• Title/Summary/Keyword: Maintenance cycle analysis

Search Result 412, Processing Time 0.03 seconds

The Influences of Maintenance Hemodialysis on Sleep Architecture and Sleep Apnea in the Patients with Chronic Renal Failure (만성신부전 환자에서 혈액투석 유지요법이 수면구조 및 수면 무호흡에 미치는 영향)

  • Park, Yong-Geun;Lee, Sang-Haak;Choi, Young-Mee;Ahn, Seok-Joo;Kwon, Soon-Seog;Kim, Young-Kyoon;Kim, Kwan-Hyoung;Song, Jeong-Sup;Park, Sung-Hak;Moon, Hwa-Sik
    • Tuberculosis and Respiratory Diseases
    • /
    • v.47 no.6
    • /
    • pp.824-835
    • /
    • 1999
  • Background: Sleep-related breathing disorders are commonly found in patients with chronic renal failure and particularly, sleep apnea may have an influence on the long-term mortality rates in these patients. Maintenance hemodialysis is the mainstay of medical measures for correcting the metabolic derangements of chronic renal failure but it is uncertain whether it may alleviate sleep disorders including sleep apnea. Methods: Forty seven patients on maintenance hemodialysis were surveyed with the sleep questionnaire about their clinical symptoms related to sleep disorders. Among them, 15 patients underwent the polysomnography and their blood levels of urea nitrogen, creatinine, electrolytes and the arterial blood gases in the nights before and following hemodialysis were measured. Results: Forty(85.1%) of the 47 patients complained of the symptoms associated with sleep-wake cycle disturbances, 55.3% experienced snoring and 27.7% reported witnessed apneas. The duration of REM sleep increased significantly in the nights after hemodialysis compared to the nights without hemodialysis(p<0.05) and the percentage of total sleep time comprising NREM sleep decreased significantly in the nights following hemodialysis compared to the nights before hemodialysis(p<0.05). The percentage of total sleep time consisting of the stage 1 and 2 NREM sleep showed the trend for a decrease in the nights after hemodialysis(p=0.051), while the percentage of total sleep time comprising the stage 3 and 4 NREM sleep did not change between nights. The obstructive sleep apnea was more predominant type than the central one in both nights and there were no differences in the apnea index and the apnea-hypopnea index between the nights. The decrease in the blood level of urea nitrogen, creatinine, potassium and phosphorus was observed after hemodialysis(p<0.05), but the differences of parameters measured during polysomnography between the nights did not correlate with the changes of biochemical factors obtained on the two nights. Arterial blood gas analysis showed that pH was significantly greater in the nights after hemodialysis than in the nights before hemodialysis(p<0.05), but there were no correlations between the parameters examined during polysomnography and the parameters of arterial blood gas analysis(p<0.05). Conclusion: These results suggest that chronic renal failure is an important systemic disorder which is strongly associated with sleep disorders. Maintenance hemodialysis, although it is a widely accepted measure to treat chronic renal failure, did not significantly modulate the sleep architecture and the severity of sleep apnea. Thus, taking the patients with chronic renal failure into account, it is advisable to try not only to find a substantial way for correcting metabolic derangements but also to consider the institution of more effective treatments for sleep disorders.

  • PDF

Resolution Method of Hazard Factor for Life Safety in Rental Housing Complex (임대주택단지의 생활안전 위해요인 해소방안)

