DOI QR코드

DOI QR Code

Assessment of ASP-PMIS Quality in Korea

  • Published : 2011.12.30

Abstract

Web-based PMIS (Project Management Information System) has played significant role in construction management processes in Korea. As the use of web-based PMIS increases, regular quality assessment to identify user's requirements is necessary. However, there have been rare research efforts for quality assessment of web-based PMIS. This study aims to assess the quality of web-based PMIS, especially ASP-PMIS (Application Service Provider based PMIS) that is widely used in Korean construction industry. The assessment factors of ASP-PMIS quality were adopted from previous research and empirically confirmed using exploratory factor analysis. ISA (Importance-Satisfaction Analysis), which is a variation of original IPA (Importance-Performance Analysis), were selected for the assessment and analysis method in this research. A total of 253 completed questionnaires, composed of 23 assessment items, were collected from the ASP-PMIS users in Korea (construction managers and constructors), and they were used to analyse the quality of the systems. Some possible contributions of this research are: it introduces a simple and easy-to-use tool for assessing the quality of ASP-PMIS with a set of quality assessment factors that are selected from previous researches and empirically tested; it provides the quality assessment results of ASP-PMIS in Korea so that ASP-PMIS providers in Korea can understand the users' opinion on their systems; it also identified that the urgent factors that require immediate attention to improvement. However, further researches are to be required on the following areas: enhancing the quality assessment factors in terms of their relation to the success of ASP-PMIS and to the users' performance; assessing and analyzing the quality of individual ASP-PMIS; establishing continuous improvement systems institutionally and instrumentally.

