• Title/Summary/Keyword: Management Basin

Search Result 818, Processing Time 0.026 seconds

Development of vulnerable period assessment method for efficient groundwater resources management in upstream of Nakdong river basin using entropy method (엔트로피 방법을 이용한 낙동강 상류 지역의 지하수자원 관리 취약시기 평가 방법 개발)

  • Kim, Il Hwan;Lee, Jae-Beom;Yang, Jeong-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.9
    • /
    • pp.761-768
    • /
    • 2018
  • Groundwater resources are becoming depleted due to climate change factors and non climate change factors. In order to effectively groundwater resources management, we developed a method for evaluating vulnerable periods of groundwater resource management in watershed areas. The watershed based vulnerability assessment was conducted independently of the evaluation of vulnerable areas and vulnerable periods for sub watersheds. The vulnerable area evaluation index was standardized and applied to the independent vulnerable period index each region. It was applied to Bonghwa-gun, Andong-si, Yecheon-gun, Mungyeong-si and Sangju-si in the upstream of the Nakdong river basin. As a result, the Sangju-si's August was the most vulnerable at 0.278, and Andong-si was assessed to be vulnerable to groundwater resource management during 8 months of the year in study area. Using the developed method, we can find efficient management method considering the time and regional of groundwater resources.

A Study on the River Water Quality Management Model using Genetic Algorithm (유전알고리즘을 이용한 하천수질관리모형에 관한 연구)

  • Cho, Jae-Heon;Sung, Ki-Seok
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.18 no.4
    • /
    • pp.453-460
    • /
    • 2004
  • The objective of this research is to develop the water quality management model to achieve the water quality goal and the minimization of the waste load abatement cost. Most of existing water quality management model can calculate BOD and DO. In addition to those variables, N and P are included in the management model of this study. With a genetic algorithm, calculation results from the mathematical water quality model can be used directly in this management model. Developed management model using genetic algorithm was applicated for the Youngsan River basin. To verify the management model, water quality and pollution source of the Youngsan River had been investigated. Treatment types and optimum treatment costs of the existing and planned WWTPs in the baisn were calculated from the model. The results of genetic algorithm indicate that Kwangju and Naju WWTP have to do the advanced treatment to achieve the water quality goal about BOD, DO and TP. Total annual treatment cost including the upgrade cost of existing WWTPs in the Youngsan River basin was about 50.3 billion Won.

Development and Application of Freshwater Lake Water Quality Management System(ELAQUM) through the Linkage of Watershed and Freshwater Lake (유역과 담수호를 연계한 담수호 수질관리 시스템 개발 및 적용)

  • 김선주;김성준;김필식
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.6
    • /
    • pp.124-136
    • /
    • 2002
  • A freshwater lake water quality management system(FLAQUM) was developed to help regional manager for the water quality of a rural basin. The integrated user interface system FLAQUM written in Visual Basic, includes three subsystems such as a database management system, basin pollutant loads simulation model using SWMM model and freshwater lake water quality simulation model using WASP5 model. Pollutant load simulation model was applied to simulate the discharge and pollutant loading from the watershed, and freshwater lake water quality model was applied to analyze the changes in water quality with respect to watershed pollutant loads, and this model could be used in planning to control watershed pollutant source for water quality management. Database management system was constructed fur all input and output data processing, and it can be used to analyze statistical characteristics using constructed data. Results are displayed both graph and text for convenience of user. The results of FLAQUM application to Boryeong freshwater lake showed that the lake was in eutrophic condition. The major contribution of pollution comes from tributary No.1 and No.4, which have a large number of livestock farms. Therefore, water quality management must be focused on appropriate management of the livestock farming in the two breanchs.

