In this paper presents a low power algorithm using a feasible cluster generation method considered glitch. The proposed algorithm is a method for reducing power consumption of a given circuit. The algorithm consists of a feasible cluster generation process and glitches removal process. So that glitches are not generated for the node to which the switching operation occurs most frequently in order to reduce the power consumption is a method for generating a feasible cluster. A feasible cluster generation process consisted of a node value set, dividing the node, the node aligned with the feasible cluster generation. A feasible cluster generation procedure is produced from the highest number of nodes in the output. When exceeding the number of OR-terms of the inputs of the selected node CLB prevents the signal path is varied by the evenly divided. If there are nodes with the same number of outputs selected by the first highest number of nodes in the input produces a feasible cluster. Glitch removal process removes glitches through the path balancing in the same manner as [5]. Experimental results were compared with the proposed algorithm [5]. Number of blocks has been increased by 5%, the power consumption was reduced by 3%.
In Korea Electric Power Corporation (or KEPCO), several Demand-Side Management (or DSM) program have been carried out to effectively meet electric power demand at least costs by modifying customers electricity use patterns. As one of them, KEPCO applies low-priced night thermal-storage power service for heat appliances to facilitate efficient use of power facilities by shifting relatively high daytime demands to night hours to build loads during the off-peak periods. In the market of heat-storage type water-heater, electric water-heater has been mostly used, but it has low energy efficiency and needs high capacity electric equipments. So in order to replace these electric water heaters, 15 HP air-source heat pump water heater is developed in Korea Electric Research Institute (or KEPRI). This paper shows that measurement system for performance testing of heat pump water heater is established and heating capacity and performance is analyzed and measured for out-door environmental change.
현재 에너지 소비가 증가하면서 환경적인 이슈로 전력 산업의 고도화 및 에너지 효율화에 대한 요구가 증가함에 따라 지능형 전력시스템과 같은 전력 IT 산업이 신 성장 동력으로 주목받고 있다. 지능형 전력 시스템을 통해 전력 수요에 따른 공급의 밸런스를 최적화하게 되면 에너지 수입 및 전력 인프라 건설, 운영에 소요되는 막대한 비용을 절감할 수 있고, 안정적으로 전력을 공급할 수 있게 된다. 하지만, 모든 설비 및 장비를 실시간 관리하기 위해서는 인력낭비가 발생할 뿐만 아니라, 응급 상황을 인지하지 못해 전력사고로 이어지는 문제가 발생할 수 있다. 따라서, 본 논문에서는 스마트폰 기반의 원격 제어 및 모니터링 기능을 구비한 지능형 수배전반 통합관리 시스템을 개발하였다. 기존의 수배전반 관리 시스템의 단점을 보완한 본 시스템은 저비용으로 효율성과 안정성을 대폭 향상 시킬 수 있어, 향후 전력 IT 산업의 발전에 크게 도모할 수 있을 것으로 판단된다.
JSTS:Journal of Semiconductor Technology and Science
/
제13권1호
/
pp.48-57
/
2013
This paper presents a power management system of the dye-sensitized solar cell (DSSC) for ubiquitous sensor network (USN) applications. The charge pump with a luminance-controlled oscillator regulates the load impedance of the DSSC to track the maximum power point (MPP) under various light intensities. The low drop-out regulator with a hysteresis comparator supplies intermittent power pulses that are wide enough for USN to communicate with a host transponder even under dim light conditions. With MPP tracking, approximately 50% more power is harvested over a wide range of light intensity. The power management system fabricated using $0.13{\mu}m$ CMOS technology works with DSSC to provide power pulses of $36{\mu}A$. The duration of pulses is almost constant around $80{\mu}s$ (6.5 nJ/pulse), while the pulse spacing is inversely proportional to the light intensity.
