• 제목/요약/키워드: MAKESPAN

검색결과 167건 처리시간 0.027초

주문생산을 위한 APS 와 효율적 구매의 통합모델 (Integrated Supply Chain Model of Advanced Planning and Scheduling (APS) and Efficient Purchasing for Make-To-Order Production)

  • 정찬석;이영해
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2002년도 춘계공동학술대회
    • /
    • pp.449-455
    • /
    • 2002
  • This paper considers that advanced planning and scheduling (APS) in manufacturing and the efficient purchasing where each customer order has its due date and multi-suppliers exit We present a Make-To­Order Supply Chan (MTOSC) model of efficient purchasing process from multi-suppliers and APS with outsourcing in a supply chain, which requires the absolute due date and minimized total cost. Our research has included two states. One is for efficient purchasing from suppliers: (a) selection of suppliers for required parts; (b) optimum part lead­time of selected suppliers. Supplier selection process has received considerable attention in the business­management literature. Determining suitable suppliers in the supply chain has become a key strategic consideration. However, the nature of these decisions usually is complex and unstructured. These influence factors can be divided into quantitative and qualitative factors. In the first level, linguistic values are used to assess the ratings for the qualitative factors such as profitability, relationship closeness and quality. In the second level a MTOSC model determines the solutions (supplier selection and order quantity) by considering quantitative factors such as part unit price, supplier's lead-time, and storage cost, etc. The other is for APS: (a) selection of the best machine for each operation; (b) deciding sequence of operations; (c) picking out the operations to be outsourcing; and (d) minimizing makespan under the due date of each customer's order. To solve the model, a genetic algorithm (GA)-based heuristic approach is developed. From the numerical experiments, GA­based approach could efficiently solve the proposed model, and show the best process plan and schedule for all customers' orders.

  • PDF

표적 할당 및 사격순서결정문제를 위한 최적해 알고리즘 연구 (Exact Algorithm for the Weapon Target Assignment and Fire Scheduling Problem)

  • 차영호;정봉주
    • 산업경영시스템학회지
    • /
    • 제42권1호
    • /
    • pp.143-150
    • /
    • 2019
  • We focus on the weapon target assignment and fire scheduling problem (WTAFSP) with the objective of minimizing the makespan, i.e., the latest completion time of a given set of firing operations. In this study, we assume that there are m available weapons to fire at n targets (> m). The artillery attack operation consists of two steps of sequential procedure : assignment of weapons to the targets; and scheduling firing operations against the targets that are assigned to each weapon. This problem is a combination of weapon target assignment problem (WTAP) and fire scheduling problem (FSP). To solve this problem, we define the problem with a mixed integer programming model. Then, we develop exact algorithms based on a dynamic programming technique. Also, we suggest how to find lower bounds and upper bounds to a given problem. To evaluate the performance of developed exact algorithms, computational experiments are performed on randomly generated problems. From the results, we can see suggested exact algorithm solves problems of a medium size within a reasonable amount of computation time. Also, the results show that the computation time required for suggested exact algorithm can be seen to increase rapidly as the problem size grows. We report the result with analysis and give directions for future research for this study. This study is meaningful in that it suggests an exact algorithm for a more realistic problem than existing researches. Also, this study can provide a basis for developing algorithms that can solve larger size problems.

조선소 병렬 기계 공정에서의 납기 지연 및 셋업 변경 최소화를 위한 강화학습 기반의 생산라인 투입순서 결정 (Reinforcement Learning for Minimizing Tardiness and Set-Up Change in Parallel Machine Scheduling Problems for Profile Shops in Shipyard)

  • 남소현;조영인;우종훈
    • 대한조선학회논문집
    • /
    • 제60권3호
    • /
    • pp.202-211
    • /
    • 2023
  • The profile shops in shipyards produce section steels required for block production of ships. Due to the limitations of shipyard's production capacity, a considerable amount of work is already outsourced. In addition, the need to improve the productivity of the profile shops is growing because the production volume is expected to increase due to the recent boom in the shipbuilding industry. In this study, a scheduling optimization was conducted for a parallel welding line of the profile process, with the aim of minimizing tardiness and the number of set-up changes as objective functions to achieve productivity improvements. In particular, this study applied a dynamic scheduling method to determine the job sequence considering variability of processing time. A Markov decision process model was proposed for the job sequence problem, considering the trade-off relationship between two objective functions. Deep reinforcement learning was also used to learn the optimal scheduling policy. The developed algorithm was evaluated by comparing its performance with priority rules (SSPT, ATCS, MDD, COVERT rule) in test scenarios constructed by the sampling data. As a result, the proposed scheduling algorithms outperformed than the priority rules in terms of set-up ratio, tardiness, and makespan.

