• Title/Summary/Keyword: Maintenance Management of Building

Search Result 543, Processing Time 0.027 seconds

A study on the Maintenance and management of Dongnaebu Government Office building as seen through Official Documents in the mid-19th century (19세기 중엽 동래부 관아(官衙)의 유지와 관리)

  • Song, Hye-Young
    • Journal of architectural history
    • /
    • v.31 no.5
    • /
    • pp.21-34
    • /
    • 2022
  • This study investigated the maintenance and management of government office building in Dongnaebu, Gyeongsangdo in the mid-19th century. In the late Joseon Dynasty, Dongraebu was an important point of national defense and a place of trade and diplomacy with Japan, so it had many government facilities. There are very few government facilities remaining today, and no structure remains. Therefore, it is possible to grasp information about the government facilities through the old materials. Currently, there are public documents related to the local government offices such as Eupji, Eupsarye, and Junggi. Through comparison between public documents, we will examine the maintenance and management of Dongnaebu government facilities in the mid-19th century. As a result of the research, Dongnaebu government facilities were supervised by department and managed like articles. In addition, the name, size, and changes were all recorded in the management of the goods, and the authority of responsibility was clearly stated. This result is because the remaining material has the purpose of preparation as an accounting book. As a result, it was found that the government facilities in the late Joseon Dynasty were managed by a systematic department with clear authority.

Preliminary Analysis on Artificial Intelligence-based Methodology for Selecting Repair and Rehabilitation Methods of Bridges (인공지능 기반의 교량 보수공법 선정 기술 개발을 위한 선행 분석)

  • Kim, Jonghyeob;Jung, In-Su;Yun, Won-Gun;Kim, Jung-Yeol;Park, In-Seok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.861-872
    • /
    • 2021
  • An efficient cost management is important for the domestic social overhead capital(SOC) based on a long lifecycle after 30 years since completion. Maintenance in South Korea have had the restrictions of consistency and suitability of decision-making by the establishment of a budget plan based on the company estimate and repair and reinforcement methods determined by the inspection and diagnosis engineers' subjective determination for each facility. To resolve this issue, the Korea Institute of Civil Engineering and Building Technology is currently in development of a methodology to propose an optimum maintenance method according to the damage of components by artificial intelligence. This study has deduced the primary factors by analyzing information generated during bridge maintenance and management as a prior step for the development of technologies, and conducted a preliminary analysis to select the optimum artificial intelligence technology.

BIM-based Property Management by Linking Maintenance with Financial Data for Commercial Building Projects

  • Shin, Hyeonju;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.418-425
    • /
    • 2022
  • For a commercial building, property managers play an important role in maximizing the benefit by reducing cost and increasing revenue in the operation and maintenance phase of the building. However, most of property managers are spending their time in monitoring facility managers who have little impact on cost reduction and maximization of operating profit. The industry practitioners have difficutlty in increasing the efficiency of thier work due to this work environment. In addition, both property managers(PMr) and facility managers(FMr) are dependent on the paper drawings and manuals, which can worsen the inefficiency and human errors are inevitable. This study aims to contribute to improvement of the current practice by developing a novel algorithm that autmatically links the facility information with 3D model, which can provide an efficient property management for commercial buildings.

  • PDF

Development of Defect-Repair Method-Cost Mapping Algorithm of Concrete Bridge Using BMS Data (BMS 데이터를 활용한 콘크리트 교량의 결함-공법-비용 매핑 알고리즘 개발)

  • Lee, Changjun;Park, Wonyoung;Cha, Yongwoon;Jang, Young-Hoon;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.267-275
    • /
    • 2023
  • As aged infrastructures have been increased, the importance of accurate maintenance costs and proper budget allocation for infrastructure become prominent under limited resources. This study proposed a mapping algorithm between representative defects, repair methods, and the estimated maintenance costs for concrete bridges. In this regard, using BMS (Bridge Management System) data analysis, bridge repair methods were classified and matched with defects according to their locations, types, and sizes. In addition, the maintenance costs were estimated based on the amount of work-load and quantity per unit using CSPR (Cost Standard Production Rate). As a result, the level of accuracy was an average of 85.1 % compared with the actual bill of quantity for Seoul bridge maintenance. The accuracy of maintenance costs is expected to be enhanced by considering the various site conditions such as pier height, extra charge conditions, additional equipment, etc.

A Fundamental Study on the Building Maintenance Using Intelligent Image Information (지능형 영상정보를 활용한 건축물 유지관리에 관한 기초연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Lim, Myung-Gu;Kim, Gu-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.116-117
    • /
    • 2013
  • The various photo data has a lot of information that had produce by the process of construction project lifecycle. Therefore construction site images is very important for effective management of the photograph information to transmit of accurate object information included in photography data. So the purpose of the study is to make application direction of intelligent image information that had image information in tandem with information of 5W1H for effective management of sites image in construction and maintenance phase.