Gi-Lim Kim;Hyein Kim;Hyung-Woo Seo;Ji-Hwan Yu;Jin-Won Son
Nuclear Engineering and Technology
/
제54권12호
/
pp.4809-4818
/
2022
The decommissioning project of a nuclear facility is a large-scale process that is expected to take about 15 years or longer. The range of risks to be considered is large and complex, then, it is expected that various risks will arise in decision-making by area during the project. Therefore, in this study, the risk family derived from the Decommissioning Risk Management (DRiMa) project was reconstructed into a decommissioning project risk profile suitable for the Kori Unit 1. Two criteria of uncertainty and importance are considered in order to prioritize the selected 26 risks of decommissioning project. The uncertainty is scored according to the relevant laws and decommissioning plan preparation guidelines, and the project importance is scored according to the degree to which it primarily affects the triple constraints of the project. The results of risks are divided into high, medium, and low. Among them, 10 risks are identified as medium level and 16 risks are identified as low level. 10 risks, which are medium levels, are classified in five categories: End state of decommissioning project, Management of waste and materials, Decommissioning strategy and technology, Legal and regulatory framework, and Safety. This study is a preliminary assessment of the risk of the decommissioning project that could be considered in the preparation stage. Therefore, we expect that the project risks considered in this study can be used as an initial data for reevaluation by reflecting the detail project progress in future studies.
본 논문은 임베디드 시스템에서 불필요한 전력 소모를 감소하기 위해 개선된 예측 동적 전력 관리 구조와 태스크 스케줄링 알고리듬을 제안한다. 제안된 알고리듬은 불필요한 전력 소모를 최소화하기 위해 미리 스케줄링을 한다. 제안된 예측 동적 전력 관리는 수행 오버 헤드를 경감하기 위해서 스케줄링 라이브러리를 제공한다. 실험 결과 제안된 알고리듬은 동적 전력 관리를 적용한 LLF 알고리듬과 비교하여 평균 22.3% 전력 소모 감소를 보인다.
This paper proposes the hybrid fuel cell system that can solve disadvantages of existing fuel cell system and ensure high reliability and high stability. The system consists of PEM fuel cell, Ni-MH battery and power management system. In this system, when the power provided from the fuel cell is higher than the load power, the extra energy may be used to charge the Ni-MH battery. When the fuel cell can not provide enough energy to the load, the shortage of energy will be supplied by the Ni-MH battery. Experimental results show that the output voltage is regulated well during load variations. Also, high system efficiency is achieved.
In recent years, it becomes a worldwide trend that the power utilities focus their attention to Demand Side Management. Increasing Electric power consumption, they adopt a direct load management to accomplish low cost and stability of electric supply. Following this trend, KEPCO is researching a Direct Load Control System for Air Conditioner. This Paper presents the development results of the Direct Load Control System to Control electric power consumption of Conditioner in summer period this year.
Sensor nodes are the most significant part of a wireless sensor network that offers a powerful combination of sensing, processing, and communication. One major challenge while designing a sensor node is power consumption, as sensor nodes are generally battery-operated. In this study, we proposed the design of a low-power, long range-based wireless sensor node with flexibility, a compact size, and energy efficiency. Furthermore, we improved power performance by adopting an efficient hardware design and proper component selection. The Nano Power Timer Integrated Circuit is used for power management, as it consumes nanoamps of current, resulting in improved battery life. The proposed design achieves an off-time current of 38.17309 nA, which is tiny compared with the design discussed in the existing literature. Battery life is estimated for spreading factors (SFs), ranging from SF7 to SF12. The achieved battery life is 2.54 years for SF12 and 3.94 years for SF7. We present the analysis of current consumption and battery life. Sensor data, received signal strength indicator, and signal-to-noise ratio are visualized using the ThingSpeak network.
An energy management method of DC microgrids using voltage compensation term is proposed in this study. Droop control is often implemented to operate the DC microgrid. However, the droop control necessarily generates voltage variation. Energy flow is also difficult to control because the droop control mainly focuses on proportional load sharing. To solve these problems, the voltage compensation term based on the low-bandwidth communication is used to determine the operating band of the converter. Energy management and voltage variation minimization can be achieved by judging the operating band according to the magnitude of voltage compensation term. The validity of the proposed method is verified by simulation and experiments.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.