Analysis of Agricultural Water Supply System at the Dongjin-River Basin (동진강 유역의 농업용수 급수체계 분석)

  • Choi, Jin-Kyu;Son, Jae-Gwon;Kim, Young-Joo
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.1
    • /
    • pp.11-18
    • /
    • 2012
  • This study was investigated agricultural water supply system of major agricultural waterway for Gimje canal, Jeongeup canal, Dongjin river conduit of Dongjin river basin. Furthermore, this result will be used for water resources and agricultural demand in Saemangeum reclaimed arable land. Annual precipitation for 5 years in Dongjin river basin was 1,311.7mm. The average discharges in Dongjin river basin was $1,390{\times}10^6\;m^3$ and $1,516{\times}10^6\;m^3$ and $744{\times}10^6\;m^3$ for 2,007 and 2008, respectively. Also, annual average amount of water resources was 1,861${\times}10^6\;m^3$ and $2,279{\times}10^6\;m^3$ and $1,227{\times}10^6\;m^3$ for 2,007 and 2008, respectively. Dongjin river basin water system for the analysis of agricultural water in water resources, runoff, agricultural water demand and usage surveys were analyzed, resulting in the total amount of water due to precipitation of the watershed of the $12.3{\times}10^9\;m^3$ ~$22.8{\times}10^9\;m^3$ and Dongjin River basin in waters flowing discharge is $7.4{\times}10^9\;m^3$~$16.1{\times}10^9\;m^3$, agricultural water demand and usage of each of $6.8{\times}10^9\;m^3$~$6.9{\times}10^9\;m^3$ and $4.9{\times}10^9\;m^3$~$7.1{\times}10^9\;m^3$ compared to the agricultural water demand was more likely. Agricultural water supply system in Dongjin river basin is complex because of devided branches to the main canal and branch canal. In this process, accurately assessment of water usage is very difficult. Therefore, systematic management of water resources and supply of agricultural water supply system to use the terms of the complexity and diversity by considering the appropriate level of agricultural water management systems will be needed. As a result of this study, it can be used water resources assessment in quantity, rational usefulness and basic planning of water resources development for water distribution.

Hydropower Development and Sustainability in the Mekong River Basin

  • Lee, Seung-Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.37-37
    • /
    • 2012
  • The study aims to evaluate the complexity of relationships between the riparian states - China, Myanmar, Laos, Thailand, Vietnam and Cambodia - in the Mekong River Basin since the mid-1990s with special reference to the discourse on hydropower development. A special emphasis will be put on the influence of China on hydropower development. Although a variety of issues on the river basin have been discussed among the riparian states, none of them has been effectively implemented owing to the lack of China's commitment to the discussions for sustainable water management. Now, a new turning point is observed in the region with emergence of the issue on hydropower development, not only in the upper basin but also in the lower basin. The discourse on hydropower in Mekong has quickly drawn attention of the public, accelerated by the onset of construction of the Xayabury Dam in Laos since November 2010. The influence of China as the upstream country with its political, economic, and military power has increasingly grown in the region over the last few decades, and such trend recently intensifies together with an expansion of Chinese commercial interests in the region. Since the establishment of the Mekong River Commission (MRC) in 1995, the four MRC members have striven to push forward a sustainable use of water resources in the basin. But the legitimacy of the MRC system has been eroded due to the lack of participation by Myanmar and China, and in particular, the Chinese absence has made the four riparian states blind about the change of water regime due to the Chinese dams upstream. Environmental damages due to hydropower development might be possible, including a drop of fish yields, crop production, and damages to the river's ecosystems. Vietnam and Cambodia have already expressed their concerns over the dam construction towards China as well as Laos by pointing out detrimental impacts of the dams to their economies. China's move to collaborate with the other riparian states since 2010 has given a positive signal in terms of sustainable water management in the river. However, this phenomenon never confirms China's proactive contribution to the cooperative activities within the framework of the MRC system. Laos' initiative to build a new dam in the lower basin alarms those who are opposed to dam construction in the fear of its far-reaching damages to the environment. The question goes back to the year-long debate on policy priorities given to economic growth or the environment. The riparian states require wisdom based on a consensus about sustainable water use rather than hydropower development based on individual growth dreams.