  • Sohn, Jeong-Rak;Cho, Gun-Hee;Kim, Jin-Won;Song, Sang-Hoon
    • Land and Housing Review
    • /
    • v.8 no.1
    • /
    • pp.1-11
    • /
    • 2017
  • The government has been constructing and supplying public rental housing to ordinary people in order to stabilize housing since 1989. However, the public rental houses initially supplied to ordinary people are at high risk for safety accidents due to the deterioration of the facilities. Therefore, this study is aimed to propose a solution to solve the life safety hazards of the old rental housing complex as a follow-up study of Analysis of Accident Patterns and Hazard Factor for Life Safety in Rental Housing Complex. Types of life safety accidents that occur in public rental housing complexes are sliding, falling, crash, falling objects, breakage, fire accidents, traffic accidents and criminal accidents. The types of safety accidents that occur in rental housing complexes analyzed in this study are sliding, crashes, falling objects, and fire accidents. Although the incidence of safety accidents such as falling, breakage, traffic accidents and crime accidents in public rental housing complexes is low, these types are likely to cause safety accidents. The method of this study utilized interviews and seminar results, and it suggested ways to solve the life safety hazards in rental housing complexes. Interviews were conducted with residents and managers of rental housing complexes. Seminars were conducted twice with experts in construction, maintenance, asset management, housing welfare and safety. Through interviews and seminars, this study categorizes the life safety hazards that occur in rental housing complexes by types of accidents and suggests ways to resolve them as follows. (1) sliding ; use of flooring materials with high friction coefficient, installation of safety devices such as safety handles, implementation of maintenance, safety inspections and safety education, etc. (2) falling ; supplementation of safety facilities, Improvement of the design method of the falling parts, Safety education, etc. (3) crash ; increase the effective width of the elevator door, increase the effective width of the lamp, improve the lamp type (U type ${\rightarrow}$ I type), etc. (4) falling objects and breakage ; design of furniture considering the usability of residents, replacement of old facilities, enhancement of safety consciousness of residents, safety education, etc. (5) fire accidents ; installation of fire safety equipment, improvement by emergency evacuation, safety inspection and safety education, etc. (6) traffic accidents ; securing parking spaces, installing safety facilities, conducting safety education, etc. (7) criminal accidents; improvement of CCTV pixels, installation of street lights, removal of blind spots in the complex, securing of security, etc. The roles of suppliers, administrators and users of public rental housing proposed in this study are summarized as follows. Suppliers of rental housing should take into consideration the risk factors that may arise not only in the design and construction but also in the maintenance phase and should consider the possibility of easily repairing old facilities considering the life cycle of rental housing. Next, Administrators of rental housing should consider the safety of the users of the rental housing, conduct safety checks from time to time, and immediately remove any hazardous elements within the apartment complex. Finally, the users of the rental housing needs to form a sense of ownership of all the facilities in the rental housing complex, and efforts should be made not to cause safety accidents caused by the user's carelessness. The results of this study can provide the necessary information to enable residents of rental housing complexes to live a safe and comfortable residential life. It is also expected that this information will be used to reduce the incidence of safety accidents in rental housing complexes.

The Study for an Improved Methodology of Rail Investment Rating System (철도투자평가체계 개선방안의 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Jin, Hak-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2192-2204
    • /
    • 2011
  • Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.

  • PDF

Factors Affecting the Minimum Detectable Activity of Radioactive Noble Gases (방사성 노블가스 측정을 위한 최소검출방사능 산출의 조절인자)

  • Park, Ji-young;Ko, Young Gun;Kim, Hyuncheol;Lim, Jong-Myoung;Lee, Wanno
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.3
    • /
    • pp.301-308
    • /
    • 2018
  • Anthropogenic radioactive noble gases formed by nuclear fission are significant indicators used to monitor the nuclear activity of neighboring countries. In particular, radioactive xenon, owing to its abundant generation and short half-life, can be used to detect nuclear testing, and radioactive krypton has been used as a tracer to monitor the reprocessing of nuclear fuels. Released radioactive noble gases are in the atmosphere at infinitesimal amounts due to their dilution in the air and their short half-life decay. Therefore, to obtain reliable and significant data when performing measurement of noble gases in the atmosphere, the minimum detectable activity (MDA) for noble gases should be defined as low as possible. In this study, the MDA values for radioactive xenon and krypton were theoretically obtained based on the BfS-IAR system by collecting both noble gases simultaneously. In addition, various MDA methods, confidence level and analysis conditions were suggested to reduce and optimize MDA with an assessment of the factors affecting MDA. The current investigation indicated that maximizing the pretreatment efficiency and performance maintenance of the counter were the most important aspects for Xe. In the case of Kr, since sample activities are much higher than those of Xe, it is possible to change the target MDA or to simplification of the analysis system.