작업 준비비용 최소화를 고려한 강화학습 기반의 실시간 일정계획 수립기법 (Real-Time Scheduling Scheme based on Reinforcement Learning Considering Minimizing Setup Cost)

  • 유우식;김성재;김관호
    • 한국전자거래학회지
    • /
    • 제25권2호
    • /
    • pp.15-27
    • /
    • 2020
  • 본 연구는 일정계획을 위한 간트 차트(Gantt Chart) 생성과정을 세로로 세우면 일자형만 존재하는 테트리스(Tetris) 게임과 유사하다는 아이디어에서 출발하였다. 테트리스 게임에서 X축은 M개의 설비(Machine)들이 되고 Y축은 시간이 된다. 모든 설비에서 모든 종류(Type)의 주문은 분리 없이 작업 가능하나 작업물 종류가 다를 경우에는 시간지체 없이 작업 준비비용(SetupCost)이 발생한다는 가정이다. 본 연구에서는 앞에서 설명한 게임을 간트리스(Gantris)라 명명하고 게임환경을 구현 하였으며, 심층 강화학습을 통해서 학습한 인공지능이 실시간 스케줄링한 일정계획과 인간이 실시간으로 게임을 통해 수립한 일정계획을 비교하였다. 비교연구에서 학습환경은 단일 주문목록 학습환경과 임의 주문목록 학습환경에서 학습하였다. 본 연구에서 수행한 비교대상 시스템은 두 가지로 4개의 머신(Machine)-2개의 주문 종류(Type)가 있는 시스템(4M2T)과 10개의 머신-6개의 주문종류가 있는 시스템(10M6T)이다. 생성된 일정계획의 성능지표로는 100개의 주문을 처리하는데 발생하는 Setup Cost, 총 소요 생산시간(makespan)과 유휴가공시간(idle time)의 가중합이 활용되었다. 비교연구 결과 4M2T 시스템에서는 학습환경에 관계없이 학습된 시스템이 실험자보다 성능지표가 우수한 일정계획을 생성하였다. 10M6T 시스템의 경우 제안한 시스템이 단일 학습환경에서는 실험자보다 우수한 성능 지표의 일정계획을 생성하였으나 임의 학습환경에서는 실험자보다 부진한 성능지표를 보였다. 그러나 job Change 횟수 비교에서는 학습시스템이 4M2T, 10M6T 모두 사람보다 적은 결과를 나타내어 우수한 스케줄링 성능을 보였다.

데스크탑 그리드에서 자원 사용 경향성을 고려한 효율적인 스케줄링 기법 (An Efficient Scheduling Method Taking into Account Resource Usage Patterns on Desktop Grids)

  • 현주호;이승구;김상철;이민구
    • 한국정보과학회논문지:시스템및이론
    • /
    • 제33권7호
    • /
    • pp.429-439
    • /
    • 2006
  • 데스크탑 그리드는 컴퓨팅 집약적인 분산 어플리케이션을 수행하는데 있어서 유망한 플랫폼으로 부각되고 있다. 그러나 비 신뢰적이고 예측할 수 없는 자원의 특성 때문에 데스크탑 그리드에서 병렬 어플리케이션의 효율적인 스케줄링은 어려운 문제로 알려져 있다. 이에 따라서 빈약한 스케줄링 능력과 함께 현재 데스크탑 그리드는 고 처리 어플리케이션(high throughput application)의 실행에는 적합하지만 빠른 반환 시간을 요구하는 어플리케이션의 실행을 지원하는데 있어서 어려움을 갖는다. 빠른 반환 시간을 요구하는 어플리케이션의 효율적인 실행은 어플리케이션의 전체 실행 시간(makespan)을 축소함으로써 해결할 수 있는 문제로써 데스크탑 그리드가 이를 지원할 수 있게 하는 것은 매력적인 제안이 될 것이다. 본 논문에서는 데스크탑 그리드에서 효율적인 어플리케이션의 실행을 지원하기 위한 새로운 스케줄링 방법을 제안한다. 7주간의 시간동안 40대의 데스크탑에서 추출된 추적(trace) 데이타의 분석을 통해서 데스크탑 사용 경향성과 비 신뢰적인 데스크탑의 영향이 스케줄링의 성능을 개선하는데 있어서 활용 될 수 있음을 확인하였고 이 요소들을 고려함으로써 데스크탑 그리드의 비 신뢰적이고 예측할 수 없는 자원의 특성을 스케줄링에 적절하게 반영 할 수 있는 스케줄링 기법이 제안되었다. 제안된 스케줄링 기법은 실제 데스크탑들의 행동 패턴을 반영한 추적 기반 시뮬레이션(trace-driven simulation)을 통해서 기존의 스케줄링 방법들과 스케줄링 성능이 비교되었고 시뮬레이션 결과를 통해서 제안된 스케줄링 기법이 기존의 데스크탑 스케줄링 기법들에 비해서 병렬 어플리케이션의 전체 실행 시간을 축소하고 중지(suspension)와 장애(failure)의 발생 빈도를 줄이는 것을 보여준다.

