satisfaction-Importance Matrix in Construction Fields)

  • 장세웅;유회찬;김재준
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.47-54
    • /
    • 2009
  • Integrated construction site management using RFID(Radio Frequency Identification) and facility maintenance introducing USN (Ubiquitous Sensor Network) have been widely used in the mega construction project sites. But, the validation on performance of RFID systems after introducing those has not been carried out. Given that the use of RFID systems have been increased, the construction industry as well as other industries needs the evaluation of the RFID system. By regarding the necessities for evaluation, a research to the satisfaction and importance evaluation of RFID system from the end-users' view point for site management was conducted. Satisfaction-importance matrix of satisfaction standards and importance standards was created (organised) according to the analysis result of a survey, proposed improvement methods and analysis about the items presented by each region like areas of sustainable maintenance, maintenance, progressive improvement and priority improvement. The result would contribute to enhance the utilization of system and its performance.

Creating and Using BIM waste energy map Study on Energy Management

  • 김혜미;홍원화
    • 한국GIS학회:학술대회논문집
    • /
    • 한국GIS학회 2010년도 추계학술대회
    • /
    • pp.291-291
    • /
    • 2010
  • Emerging global economic growth and increasing demand for energy supply and demand imbalance and the excessive use of fossil fuels existing the rapidly increasing greenhouse gas emissions and resource depletion of global energy crisis is deepening. Accordingly, improvement of living conditions around and through the natural ecological preservation and the need for a comfortable life for the meeting the importance of energy management and consumption are emerging. Many in the field of architecture for energy-saving measures and conducts research and analysis from the early stages to verify the energy performance of BIM (Building Information Model) technology development and commercialization through the building's energy performance to an objective technology forecasts Analysis of the existing building energy performance in waste management also possible that "BIM-based green building process, the possibility of" suggested. In this study, BIM through the analysis of information using the structures for the management of waste, energy and physical data collected by Mapping it can effectively plan resources for recycling were analyzed.

  • PDF

안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구 (A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety)

  • 김도수;신윤석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

A Health and Safety Improvement Roadmap for the Construction Industry

  • Diugwu, Ikechukwu A.;Baba, Dorothy L.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.37-44
    • /
    • 2014
  • Comparatively, the construction industry has, on average, a higher rate of fatal and major injuries, work induced ill-health and damage to properties than other industrial sectors; and this is a source of concern to industry stakeholders. The study showed that although subcontracting could be contributory to an increase in workplace accidents in the construction industry, contractual aspects of subcontracting arrangements (such as the power imbalance that exist along the client-customer interface) also present opportunities for improvements in health and safety management (HSM) practices in organisations. This conclusion was reached after an analysis of a questionnaire survey (with a 27% response rate) that assessed the attitudes and perception to health and safety issues.