LOSS OF OFFSITE POWER TEST EXPERIENCE FOR YGN 4

  • Chi, Sung-Goo;Sung, Kang-Sik;Kim, Se-Chang;Kim, Eul-Ki;Eom, Young-Meen;Park, Young-Boo
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 한국원자력학회 1995년도 추계학술발표회논문집(1)
    • /
    • pp.230-234
    • /
    • 1995
  • The loss of offsite power test was successfully performed on YGN 4 to demonstrate that the reactor can be shutdown and the RCS can be maintained in a hot standby condition following a loss of all offsite Alternating Current (AC) power. Following the loss of main generator and all offsite AC power, the ensile emergency diesel generators were automatically started and the plant was stabilized via natural circulation. Plant conditions were maintained in hot standby for at least 30 minutes before offsite power was restored. Thus, the capability of equipment, controls and instrumentation necessary to remove decay heat from the core using only ensile emergency power was demonstrated, thereby satisfying all objectives and acceptance criteria of the test.

  • PDF

Probabilistic Safety Assessment of Offsite Power System Under Typhoon-induced High Wind (소외전력망의 태풍 동반 강풍 확률론적 안전성 평가)

  • Kim, Gungyu;Kwag, Shinyoung;Eem, Seunghyun;Jin, Seung-Seop
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • 제44권3호
    • /
    • pp.277-282
    • /
    • 2024
  • Recently, the intensity and frequency of typhoons have been increasing due to climate change, and typhoons can cause a loss of offsite power (LOOP) at nuclear power plants (NPPs). Therefore, it is necessary to prepare for typhoon-induced high winds through the probabilistic safety assessment (PSA) of offsite power systems. However, research on PSA for offsite power system in NPPs under typhoon-induced high winds is still lacking. In this study, PSA was performed for offsite power systems subjected to typhoon-induced high winds at the Kori NPP site, which has experienced frequent damages to its offsite power system among NPP sites in Korea. In order to perform PSA for typhoon-induced high winds in offsite power systems, the typhoon hazard at Kori NPP site was derived using logic tree and Monte Carlo simulation. Utilizing the fragility of components constituting the power system, performed a fragility analysis of the power system. Lastly, the probability that offsite power system will not be able to supply power to the NPP was derived.

ESTABLISHMENT OF A MAINTENANCE PROGRAM TO PREVENT LOSS OF OFFSITE POWER IN NUCLEAR POWER PLANTS

  • Lee, Eun-Chan;Na, Jang-Hwan
    • Nuclear Engineering and Technology
    • /
    • 제45권6호
    • /
    • pp.791-794
    • /
    • 2013
  • Since the Fukushima accident in 2011, the importance of the electrical systems in nuclear power plants (NPPs) has been emphasized. The result has been that NPP regulators are enhancing their monitoring of loss of offsite power (LOOP) events. Korea Hydro & Nuclear Power Co. (KHNP) is reviewing the status and issues related to LOOPs, and is attempting to establish specific countermeasures to prevent LOOPs, because they can have severe consequences in the complicated maintenance schedule during an outage. A starting point for preventing LOOPs is the control of the loss of voltage (LOV)-initiating components. In order to reflect this in the risk assessment program, an LOV monitor is being developed for use during plant outages.

A Study on the Analysis of Failures Related to Emergency Diesel Generators in Overseas Nuclear Power Plants (원전용 비상디젤발전기 국외 손상사례 분석에 관한 연구)

  • Chang, Jung-Hwan;Kim, Jin-Sung;Chung, Hae-Dong;Cho, Kwon-Hae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • 제5권1호
    • /
    • pp.32-37
    • /
    • 2009
  • The emergency diesel generator (EDG) in a nuclear power plant (NPP) shall start within 10 secondss and supply electrical power to engineered safety features within one minute and less if a loss of offsite power (LOOP), A design-basis event, or their combination occur. Each NPP has an EDG set consisting of two diesel generators for redundancy. In addition to the EDG set, an alternate Alternating Current Diesel Generator (AAC DG) is installed and shared by several units to cope with a station black out (SBO), i.e., loss of the offsite power concurrent with reactor trip and unavailability of the EDG set. The objective of this study is to analyze the failure data of emergency diesel generators reported in overseas nuclear power plants.

