• 제목/요약/키워드: Management Assessment

검색결과 6,291건 처리시간 0.034초

환경물질을 제외한 전자부품의 신뢰성 평가 방법 연구 (Reliability Assessment Methods for Electronic Component Removed Environmental Materials)

  • 이종범;조재립
    • 대한안전경영과학회지
    • /
    • 제9권6호
    • /
    • pp.55-68
    • /
    • 2007
  • Recently, all kind of 21C-typed electronic goods show the tendency of hightechnology and digital convergence rapidly. Also, failure mechanism which differs from original goods concept presents. Today, failure mechanism which differs from one that was happened by restricted harmful environment material before adapted the raw of environment material is changing the paradigm of reliability engineering. Thus, when applied the environment matter of original and secondary material at the electronic goods were removed, reliability assessment method and prediction stay into low level. This study suggests as solution to overcome these phenomenon. The study on the management method of environmental restriction substances which is recognized as important element in the reliability assessment about environment material of electronic goods and the study on reliability assessment method of PWB without environment material are progressed.

환경물질을 제외한 전자부품의 신뢰성평가 방법 연구 - Pb와 Br을 제거한 PWB를 중심으로 - (Reliability Assessment Methods for Electronic Component Removed Environmental Materials - focused on Printed Wiring Board without Pb and Br -)

  • 이종범;조재립
    • 한국품질경영학회:학술대회논문집
    • /
    • 한국품질경영학회 2006년도 춘계학술대회
    • /
    • pp.381-391
    • /
    • 2006
  • When the environmental materials of the raw and sub material to applied in electronic goods removed, the reliability assessment and the forecasting is stand on the low level and in case of neglect, it is acting as latent defect that can be connected to large size disaster. In this research, the study on the management method of environmental restriction substances which is recognized as important element in the reliability assessment about environmental material of electronic goods and the study on reliability assessment method of PWB without environmental material are progressed

  • PDF

중소기업을 위한 스마트공장 도입 준비도 진단 체계 개발 및 적용사례연구 (Developing a Framework for Assessing Smart Factory Readiness of SMEs and Case Study)

  • 조지훈;신완선
    • 품질경영학회지
    • /
    • 제47권1호
    • /
    • pp.1-15
    • /
    • 2019
  • Purpose: The purpose of this study is to support SMEs' introduction of smart factories during the $4^{th}$ Industrial Revolution era. Through this study, we developed the readiness assessment framework for SMEs. This study draws practical implications for improving the readiness of SMEs to introduce smart factories. Methods: Readiness Assessment Framework Design method, Case Studies Analysis Results: This study identified SMEs suitable for smart factories and identified key issues for nonconforming companies. And the diagnostic framework has been determined whether it works in a real-life SME environment. Conclusion: In order to succeed in the smart factory deployment, readiness assessment for SMEs should be performed as necessary. Prior to the introduction of smart factories, quality innovation activities should be carried out according to factory level.

INFLUENCE FACTOR-BASED RISK ASSESSMENT METHODOLOGY FOR CONSTRUCITON

  • Hyunsoo Kim;Hyunsoo Lee;Moonseo Park;Kwang-pyo Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1231-1236
    • /
    • 2009
  • Many work-related risk factors can cause construction site hazards. Therefore, safety management begins with measuring the magnitude of risk involved in a project. This study proposes a methodology for risk assessment of major trades at a particular construction site. To assess risk, this methodology integrates hazard severity and frequency, and their magnitude is calculated based on actual work-site hazards. This methodology also considers the influence factors that affect the frequency of work-related hazards. To select the appropriate influence factors, a two step approach is deployed. First, the predominant factors are identified through a literature review. Second, a selective process filters out the influence factors that are difficult to analyze quantitatively, and these extracted factors are weighted using expert surveys. Finally, the factors are combined and a quantitative risk assessment methodology is proposed.

  • PDF

천장 크레인 운전 작업부하 평가모델 개발 (Development of a Workload Assessment Model for Overhead Crane Operation)

  • 권오채;이상기;조영석;박정철;정기효;유희천;한성호
    • 대한인간공학회지
    • /
    • 제26권2호
    • /
    • pp.45-59
    • /
    • 2007
  • The operating tasks of overhead crane have caused undue stress to the operators from physical, mental, and environmental workload. Existing workload assessment models for musculoskeletal disorders such as OWAS, RULA, and QEC have limited applicability to the crane operating tasks because they focus mainly on physical factors and do not consider the relative importance of each factor. The present study was to develop a workload assessment model customized to overhead crane operation, following a systematic process: (1) analyzing task characteristics, (2) selecting workload factors, (3) developing assessment methods, (4) establishing action levels, and (5) computerizing the assessment model. Based on literature review, worksite survey, and focus group interview, 4 physical factors (awkward posture, static posture, repetitive motion, and excessive force), 6 mental factors (visual demand, auditory demand, task complexity and difficulty, time urgency, work schedule related stress, and safety related stress), and 4 environmental factors (noise, vibration, dust, and temperature) were selected and their rating scales and relative weights were determined. Then, based on the workload assessment results of 8 overhead cranes operated at different workplaces, the action levels of each factor category were established. Finally, the crane operation assessment model was computerized for effective analysis and report preparation. The present approach is applicable to develop a customized workload assessment model for an operating task under consideration.