  • PDF

A Study for selecting the Highway Sites' Best Management Practice for Nonpoint Source Pollution (고속도로 현장별 비점오염 저감시설 선정방안 연구)

  • Lee, Yong-Bok;Choi, Sang-Il;Park, Kye-Su;Seong, Il-Jong;Jung, Sun-Kook
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.6
    • /
    • pp.857-866
    • /
    • 2011
  • This research categorized EIA target highways into following three types in order to minimize non-point source pollution from highway runoff. 1. Big drainage basin. 2. Small drainage basin. 3. Bridge section. The Natural, Filter and Swirl-Type devices were evaluated in terms of removal efficiency of TSS, BOD, COD, T-N, T-P, compatibility of site selection, economic feasibility, and maintenance convenience through which the final BMP was selected. According to the removal efficiency result, the area of Big and Small Drainage basin and bridge section had higher removal efficiency with natural facility than that of the Filter or Swirl-Type device. To make appropriate selection of highways'BMP for non-point source pollution, this study will aim to contribute to building more environmentally friendly highways by proposing the selection process that is made of 5 stages. 1. Selecting the target drainage basin. 2. Selecting the land for the mitigation facility. 3. Analysing the ease of maintenance. 4. Technically evaluating each installation. 5. Evaluating the effective implementation methods.

Productivity Analysis for Multi-Wells Depressurization of Gas Hydrate Bearing Sediments in Ulleung Basin, East Sea of Korea (동해 울릉분지 가스하이드레이트 퇴적층 내 다중정 감압에 따른 생산성 분석)

  • Moon, Seo-Yoon;Shin, Hyo-Jin;Lim, Jong-Se
    • Ocean and Polar Research
    • /
    • v.43 no.4
    • /
    • pp.295-306
    • /
    • 2021
  • A field scale productivity analysis is required for the development of gas hydrate in marine sedimentary layers to verify the field applicability of production techniques and to improve productivity. In this study, the productivity resulting from the application of depressurization using multi-wells for the development of gas hydrate in the Ulleung Basin, East Sea of Korea, was determined. A numerical analysis model reflecting the conditions of candidate sites for the Ulleung Basin was constructed, and the productivity and dissociation behavior were comparatively analyzed. The pressure propagation and gas hydrate dissociation region by the multi-wells were wider and the productivity was higher than that of a single well. Different depressurization effects according to the spacing of multi-wells affected productivity. The results provide basic data for productivity analysis when establishing a field test production plan for the Ulleung Basin.

Assessment of Water Management Efficiencies for Irrigation Pumping Stations in the Han River and Nakdong River Basins (한강 및 낙동강 유역의 양수장 지구 물관리효율 평가)

  • Kim, Hyeon-Jun;Kim, Chul-Gyum;kim, Sung
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.1
    • /
    • pp.23-32
    • /
    • 2003
  • The objective of this study is assessing water management efficiency using water withdrawals from rivers and water requirements for paddies. The water management efficiency was defined by the ratio of water requirements and water withdrawals. Water withdrawals were estimated using the operating times and pumping capacity of the pumping stations from 1992 to 1999 in the Han River and Nakdong River basins. Water requirements were estimated by adding the evapotranspiration of the crops and infiltrations in the irrigated area. Evapotranspiration from the paddies was calculated by the FAO modified Penman method with observed daily weather data. The monthly water management efficiency was analyzed for each pumping stations and the district offices of KARICO (Korea Agricultural and Rural Infrastructure Corporation). The efficiencies of 59 pumping stations in the Han River basin varied from 19% to 135%, and the average was 61%. The efficiencies of 146 pumping stations in the Nakdong River basin ranged from 17% to 190%, and the average was 72%. There were no good correlations between the water management efficiency and pump capacity or irrigated area, it showed that the water management efficiency was affected by the traditional water management practices rather than the scale of irrigation district.

Development of Water Quality Management Model for Rural Area Using Decision Support System (의사결정지원기법을 이용한 농촌유역 수질관리모형의 개발)

  • 양영민;권순국
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.783-788
    • /
    • 1999
  • In this study, a decision support system (DSS) was developed to calculate optimal wastetreatment cost, treatment level and treatment quantity of various pollutants for applying for in rural basin. The DSS includes a gegraphic informatino system (GIS), relational database system (RDBS), water quality models(Loading function , WASP5), watershed pollution load calculation module(SPLC), optimal water quality management plan to satisfy the water quality regulations. The system can be modified by user to trace the optimal condition for decision. The effort was conducted to apply the developed DSS to select the for optimal water quality management plan small rural basin called Kwanri Stream.

  • PDF