Keywords

References

  1. H.C. Howard, R.E. Levitt, B.C. Paulson, J.G. Pohl and C.B. Tatum, "Computer integration: reducing fragmentation in the AEC industry", Journal of Computing in Civil Engineering, Vol.3, No.1, pp.18-32. 1989. https://doi.org/10.1061/(ASCE)0887-3801(1989)3:1(18)
  2. P. Nitithamyong, and M.J. Skibniewski, "Web-based construction project management systems: how to make them successful?", Automation in Construction, Vol.13, pp.491-506, 2004 https://doi.org/10.1016/j.autcon.2004.02.003
  3. E.M. Rojas, and A.D. Songer, "Web-centric systems: A new paradigm for collaboration engineering", Journal of Management Engineering, Vol.15, No.1, pp.39-45, 1999 https://doi.org/10.1061/(ASCE)0742-597X(1999)15:1(39)
  4. C.M. Tam, "Use of the Internet to enhance construction communication: Total Information Transfer System", International Journal of Project Management, Vol.17, No.2, pp.107-110, 1999. https://doi.org/10.1016/S0263-7863(97)00077-X
  5. Z.M. Deng, H. Li, C.M. Tam, Q.P. Shen and P.E.D. Love, "An application of the Internet-based project management system", Automation in construction, Vol.10, pp.239-246, 2001. https://doi.org/10.1016/S0926-5805(99)00037-0
  6. P. Nitithamyong, and M.J. Skibniewski, "Success/Failure factors and performance measures of web-based construction project management systems: Professional viewpoint", Journal of construction engineering and management, Vol.132, No.1, pp.80-87. 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(80)
  7. M.C. Hurtado, "New survey points to spending growth", ENR, Vol.246, No.21, p.21. 2003.
  8. Y. Jung, and G.E. Gibson, "Planning for computer integrated construction", Journal of Computing in Civil Engineering, Vol.13, No.4, pp.217-225, 1999. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
  9. F. Pena-Mora, S. Vadhavkar, E. Perkins, and T. Weber, "Information technology framework for large-scale projects", Journal of Computing in Civil Engineering, Vol.13, No.4, pp.226-237, 1999. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(226)
  10. J. Anderson, A. Baldwin, M. Betts, C. Cater, A. Hamilton, E. Stokes, and A.T. Thorpe "A framework for measuring IT innovation benefits", Electronic Journal of Information Technology in construction, Vol. 5, pp.57-72, 2000.
  11. L. Marsh, and R. Flanagan, "Measuring the costs and benefits of information technology in construction", Engineering construction and Architectural management, Vol.7, No.4, pp.423-435, 2000. https://doi.org/10.1108/eb021164
  12. F. Pena-Mora, and S. Tanaka, "Information technology planning framework for Japanese general contractors", Journal of management Engineering, Vol.18, No.3, pp.138-149, 2002. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(138)
  13. P.E.D. Love, Z. Irani and D. Edwards, "Researching the investment of information technology in construction: an examination of evaluation practices", Automation in Construction, Vol.14, No.4, pp.569-582, 2005. https://doi.org/10.1016/j.autcon.2004.12.005
  14. R. Stockdale, C. Standing and P.E.D. Love, "Propagation of a parsimonious framework for evaluating information systems in construction", Automation in construction, Vol. 15, pp.729-736, 2006. https://doi.org/10.1016/j.autcon.2005.09.005
  15. J.H. Yu, and H.S. Lee, "Evaluation Model for Information Systems Benefits in Construction Management Process", Journal of Construction Engineering and Management, Vol.132, No.10, pp.1114-1121, 2006. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:10(1114)
  16. T. Kern, J. Kreijger and L. Willcocks, "Exploring ASP as sourcing strategy: theoretical perspectives, propositions for practice", The Journal of Strategic Information Systems, Vol.11, No.2, pp.153-177, 2002. https://doi.org/10.1016/S0963-8687(02)00004-5
  17. J.H. Yu, and H.S. Lee, "Success Factors for Implementing Construction Project Management Information System(PMIS) based on the Characteristics of Construction Management Tasks", Journal of Architectural Institute of Korea, Vol.20, No.5, pp.103-110, 2004.
  18. F.D. Davis, "Perceived usefulness, perceived ease of use, and user acceptance of information technology", MIS Quartely, Vol.13, No.3, pp.319-340, 1989. https://doi.org/10.2307/249008
  19. B.Y Chung, M.J. Skibniewski, C.L.J. Henry, and Y.H. Kwak, "Analyzing Enterprise Resource Planning System Implementation Success Factors in the Engineering. Construction Industry", Journal of computing civil engineering, Vol.22, No.4, pp.373-382, 2008. https://doi.org/10.1061/(ASCE)0887-3801(2008)22:6(373)
  20. W.H. DeLane, and E.R. McLean, "Information system success: The Quest for the Dependent Variable", information systems research, Vol.3, No.1, pp.60-95, 1992. https://doi.org/10.1287/isre.3.1.60
  21. W.H. DeLone, and E.R. McLean, "The DeLone and McLean Model of Information system success: A ten-year update", Journal of Management information systems, Vol. 19, No.4, pp.9-30, 2003. https://doi.org/10.1080/07421222.2003.11045748
  22. V. Venkatesh, and F.D. Davis, "Extrinsic and intrinsic motivation to use computers in the work place", Journal of Applied Psychology, Vol.22, No.14, pp.1111-1132, 2000.
  23. L. Raymond, and F. Bergeron, "Project Management Information Systems: An Empirical Study of Their Impact on Project Managers and Project Success", International Journal of Project Management, Vol.26, No.2, pp.213-220, 2008. https://doi.org/10.1016/j.ijproman.2007.06.002
  24. H.Y. Lin, and P.Y. Hsu, "ERP Systems Success: An Integration of IS Success Model and Balanced Scorecard", Journal of Research and Practice in Information Technology, Vol.38, No.3, pp. 215-228, 2006.
  25. P.B. Seddon, "A respecification and extension of the DeLone and McLean model of IS success", Information Systems Research. Vol.8, No.3, pp.240-252, 1997. https://doi.org/10.1287/isre.8.3.240
  26. P.B. Seddon, and M.Y. Kiew, "A partial test and development of Delone and Mclean's model of IS success", Australian Journal of Information Systems, Vol.4, No.1, pp.90-104, 1994.
  27. L.F. Pitt, R.T. Watson and C.B. Kavan, "Service Quality: A Measure of Information Systems Effectiveness", MIS Quartely, Vol.19, No.2, pp.319-340, 1995.
