• Title/Summary/Keyword: Maintenance and Repair

Search Result 1,061, Processing Time 0.025 seconds

Damage Types of Levee and its Maintenance and Repair (제방의 손상 유형 및 보수보강)

  • Moon, Dae-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.144-169
    • /
    • 2010
  • In 2002, property loss caused by failure or leakage of existing river levee structures was about 1.8 trillion in Korean Won, and furthermore in which damages of river structures are getting more severe due to characteristics of extremely extraordinary rain such as torrential rain in the locality or guerrilla heavy rain. In this regards, this paper collects and analyzes those damage records and costs for repair by statistic method, and moreover categorizes the causes of failure, erosion and overtopping of levee structures in large and small scale rivers threatened frequently by typhoon and heavy rainfall. It is believed that the results from the analyses can be used as a basic source in developing criteria of standards for design, construction, maintenance and inspection(or diagnosis) of hydraulic structures such as levee and drain conduit.

  • PDF

A Case Study on the Cost Effectiveness Analysis of Depot Maintenance Using Simulation Model and Experimental Design (시뮬레이션 모형과 실험설계법을 활용한 창정비 비용대 효과 분석 사례)

  • Kim, Sung-Kon;Lee, Sang-Jin
    • Journal of the Korea Society for Simulation
    • /
    • v.26 no.3
    • /
    • pp.23-34
    • /
    • 2017
  • This paper is to study the simulation model of depot maintenance system that analyzes logistics supportability such as component availability and cost of target equipment. A depot maintenance system could repair or maintain multiple components simultaneously. The key performance indicators of this system are component availability, repair cycle time, and maintenance cost. The simulation model is based on the engine maintenance process of army aviation depot. This study combines the NOLH(Nearly Orthogonal Latin Hypercube) experimental design method, to composes 33 scenarios, with a multiple regression analysis to find out major factors that influence on key performance indicators. This study is significant in providing a cost-effectiveness analysis on depot maintenance system that is capable of maintaining multiple components at the same time.

An Evaluation on the Flexural Strength of Concrete Beams Repaired by Polymer Resin (폴리머계로 보수한 철근콘크리트 보의 휨성능 평가)

  • Kim, Byung-Guk;Shin, Young-Soo;Hong, Gi-Suop;Hong, Yung-Kyun;Choi, Oan-Chul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.1 no.1
    • /
    • pp.107-112
    • /
    • 1997
  • A series of reinforced concrete beams was tested to evaluate the flexural performance of the repaired RC beams. The key parameters for this study were the size and location of the patch, and the repair materials, including polymer, polymer-cementitious and cementitious materials. The repaired specimens failed by a typical flexural mode with minor interfacial bond failure. Beams repaired with polymer, polymer-cementitious and cementitious materials recover 100%, 91%, and 97% of the flexural strength respectively, while beams with cement mortar lose approximately 30% of the strength. Compared with the pressure injection techniques the specimens repaired with patching techniques show low flexural strength, with significant interfacial bond failure. Location and size of the repaired part do not affect the recovering performance. Interfacial behavior between repair and strengthening materials is the major influencing factor for the composite structures.

  • PDF

On Optimal Burn-in and Maintenance Policy

  • Na, Myung Hwan;Son, Young Nam
    • Communications for Statistical Applications and Methods
    • /
    • v.9 no.3
    • /
    • pp.865-870
    • /
    • 2002
  • Burn-in is a widely used method to eliminate the initial failures. Preventive maintenance policy such as age replacement is often used in field operation. In this paper burn-in and maintenance policy are taken into consideration at the same time. The properties of the corresponding optimal burn-in times and optimal maintenance policy are discussed.

Optimum Periodic Preventive Maintenance Time for a System with Imperfect Maintenance (불완전보전을 고려한 시스템의 최적 정기 예방보전 시기)

  • 정영배
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.221-226
    • /
    • 1994
  • Almost preventive maintenance policies assumed that the system after pm has failure rate as before pm with probability p and as good as new with probability 1-p. This paper considers the s-expected cost of the model with imperfect periodic preventive maintenance that increasing minimal repair costs at failure and obtains the optimum periodic preventive maintenance time. Numerical example are shown in which the failure time of the system has gamma distribution.