  • PDF

Effects of house load operation on PSA based on operational experiences in Korea

  • Lim, Hak Kyu;Park, Jong-hoon
    • Nuclear Engineering and Technology
    • /
    • 제52권12호
    • /
    • pp.2812-2820
    • /
    • 2020
  • House load operation (HLO) occurs when the generator supplies power to the house load without triggering reactor trips during grid disturbances. In Korea, the HLO capability of optimized power reactor 1000 (OPR1000) plants has prevented several reactor trips. Operational experiences demonstrate the difference in the reactor trip incidence due to grid disturbances between OPR1000 plants and Westinghouse plants in Korea, attributable to the availability of the HLO capability. However, probabilistic safety assessments (PSAs) for OPR1000 plants have not considered their specific design features in the initiating event analyses. In an at-power PSA, the HLO capability can affect the initiating event frequencies of general transients (GTRN) and loss of offsite power (LOOP), resulting from transients within the grid system. The initiating event frequencies of GTRN and LOOP for an OPR1000 plant are reduced by 17.7% and 78.7%, respectively, compared to the Korean industry-average initiating event frequencies, and its core damage frequency from internal events is reduced by 15.2%. The explicit consideration of the HLO capability in initiating event analyses makes significant changes in the risk contributions of the initiating events. Consequently, for more realistic at-power PSAs in Korea, we recommend incorporating plant-specific HLO-related design features when estimating initiating event frequencies.

Dynamic Analysis of Diesel Generators on Starting Large Induction Motors (대용량유도전동기 기동시의 비상용 디젤발전기 동특성 해석)

  • Han, Poong;Cho, Sung-Don
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 1987년도 정기총회 및 창립40주년기념 학술대회 학회본부
    • /
    • pp.139-142
    • /
    • 1987
  • It is important to evaluate the voltage characteristics of diesel generator as an emergency power supply in nuclear power plant. On loss of offsite power sources, emergency safeguard loads required to safely shutdown the reactor should be supplied by diesel generator. This paper presents the dynamic stability program to evaluate diesel generator performance as an emergency power system. The results Indicate the diesel generator ability to start the motors successfully seems to life in its impedances and inertias.

  • PDF

A Safety Improvement for the Design Change of Westinghouse 2 Loop Auxiliary Feedwater System (웨스팅하우스형 원전의 보조급수계통 설계변경 영향 평가)

  • Na, Jang Hwan;Bae, Yeon Kyoung;Lee, Eun Chan
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • 제9권1호
    • /
    • pp.15-19
    • /
    • 2013
  • The auxiliary feedwater is an important to remove the heat from the reactor core when the main feedwater system is unavailable. In most initiating events in Probabilistic Safety Assessment(PSA), the operaton of this system is required to mitigate the accidents. For one of domestic nuclear power plants, a design change of a turbine-driven auxiliary feedwater pump(TD-AFWP), pipe, and valves in the auxiliary system is implemented due to the aging related deterioration by long time operation. This change includes the replacement of the TD-AFWP, the relocation of some valves for improving the system availability, a new cross-tie line, and the installation of manual valves for maintenance. The design modification affects the PSA because the system is critical to mitigate the accidents. In this paper, the safety effect of the change of the auxiliary feedwater system is assessed with regard to the PSA view point. The results demonstrate that this change can supply the auxiliary feedwater from the TD-AFWP in the accident with the motor-driven auxiliary feedwater pump(MD-AFWP) unavailable due to test or maintenance. In addition, the change of MOV's normal position from "close" to "open" can deliver the water to steam generator in the loss of offsite power(LOOP) event. Therefore, it is confirmed that the design change of the auxiliary feedwater system reduces the total core damage frequency(CDF).

Assessment of RELAP5/MOD2 Code using Loss of Offsite Power Transient of Kori Unit 1 (고리 1호기 외부 전원 상실사고에 의한 RELAP5/MOD2코드 모델 평가)

  • Chung, Bub-Dong;Kim, Hho-Jung;Lee, Young-Jin
    • Nuclear Engineering and Technology
    • /
    • 제22권1호
    • /
    • pp.12-19
    • /
    • 1990
  • The Loss of Offsite Power Transient at 77.5% power which occurred on June 9, 1981 at the Kori Unit 1 PWR (Pressurized Water Reactor) is simulated using the RELAP5/MOD2 system thermal-hydraulics computer code. Major thermal-hydraulic parameters are compared with the available plant data. The comparison of the analysis results with the plant data demonstrates that the RELAP5/MOD2 code has the capability to simulate the thermal-hydraulic behaviour of PWRs under accident conditions of this type with accuracy, except the pressurizer pressure and level. The pressurizer pressure increase is sensitive to the in surge now it is believed that the interracial heat transfer in a horizontal stratified flow regime may be estimated low and the compression effect due to insurge flow may be high. In the nodalization sensitivity study it is found that S/G noding with junctions between bypass plenum and steam dome is preferred to simulate the S/G water level decreasing and avoid the spurious level peak at trubine trip.

  • PDF