Risk Assessment for the Converted Lump-sum Turnkey Project (전환 정액일괄도급 계약방식 프로젝트의 리스크 분석)

  • Hwang, Duk-Jin;Moon, Seung-Jae;Yoo, Ho-seon
    • Plant Journal
    • /
    • v.7 no.2
    • /
    • pp.39-43
    • /
    • 2011
  • Due to the recent uncertainty of market situations such as the escalation of petroleum prices, increased production capacities of plants, limitations of the available EPC (Engineering, Procurement, Construction) contractors, and the increase of raw material prices, EPC contractors have had a tendency to include a higher reserve contingency in the lump-sum turnkey contract price. In order to overcome the changes in the market, the plant project construction industry has started to apply the converted lump-sum turnkey contract in plant construction market. This study was focused to find the associated risks and to analyse the identified risks on recent trend of application of the new contract type, which is the converted lump-sum turnkey contract. It was recognized from the analysis that quality and cost have more high priority risks than other project objectives. This paper also suggests the mitigation plan for identified risks to achieve project objectives appropriate to the converted lump-sum turnkey project from the viewpoint of an EPC contractor keeping transparency with owner.

  • PDF

Licensing Contract between International Joint Venture Partners and Compensation Structure (국제합작투자에서 합작파트너 간 내부기술계약과 기술대가 지급방식 선택에 관한 연구)

  • Lee, Eung-Sok
    • Journal of Technology Innovation
    • /
    • v.15 no.1
    • /
    • pp.175-201
    • /
    • 2007
  • Licensing contracts between partners in International Joint Ventures(IJV) have not only aspects of relation contract, which is interdependent and long-term cooperative relationships in interpartner but also aspects of discrete contract which is exposed to opportunistic risk caused by IJV partners who maximize individual profit instead of joint payoff maximization. In this circumstance, appropriate compensation structures such as lump-sum and royalty can reduce conflicts and spur interpartner cooperation. In addition, compensation structures that stipulate each party's rights, duties, and responsibilities under various sets of environmental conditions have strong implications for transaction cost minimization and joint payoff maximization. On the other hands, compensation structures such as lump-sum and royalty in IJV licensing contract have benefits and costs depending on IJV partners uncertainty, partner dependency, and environment uncertainty. Therefore, the purpose of this paper is to empirically show how partner uncertainty, partner dependence and environment uncertainty influence compensation structure chosen by licensor in IJV.

  • PDF

Impacts of Contract types on Construction Project Performance - Cost Reimbursable and Lump Sum - (계약방식에 따른 건설프로젝트 성과의 비교분석 연구 - 실비정산방식과 총액계약방식을 중심으로 -)

  • Lee, Yoo-Seob;Hwang, Bon-Gang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.155-163
    • /
    • 2007
  • Multiple parties-owners, engineering and construction contractors, and suppliers involve the delivery process of capital facility projects in the construction industry, and each party obtains or provides their workforce, material, equipment, or service tied into specific contracts. Considering that construction projects are based on the contracted relationship between the parties and that contract types are one of the significant factors determining project success. it is critical for project stakeholder to select appropriate contract types for successful deliveries of projects. With these considerations, this paper assesses impacts of different contract types on project cost, schedule, safety, change, or rework. Analyzing data from real construction projects, the differences in project performance between two contract types, Cost Reimbursable and Lump Sum are measured and statistically tested to investigate if the differences are significant. For this analysis, performance metrics developed by Benchmarking and Metrics program, the Construction Industry Institute are used.

A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

Optimal Contract under the Nagoya Protocal for the Benefit Sharing (나고야의정서 하에서 생물유전자원 이용의 최적계약 연구)

  • Park, Hojeong;Jung, Byenggoan
    • Environmental and Resource Economics Review
    • /
    • v.26 no.1
    • /
    • pp.85-101
    • /
    • 2017
  • The objective of the Nagoya Protocol is to enhance biodiversity by the mean of economic incentives but there has been yet consistent lack of realized contracts between genetic resource users and holders due to the asymmetric information among the parties. This paper presents a principle-agent model to provide optimal contracts under asymmetric information in order to achieve the sustainable biological resource. The model concludes the royalty contracts over the fixed lump-sum benefit transfer as profit sharing mechanism.

Money and Capital Accumulation under Imperfect Information: A General Equilibrium Approach Using Overlapping Generations Model (불완전(不完全)한 정보하(情報下)의 통화(通貨)의 투자증대효과분석(投資增大效果分析): 중복세대모형(重複世代模型)을 이용한 일반균형적(一般均衡的) 접근(接近))

  • Kim, Joon-kyung
    • KDI Journal of Economic Policy
    • /
    • v.14 no.1
    • /
    • pp.191-212
    • /
    • 1992
  • This paper discusses the role of money in the process of capital accumulation where financial markets are impeded by contract enforcement problems in the context of overlapping generations framework. In particular, in less developed countries (LDCs) creditors may know little about the repayment capability of potential debtors due to incomplete information so that financial instruments other than money may not acceptable to them. In this paper the impediments to the operation of the private finanical markets are explicitly modelled. We argue that creditors cannot observe actual investment decisions made by the potential borrowers, and as a result, loan contracts may not be fully enforceable. Therefore, a laissez-faire regime may fail to provide the economy with the appropriate financial instruments. Under these circumstances, we introduce a government operated discount window (DW) that acts as an open market buyer of private debt. This theoretical structure represents the practice of governments of many LDCs to provide loans (typically at subsidized interest rates) to preferred borrowers either directly or indirectly through the commercial banking system. It is shown that the DW can substantially overcome impediments to trade which are caused by the credit market failure. An appropriate supply of the DW loan enables producers to purchase the resources they cannot obtain through direct transactions in the credit market. This result obtains even if the DW is subject to the same enforcement constraint that is responsible for the market failure. Thus, the DW intervention implies higher investment and output. However, the operation of the DW may cause inflation. Furthermore, the provision of cheap loans through the DW results in a worse income distribution. Therefore, there is room for welfare enhancing schemes that utilize the higher output to develop. We demonstrate that adequate lump sum taxes-cum-transfers along with the operation of the DW can support an allocation that is Pareto superior to the laissez-faire equilibrium allocation.

  • PDF

A Performance Analysis of Risk Management for International Engineering Project (해외 엔지니어링 사업의 리스크관리 성과분석)

  • Jung, Wooyong;Lee, Baul;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.99-107
    • /
    • 2017
  • In recent years, Korean engineering companies are actively entering into the international business. Although international engineering project is known to have lower risk rather that EPC construction project, Korean engineering companies' international sales profit is not as good. Therefore, this study analyzes the risks that are predicted before bid and actually occurred after award. In addition, this study shows the difference of risk depending on lump sum contract and cost reimburse contract. Finally, this study analyzes the difference of risk according to civil engineering and building engineering. This study provides industry to analyze risk more practically and helps academics to focus on risk to be studied more in the future.