  • PDF

Optimum Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges (내진성능확보를 위한 교량의 최적유지보수계획법)

  • 고현무;이선영;박관순;김동석
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.5
    • /
    • pp.29-36
    • /
    • 2002
  • In the maintenance and retrofit planning of a bridge system, the optimal strategy for inspection and repair are suggested by minimizing the expected total life-cycle cost, which includes the initial cost, the costs of inspection, repair, and failure. Degradation of seismic performance is modeled by using a damage function. And failure probability is computed according to the degree of damage detection by random vibration theory and the event tree analysis. As an example to illustrate the proposed approach, a 10-span continuous bridge structure is used. The numerical results show that the optimum number of the inspection and the repair are increased, as the seismic intensity is increased and the soil condition of a site becomes more flexible.

The Development of the Knowldege-Based Electric Fault Diagnosis and Maintenance System for Overhead Cranes (지식베이스를 이용한 천정크레인의 전기고장 진단 및 처방 시스템 개발)

  • Choi, Seung-Young;Kim, Sunn-Ho
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.1
    • /
    • pp.71-85
    • /
    • 1994
  • Overhead cranes which carry heavy items in construction or production areas consist of structure and electric modules. More than 80% of breakdowns bring out of the electric module. As operators do not know all about cranes, it sometimes takes much time to repair the cranes. In order to resolve this problem, the expert system which can diagnose causes of faults and give instructions for repair to operators, has been developed. The scope of the paper is limited to the electric module. First of all, analyzing symptoms and causes, we have developed a rule base with the expert system shell, EXSYS. Furthermore, for the facility maintenance including repair instructions against the causes, the instruction data base was developed with FOXPRO. On the other hand, for the help of user's understanding the fault causes, the graphic animation module which shows malfunctioning component ports or motions in 3D was developed with the graphic software, TOPAS VGA.

  • PDF

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • v.14 no.2
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

The Effects of Slab Size on Pavement Life Cycle Cost

  • Parsons, Timothy A.;Hall, Jim W.Jr
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.49-54
    • /
    • 2006
  • The purpose of this study was to determine the effect of expansion joint spacing (slab size) on the life cycle costs of owning Portland Cement Concrete (PCC) airfield pavements. Previous research has shown that slab size has a statistically significant impact on pavement performance. A probabilistic life cycle cost analysis was performed to determine if the effect of slab size on pavement performance would affect the total cost of ownership of PCC pavements. Data from 48 Pavement Condition Index (PCI) inspections of military and civilian airfields were used to develop probability-of-distress-by-condition curves, which were then used to develop probabilistic cost-of-repair-by-condition curves. A present worth life cycle cost analysis was then performed for various slab sizes, using construction costs, rehabilitation costs, and maintenance costs. Maintenance costs were determined by assuming a condition deterioration rate appropriate for each slab size and applying the cost-by-condition curves. The probabilistic cost-of-repair-by-condition curves indicated that smaller slabs are more expensive to repair on a unit cost basis. Life cycle cost analysis showed that larger slabs have a higher total cost of ownership than smaller slabs due to a faster rate of deterioration.

  • PDF

Two PM policies following the expiration of free-repair warranty (무료수리보증이 종료된 이후의 두 예방보전정책)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.20 no.6
    • /
    • pp.999-1007
    • /
    • 2009
  • This paper considers the optimal periodic preventive maintenance (PM) policy following the expiration of free-repair warranty. We assume that two periodic PM models with random maintenance quality which were proposed by Wu and Clements-Croome (2005) and Jung (2006b), respectively. Given the cost structure to the user during the cycle of the product, we derive the expressions for the expected cost rate per unit time. Also, we obtain the optimal PM number and the optimal PM period by minimizing the expected cost rate per unit time. The numerical examples are presented for illustrative purpose.

  • PDF