  28. B.L. Myers, L.A. Kappelman and V.R. Prybutok, "A comprehensive model for assessing the quality and productivity of the information systems function: Toward a theory for Information systems Assessment", Information Resources Management Journal, Vol.10 No.1, 1997.
  29. Y.S. Jung, and C.H. Jung, "An Empirical Analysis on the Success Factors of ASP Services", Information System Research, Vol.14, No.2, pp.25-53, 2005.
  30. G. Kim, "A Scale Development for Measuring User Satisfaction with GKMS", Journal of the korea Association for Policy Analysis and Evaluation, Vol. 17, No.4, pp.117-148, 2007.
  31. J.H. Park, J.G. Kim, J.W. Kim and H.S. Lee, "Deriving an ASP Success Model: An application to Small Business", Business Information Research, Vol.14, No.1, pp.43-58, 2004.
  32. M.H. Jeo, and C.K. Lee, "An Empirical Analysis on Success Factor and Success Model of Information System: Focus on a local government", Journal of Korea Administration, Vol.31, No.1, pp.145-162. 1997.
  33. J.G. Edward, B. Glassberg, Y. J. Kim, S. Lawrence and S. K. Shin, "An experimental investigation of Web-based information systems success in the context of electronic commerce", Decision Support Systems, Vol.39, No.3, pp.485-503, 2005. https://doi.org/10.1016/j.dss.2004.06.015
  34. C. Liu, and K.P. Arnett, "Exploring the factors associated with web site success in the context of electronic commerce", Information & Management, Vol. 38, pp.23-33, 2000. https://doi.org/10.1016/S0378-7206(00)00049-5
  35. Y.C. Han, and S.T. Lim, "An Empirical Study on Evaluating Effectiveness of Information System", Journal of management Research, Vol.12, No.1 pp.257-288, 1997.
  36. D.P. Ballou, and H.L. Pazer, "Cost/quality tradeoffs for control procedures in information systems", Omega, Vol.15, No.6, pp.509-521, 1987. https://doi.org/10.1016/0305-0483(87)90009-0
  37. A. Parasuraman, V.A. Zeithaml and L.L. Berry, "SERVQUAL: A multi-item scale for measuring consumer perceptions of sesrvice quality", Journal of Retailing, Vol. 64, No.1, pp. 14-40, 1988.
  38. J. Pallant, SPSS Survival Manual Open University Press, Buckingham and Philadelphia, 2001.
  39. J.F. Hair, L. Ronald, R.E.A. Tatham and B. William, "Multivariate Data Analysis, Multivariate Data Analysis", Prentice-Hall International, 1998.
  40. J.O. Nunnalyy, "Psychometric Theory", New York, McGraw-Hill, 1978.
  41. H.F. Kaiser, "A second generation little jiffy", Psychometrika, Vol.35, No.4, pp.401-415, 1970. https://doi.org/10.1007/BF02291817
  42. M.S. Bartlett, "A note on the multiplying factors for various chi square approximations", Journal of the Royal Statistical Society, Vol.16, pp. 296-298, 1954.
  43. M.J. Norusis, "SPSS for windows, Professional Statistics, Release 5", SPSS Inc., Chicago, 1992.
  44. B. Li, A. Akintoye, P.J. Edwards and C. Hardcastle, "Critical success factors for PPP/PFI projects in the UK construction industry", Construction Management and Economics", Vol.23, No.5, pp.459-471, 2005. https://doi.org/10.1080/01446190500041537
  45. T. Aksorn, and B.H.W. Hadikusumo, "Critical success factors influencing safety program performance in Thai construction projects", Safety Science, Vol.46, No.4, pp.709-727, 2008. https://doi.org/10.1016/j.ssci.2007.06.006
  46. J.C. Nunnally, Psychometric theory (2nd ed.), New York, McGraw-Hill, 1978.
  47. S.K. Lee, and J.H. Yu, "Critical Success Factors for Project Management Information System in Construction", Journal of construction engineering and Project Management. Vol.1, No.1, pp.25-30, 2011. https://doi.org/10.6106/JCEPM.2011.1.1.025
  48. S. Hudson, G. A. Miller and P. Hudson, "The Role of Research in Improving Tourism and Hospitality Services: Measuring Service Quality", CABI Publications, 2006.
  49. J.A. Matilla, and J.C. James, "Importance-Performance analysis", Journal of Marketing, Vol. 41 No.3, pp. 77-79, 1977.
  50. H. Oh, "Revisiting importance-performance analysis", Tourism Management, Vol.22, pp.617-627, 2001. https://doi.org/10.1016/S0261-5177(01)00036-X
  51. J. Tonge, and S.A. Moore "Importance-satisfaction analysis for marine-park hinterlands: A Western Australian case study", Tourism Management, Vol. 28, pp.768-776, 2007. https://doi.org/10.1016/j.tourman.2006.05.007
  52. J.W. Park, Y.S. Lee, K.W. Park, "A study on the importance and satisfaction of Airline service quality", Journal of the korean contents association, Vol.8, No.2, pp.164-172, 2008.
  53. Y.M. Jung, Y.K. Kim and S.S. Lee, "A Study on the Measurement and Improvement of Academic Library Service Quality by ISA(Importance-Satisfaction Analysis)", Journal of Korean library and Information Science Society, Vol.41, No.1, pp. 255-272, 2010. https://doi.org/10.16981/kliss.41.1.201003.255
  54. S.H. Park, D.Y. Kwak and B.W. Chung, "Importance-Satisfaction Analysis of Tourist Gala: Evaluation of Boryong Mud Festival", The Tourism Sciences Society of Korea, Vol. 32, No.4, pp.145-161, 2008.
  55. T.H. Kim, J.M. Ha, J.M. Lim and J.J. Park, "An analysis on indicator of water taxi user service in seoul using Importance Performance Analysis(IPA)", Journal of korean society of civil engineers, Vol. 29, No.5, pp.587-595, 2009.
  56. A. Parasuraman, V. Zeithaml and L.L. Berry, "A conceptual model of service quality and its implications for future research", Journal of Marketing, Vol. 49, pp. 41-50, 1985.
  57. S. Llosa, J.L. Chandon and C. Orsingher, "An empirical study of SERVQUAL's dimensionality", The Services Industries Journal, Vol.18, No.2, pp.16-44, 1998. https://doi.org/10.1080/02642069800000017
  58. R. Ladhari, "A review of twenty years of SERVQUAL research", International Journal of Quality and Service Sciences, Vol.1, No.2, pp.172-198, 2009. https://doi.org/10.1108/17566690910971445

Cited by

  1. Identifying macro-environmental critical success factors and key areas for improvement to promote public-private partnerships in infrastructure vol.21, pp.4, 2014, https://doi.org/10.1108/ECAM-08-2013-0078
  2. Business Process Evaluation and Case Study for Sequential Application of BPM vol.2, pp.2, 2012, https://doi.org/10.6106/JCEPM.2012.2.2.036
  3. Investigating the Impacts of the Quality of Project Management Information System on Project Performance and User Satisfaction vol.41, pp.3, 2018, https://doi.org/10.11627/jkise.2018.41.3.050