패키징 인쇄를 위한 병렬 오프셋 인쇄 공정의 스케줄링 (Scheduling of Parallel Offset Printing Process for Packaging Printing)

  • 문재경;태현철
    • 한국포장학회지
    • /
    • 제28권3호
    • /
    • pp.183-192
    • /
    • 2022
  • 본 연구에서는 패키징 인쇄를 위한 병렬 오프셋 인쇄 공정의 스케줄링 문제를 다루었다. 문제에 대해 두 부분으로 구분하여 접근하였고, 각각 할당 문제와 차량 경로 문제를 적용하여 수리적으로 모형화 하였다. 스케줄링 모형의 현장 적용성은 실험을 통해 검토하였다. 실제 데이터로 구성된 작은 규모의 문제에서는 수리모형으로도 실용적인 시간 내에 최적해를 도출할 수 있었고 이와 비교하여 메타 휴리스틱의 성능을 확인하였다. 기업이 보유한 데이터를 바탕으로 문제 규모를 확장한 실험에서는, 수리모형의 최적해와 비교하여 메타 휴리스틱이 해의 품질을 보장하면서 시간적 효율성을 확보할 수 있었다. 본 연구는 수작업 위주의 기존 방식은 주체(작업자)에 따라 스케줄링의 결과에 불확실성이 존재하는 문제에 주목하였다. 이러한 불확실성은 전체 생산 비용의 증가를 가져오기 때문에 이를 개선할 수 있도록 실용적인 시간 내에 일관된 결과를 제공하는 스케줄링 모형을 제시하였다. 제시한 모형은 단일 라인과 병렬 라인 모두에 적용되어 작업자의 경험에 의존하던 기존의 방식을 개선하는데 도움이 될 것으로 판단되며, 시간 함수의 정의를 통해 다른 요인들을 반영하는 연구로의 확장이 가능하다는 의의를 갖는다. 향후 주문의 납기, 복수의 라인에서 동일 주문 인쇄, 동일하지 않은 라인의 인쇄 용량, 조색 난이도 등을 고려하는 연구로의 확장을 통해 패키징 인쇄 분야의 스마트 생산 시스템 도입에 기여할 수 있을 것으로 기대된다.

글로벌 공급사슬에서 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼 구축 (Development of Agent-based Platform for Coordinated Scheduling in Global Supply Chain)

  • 이정승;최성우
    • 지능정보연구
    • /
    • 제17권4호
    • /
    • pp.213-226
    • /
    • 2011
  • 글로벌 공급사슬 환경에서 글로벌하게 분산 조달, 생산, 유통하게 됨에 따라 전체 공급사슬의 스케줄을 최적화하기 위해서 공급사슬상의 개별 기업 혹은 공장의 스케줄링 최적화뿐만 아니라 각 개별 기업 혹은 공장의 스케줄을 긴밀하게 연계하는 것이 필요하게 되었다. 이는 경쟁과 협력을 동시에 하는 개별 기업 혹은 공장을 개별 에이전트로 보고 각 에이전트간 커뮤니케이션을 통해 개별 에이전트가 관할하는 스케줄러의 스케줄을 조정함으로써 가능해진다. 하지만 전통적인 스케줄링 연구는 개별 스케줄러의 최적화에 집중되어 있고, 에이전트 연구는 스케줄링 도메인에 적용한 예가 제한적이며 이 예도 개별 스케줄러 내의 최적화에 적용하거나 실제 현장 문제가 아닌 실험실 문제 수준에 그치고 있다. 따라서 본 연구에서는 전체 글로벌 공급사슬 스케줄의 최적화를 위해 개별 기업 혹은 공장 스케줄러의 스케줄링을 연계하는 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼을 구축하였다. 글로벌 공급사슬에서 경쟁협력 스케줄링을 위한 에이전트 기반 플랫폼을 구축하기 위해 첫째, 경쟁협력 스케줄링 분류 체계를 확립하고, 둘째, 경쟁협력 스케줄링을 위한 에이전트를 설계하고, 셋째, 경쟁협력 스케줄링을 위한 지식기반 의사결정 모델을 개발한 후, 넷째 조선산업에 적용 가능한 프로토타입 시스템을 개발했다. 이를 통해 글로벌 공급사슬상의 전체 스케줄의 품질과 에이전트간 커뮤니케이션의 노력에 대한 균형점을 찾을 수 있다. 이를 통해 공급사슬내 개별 기업 혹은 공장의 부분 최적화를 극복할 수 있는 대안을 제시할 것으로 기대한다.