Performance and Economic Analysis for Rut-resistance Pavement Considering Life Cycle Cost (LCC를 고려한 내유동포장의 공용성 및 경제성 분석에 관한 연구)

  • Do, Myungsik;Han, Daeseok;Yoo, Inkyoon;Lee, Soohyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.783-796
    • /
    • 2006
  • Rut-resistance pavement is adopted to prevent pavement from plastic deformation since 1998. The objective of this paper is to investigate performance and economic efficiency between rut-resistance pavement and conventional hot-mix asphalt(HMA) on national highway. The pavement deterioration models incorporated in HDM-4 have been calibrated and adapted to local road conditions based on observed pavement rut-depth data. Based on calibration result of HDM-4, the economic evaluation including road agency cost and user cost is performed for 34 road pavement sections. Furthermore, we presented optimal timing for maintenance and performance levels subject to different budget. We found that rut-resistance pavement is performing better than conventional hot-mix asphalt in most road sections. Furthermore, we confirmed that the application of HDM-4 is useful for pavement project planning and evaluation. More investigation is needed to enlarge the scope of the pavement data and to explore more deeply socio-environmental cost and delay cost.

A Dynamic Behavior Evaluation of the Curved Rail according to Lateral Spring Stiffness of Track System (궤도시스템의 횡탄성에 따른 곡선부 레일의 동적거동평가)

  • Kim, Bag-Jin;Choi, Jung-Youl;Chun, Dae-Sung;Eom, Mac;Kang, Yun-Suk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.517-528
    • /
    • 2007
  • Domestic or international existing researches regarding rail damage factors are focused on laying, vehicle conditions, driving speed and driving habits and overlook characteristics of track structure (elasticity, maintenance etc). Also in ballast track, as there is no special lateral spring stiffness of track also called as ballast lateral resistance in concrete track, generally, existing study shows concrete track has 2 time shorter life cycle for rail replacement than ballast track due to abrasion. As a result of domestic concrete track design and operation performance review, concrete track elasticity is lower than track elasticity of ballast track resulting higher damage on rail and tracks. Generally, concrete track has advantage in track elasticity adjustment than ballast track and in case of Europe, in concrete track design, it is recommended to have same or higher performance range of vertical elastic stiffness of ballast track but domestically or internationally review on lateral spring stiffness of track is very minimal. Therefore, through analysis of service line track on site measurement and analysis on performance of maintenance, in this research, dynamic characteristic behaviors of commonly used ballast and concrete track are studied to infer elasticity of service line track and experimentally prove effects of track lateral spring stiffness that influence curved rail damage as well as correlation between track elasticity by track system and rail damage to propose importance of appropriate elastic stiffness level for concrete and ballast track.

  • PDF

Correction of Latent Errors in Pavement Deterioration Data using Statistical Methods (통계기법을 활용한 포장파손자료의 잠재오차 보정)

  • Han, Daeseok;Do, Myungsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.587-598
    • /
    • 2012
  • Successful implementation of infrastructure asset management system can be started with rich and reliable data. However, measurement errors in the data have always existed in the real world caused for many unknown reasons. It disturbs maintenance activities of agencies, and makes negative effects to reliability of research results on forecasting deterioration process and life cycle cost. Above all, it makes a contradiction that road agencies cannot believe their inspection data surveyed by their hands. It is particularly serious in the road pavement management field. Although road agencies are well recognized the fact, inspecting without measurement error would be a great challenge. Considering the facts, this paper aimed to suggest statistical error processing methods to correct latent error included in pavement surface inspection data. As alternatives, this paper suggested two methods based on probability distribution to consider structure of error and reliability of the data. The suggested methods were empirically tested by using pavement inspection data from Korean National Highway. As the result, this paper confirmed that conventional error processing that just removes only visible errors is not enough to cover uncertainty in pavement deterioration process. The suggested methods would be useful for improving reliability of analysis results required for road infrastructure asset management.