Assessment of ASP-PMIS Quality in Korea

  • Lee, Seul-Ki;Yu, Jung-Ho
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권3호
    • /
    • pp.9-17
    • /
    • 2011
  • Web-based PMIS (Project Management Information System) has played significant role in construction management processes in Korea. As the use of web-based PMIS increases, regular quality assessment to identify user's requirements is necessary. However, there have been rare research efforts for quality assessment of web-based PMIS. This study aims to assess the quality of web-based PMIS, especially ASP-PMIS (Application Service Provider based PMIS) that is widely used in Korean construction industry. The assessment factors of ASP-PMIS quality were adopted from previous research and empirically confirmed using exploratory factor analysis. ISA (Importance-Satisfaction Analysis), which is a variation of original IPA (Importance-Performance Analysis), were selected for the assessment and analysis method in this research. A total of 253 completed questionnaires, composed of 23 assessment items, were collected from the ASP-PMIS users in Korea (construction managers and constructors), and they were used to analyse the quality of the systems. Some possible contributions of this research are: it introduces a simple and easy-to-use tool for assessing the quality of ASP-PMIS with a set of quality assessment factors that are selected from previous researches and empirically tested; it provides the quality assessment results of ASP-PMIS in Korea so that ASP-PMIS providers in Korea can understand the users' opinion on their systems; it also identified that the urgent factors that require immediate attention to improvement. However, further researches are to be required on the following areas: enhancing the quality assessment factors in terms of their relation to the success of ASP-PMIS and to the users' performance; assessing and analyzing the quality of individual ASP-PMIS; establishing continuous improvement systems institutionally and instrumentally.

데이터 품질관리 프로세스 평가를 위한 프로세스 참조모델 (The Process Reference Model for the Data Quality Management Process Assessment)

  • 김선호;이창수
    • 한국전자거래학회지
    • /
    • 제18권4호
    • /
    • pp.83-105
    • /
    • 2013
  • 데이터의 품질을 평가하기 위해서 데이터 자체의 품질을 측정하는 방법과 데이터 품질을 관리하는 프로세스를 측정하는 방법이 활용되고 있다. 최근에는 조직의 데이터 품질을 보장 및 인증하기 위해 데이터 품질관리 프로세스의 성숙도를 측정하는 방법을 활용하고 있다. 이러한 추세에 따라 본 논문에서는 데이터 품질관리의 프로세스 성숙도를 평가하는데 필요한 프로세스 참조모델을 제시한다. 우선 데이터 품질관리 프로세스 성숙도 평가 모델의 개요를 제시한다. 그리고, 프로세스 성숙도 평가에 기본이 되는 프로세스 참조모델을 제시한다. 여기서는 프로세스 도출 방안, 데이터 품질관리의 기본 원칙, SPICE 프로세스 참조 모델의 기본 개념을 기초로 하여 프로세스 참조모델의 구성과 세부 프로세스를 개발하였다. 그리고 본 모델의 특징 및 개선점을 ISO 8000-150의 프로세스와 비교하여 설명하였다.

녹색건축 인증제도 평가항목에 대한 설계 실무자 및 사용자 의식 차이 분석 - 공동주택 인증 평가항목을 중심으로 - (Analyzing the Differential Views between the Designers and the Users on Certification Assessment Criteria of the G-SEED System - Focused on Certification Assessment Criteria for Apartment Buildings -)

  • 최여진
    • KIEAE Journal
    • /
    • 제15권6호
    • /
    • pp.87-92
    • /
    • 2015
  • Purpose: The green building certification system in Korea was introduced in 2002 and developed as an improvement version of the G-SEED(Green Standard for Energy and Environmental Design) system in 2013. This study conducts surveys targeting architectural designers and users on significance of certification assessment criteria for apartment buildings on the G-SEED system and examines the differential views between the two groups on assessment criteria. Method: First, The AHP(Analytic Hierarchy Process) method was used to find importance of assessment criteria and then the importances were compared with weighted points on the certification standard. Second, the t-test was used to investigate differential views between designer and user groups on certification assessment criteria based on drawn importances. Result: (1) While designer group considered land use and transportation, energy and environmental pollution, and water circulation management as more important, user group did material and resource, maintenance management, ecological environment, and indoor environment as more important. (2) Based on t-test results, sustainable energy, water circulation system, site management, habitat, acoustical environment, and light environment were found to be different on importance between the two groups.

건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로- (Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction -)

  • 복훈;김형태;강경식
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

화학물질관리법상의 유해화학물질 안전관리 개선방안 연구 : 안전성평가 사례 중심 (Development on the Safety Management System of Hazardous Chemicals under the Chemicals Control Act: Focusing on Safety Assessment System)

  • 유병태;이은별;김종구
    • 한국안전학회지
    • /
    • 제34권3호
    • /
    • pp.96-101
    • /
    • 2019
  • Chemicals Control Act have been strengthened to control more safely hazardous chemicals from 2015. In particular, the standards for the installation and management of handling facilities was enhanced with specific regulations depending on type of the facilities and the hazardous chemicals. However, some standards for handling facilities caused difficulties in implementing the strengthened standards due to various field conditions, such as lack of physical space. The Ministry of Environment is implementing Safety Assessment System (SAS) to solve these problems since 2018. However, many plants have difficulties in preparing alternative methods to pass the safety evaluation. The purpose of this study was to review and analyze the SAS and to suggest alternative measures in terms of management and technical aspects through the case study of hydrochloric acid storage tanks. The following safety solutions were suggested for handling facilities that had insufficient the space and capacity for the retaining wall due to physical space. Firstly, insufficient space was resolved by introducing equipment relocation or demolition, and retaining wall expansion. Secondly, the wall of the surrounding buildings was used as an alternative to the retaining wall with additional chemical resistant treatment. Finally, sensor installation and facility inspection were suggested as ways to improve chemical safety. Therefore, improvement of chemical accident prevention system is required not only in terms of facilities supplementation but also management aspect. The results of this study are expected to be available for similar facilities and will be based on the preparation of additional safety assessment as alternatives measures in the future.