  • PDF

A Case Study of maintenance cost estimation for military official residence building in BTL project (BTL사업 군관사 건축물의 유지관리비용 산정에 관한 연구)

  • Kwon, Bum-Joon;Kim, Hyun-Kyu;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.851-854
    • /
    • 2008
  • The purpose of this study is to predict the maintenance cost for military official residence building projects which were ordered for five military official residence building. In conducting this study, the adapted research method was to classify initial investment for each construction of the military official residence building and to estimate maintenance cost. This study was analyzed by studying the estimation of maintenance cost in the apartments and present value analysis method. The results of this research are as follows. 1) The initial investments was analyzed that the total construction cost would be 1,683,286 thousand won ; construction(79%), civil(3%), landscaping(2%), MEP(5%), heating and hot water supply system(5%), and water supply and sanitary system(6%) per square meter. 2) Based on the result analyzed above, the maintenance cost of the apartments was analyzed and then estimated the proper maintenance cost by using maintenance cost estimation method and present a value analysis method.

  • PDF

Applying BIM and GIS to Railway Maintenance Works in Taiwan

  • Liu, Li-Shih;Shr, Jin-Fang
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2015
  • Based on real jobs, this study was carried out the Railway maintenance works in Taiwan. It hopes to use Geographic Information System(GIS) and Building Information Modeling(BIM) for changing the maintenance model from "post-damage repair" to "preventive maintenance". Accordingly, this research will build a Railway Repairing Database that installs all repair data. This database will also connect to GIS so that can be the source of analysis and statistic for repair paln. The main results of research are as follows: I. All data stored on cloud space that raises the ability to manage and plan on repair. II. Simplify the file work and increase the quantity of case data to the manager who can get more reliable source. III. The data offer objective judgment to avoid subjective argument. IV. Add the GIS information to improve the maintenance because of good analisis.

Development of High-rise building Maintenance Robot System through Construction Automation based on the 4th Industrial Revolution (4차산업혁명기반 건설자동화를 통한 초고층 건축물 유지관리 로봇시스템 개발)

  • Kim, Jihun;Woo, Miso;Lee, Dongoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.18-19
    • /
    • 2020
  • Domestic and foreign high-rise buildings are expected to continue to increase in the future. In addition, recently, residents and landlords are demanding maintenance necessary to secure the performance of sustainable buildings, so an effective management plan is needed. Therefore, this study aims to develop customized technologies that can be effectively applied to building structures by comprehensively analyzing existing technology-based research cases. As a result, it is expected that this will serve as a stepping stone to present a s+ample of future technology development along with a reduction in labor dependency on maintenance and quality improvement.

  • PDF

Conceptualizing a Strategic Facilities Management Decision Framework for Heritage Building Maintenance Management

  • Adegoriola, Mayowa I.;Yung, Esther H.K.;Lai, Joseph H.K.;Chan, Edwin H.W.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.992-1000
    • /
    • 2022
  • Heritage buildings (HBs) as structures with historical and architectural relevance that form an integral part of contemporary society. HBs deserve to be protected for as long as possible to retain their significance. Therefore, prioritizing HB maintenance management (HBMM) is pertinent. However, the decision-making process of HBMM can be relatively daunting. The decision-making challenge may be attributed to the multiple 'stakeholders' expectation and requirement which needs to be met. To this end, professionals in the built environment have identified the need to apply the strategic concept of facilities management (FM) in decision making. However, studies exploring the application of FM in decision-making seem lacking. To bridge this gap, this study focuses on developing a framework for strategic decision-making HBMM, which helps achieve HBMM sustainability. At the study's inception, relevant works of literature in the domains of HBMM and FM were conducted. This review helped identify contemporary maintenance practices and their applicability to HBMM. Afterward, a conceptual framework to aid decision-making in HBMM was developed. This framework integrated the concept of FM scope (people, place, process, and technology) while ensuring that decisions and plans were made at strategic, tactical, and operational levels. The conceptual framework presents a holistic guide for professionals in HBMM to ensure that decision processes and outcomes are practical and efficient. It also contributes to the existing body of knowledge on the integration of FM in HBMM. Furthermore, it will help achieve HB sustainability through an effective decision-making process.

  • PDF

A Study on Cause of Facility Repair in Apartment Units Using Text Mining Techniques (텍스트 마이닝 기법을 이용한 공동주택 전유부 시설물의 보수원인 분석)

  • Kang, Ji-Yeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.269-270
    • /
    • 2023
  • As facilities in apartment unit by age, residents feel uncomfortable in their lives, but maintenance and management are not carried out properly. For the systematic maintenance of facilities, the derivation of facilities that require maintenance shall be preceded. This study aims to derive items that require intensive management among exclusive facilities. The purpose of this study is to analyze the history of repairing facilities through complaints about the exclusive use of public rental housing to identify the cause and to derive items that require intensive management of the exclusive use of apartment houses.

  • PDF