Traffic Demand Forecasting Method for LCCA of Pavement Section (도로포장의 생애주기비용 분석을 위한 장기 교통수요 추정)

  • Do, Myungsik;Kim, Yoonsik;Lee, Sang Hyuk;Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2057-2067
    • /
    • 2013
  • Traffic demand forecasting for pavement management in the present can be estimated using the past trends or subjective judgement of experts instead of objective methods. Also future road plans and local development plans of a target region, for example new road constructions and detour plans cannot be considered for the estimate of future traffic demands. This study, which is the fundamental research for developing objective and accurate decision-making support system of maintenance management for the national highway, proposed the methodology to predict future traffic demands according to 4-step traffic forecasting method using EMME in order to examine significance of future traffic demands affecting pavement deterioration trends and compare existing traffic demand forecasting methods. For the case study, this study conducted the comparison of traffic demand forecasting methods targeting Daejeon Regional Construction and Management Administration. Therefore, this study figured out that the differences of traffic demands and the level of agent costs as well as user costs between existing traffic demand forecasting methods and proposed traffic demand forecasting method with considering future road plans and local development plan.

A Study on Segmentation Process of the K1 Reactor Vessel and Internals (K1 원자로 및 내부구조물 절단해체 공정에 대한 연구)

  • Hwang, Young Hwan;Hwang, Seokju;Hong, Sunghoon;Park, Kwang Soo;Kim, Nam-Kyun;Jung, Deok Woon;Kim, Cheon-Woo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.4
    • /
    • pp.437-445
    • /
    • 2019
  • After the permanent shutdown of K1 in 2017, decommissioning processes have attracted great attention. According to the current decommissioning roadmap, the dismantling of the activated components of K1 may start in 2026, following the removal of its spent fuel. Since the reactor vessel (RV) and reactor vessel internal (RVI) of K1 contain massive components and are relatively highly activated, their decommissioning process should be conducted carefully in terms of radiological and industrial safety. For achieving maximum efficiency of nuclear waste management processes for K1, we present activation analysis of the segmentation process and waste classification of the RV and RVI components of K1. For RVI, the active fuel regions and some parts of the upper and lower active regions are classified as intermediate-level waste (ILW), while other components are classified as low-level waste (LLW). Due to the RVI's complex structure and high activation, we suggest various underwater segmentation techniques which are expected to reduce radiation exposure and generate approximately nine ILW and nineteen very low level waste (VLLW)/LLW packages. For RV, the active fuel region and other components are classified as LLW, VLLW, and clearance waste (CW). In this case, we suggest in-situ remote segmentation in air, which is expected to generate approximately forty-two VLLW/LLW packages.

Geotechnical investigation on causes and mitigation of ground subsidence during underground structure construction (터널 및 지중매설물 시공에 따른 지반함몰 발생 원인 및 대책에 대한 지반공학적 조사 연구)

  • Choi, Shin-Kyu;Back, Seung-Hun;An, Jun-Beom;Kwon, Tae-Hyuk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.143-154
    • /
    • 2016
  • This study investigated the occurrences, causes, and mitigation of the recent ground subsidence and underground cavity generation events in Korea. Two main causes of ground subsidence are (1) the soil erosion by seepage during tunneling and earth excavation and (2) the damage of underground pipes. The main cause of the soil erosion during tunneling was the uncontrolled groundwater flow. Especially, when excavating soft grounds using a tunnel boring machine (TBM), the ground near TBM operation halt points were found to be the most vulnerable to failure. The damage of underground pipes was mainly caused by poor construction, material deterioration, and differential settlement in soft soils. The ground subsidence during tunneling and earth excavation can be managed by monitoring the outflow of groundwater and eroded soils in construction sites. It is expected that the ground subsidence by the underground pipe damage can be managed or mitigated by life cycle analysis and maintenance of the buried pipes, and by controlling the earth pressure distribution or increasing the bearing capacity at the upper ground of the buried pipes.