• Title/Summary/Keyword: Long-Term Maintenance plan

Search Result 104, Processing Time 0.054 seconds

An Experimental Study on the Non-Exposure Composite Waterproofing Method used Adhesion Liquid and Sheet Integrate Waterproofing Material (점착형 도막.시트 일체형 방수재를 이용한 비노출용 복합 방수공법에 관한 실험적 연구)

  • Kim, Jin-Sung;Seon, Yun-Suk;Park, Jin-Sang;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.125-128
    • /
    • 2007
  • The problem of water leakage due to damaging waterproof in concrete structure, causes the impediment in a long term and shortened the life span of durability. There are a lot of techniques for repair and reinforcement to improve using environment. However, the improper construction which is unconsidered various environmental conditions, could effect to increase the maintenance expenses. Therefore, this study will be compared and estimated the adhesion liquid and sheet integrate waterproofing material, as analyzing the existing problem. For those result, we would like to arrange the alterative plan for the long durability and user needs of concrete structure.

  • PDF

A Study on the Proper Inspection Cycle Plan Through Reliability Analysis of One-Shot System (One-Shot System의 신뢰도 분석을 통한 적정 점검주기 방안 연구)

  • June-Young Lim;Hyeonju Seol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.1
    • /
    • pp.48-54
    • /
    • 2023
  • Guided missiles are a one-shot system that finishes their purpose after being used once, and due to the long-term storage until launch, the storage reliability is calculated during development, and performance is maintained through periodic inspections until the life cycle arrives. However, the reliability standards applied in the development of guided missiles were established by analyzing data accumulated by the United States during long-term operation in the country, and since they are different from our environment, the 00 guided missiles that have been deployed in the armed forces for more than 10 years under the premise that there is a difference from actual reliability. As a result of verifying the appropriateness of the current inspection cycle by analyzing the actual reliability of the missile, the necessity of changing the inspection period was derived because it was higher than the predicted reliability. It is proposed to build and utilize a lifespan management system that can systematically collect all data such as shooting and maintenance results by classification, and to establish a reliable reliability standard based on the accumulated data.

The policy issues for the apartment remodeling projects (공동주택 리모델링 정책의 현황과 개선방향)

  • Yoon Young-Sun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.42-45
    • /
    • 2002
  • Building remodeling concept includes maintenance & repair and renovation. We have long-term repair plan and special repair fund system for the apartment maintenance & repair, but they do not operate well. And laws and ordinances are being revised in relation with renovation. However, more policy improvement and assistance are needed in order to activate the apartment remodeling project. Especially preferential loan and tax reduction policy and deregulation of building provisions are the main tasks for the apartment remodeling.

  • PDF

A Study on the Service life of the Building Components in the Apartment Housing (공동주택 구성재의 내용년수 산정방법에 관한 연구)

  • Lee Kang-Hee;Chang Jung-Hee;Chae Chang-U
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

Development of Deep Learning Based Deterioration Prediction Model for the Maintenance Planning of Highway Pavement (도로포장의 유지관리 계획 수립을 위한 딥러닝 기반 열화 예측 모델 개발)

  • Lee, Yongjun;Sun, Jongwan;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.34-43
    • /
    • 2019
  • The maintenance cost for road pavement is gradually increasing due to the continuous increase in road extension as well as increase in the number of old routes that have passed the public period. As a result, there is a need for a method of minimizing costs through preventative grievance preventive maintenance requires the establishment of a strategic plan through accurate prediction of road pavement. Hence, In this study, the deep neural network(DNN) and the recurrent neural network(RNN) were used in order to develop the expressway pavement damage prediction model. A superior model among these two network models was then suggested by comparing and analyzing their performance. In order to solve the RNN's vanishing gradient problem, the LSTM (Long short-term memory) circuits which are a more complicated form of the RNN structure were used. The learning result showed that the RMSE value of the RNN-LSTM model was 0.102 which was lower than the RMSE value of the DNN model, indicating that the performance of the RNN-LSTM model was superior. In addition, high accuracy of the RNN-LSTM model was verified through the comparison between the estimated average road pavement condition and the actually measured road pavement condition of the target section over time.

Anomaly Detection System in Mechanical Facility Equipment: Using Long Short-Term Memory Variational Autoencoder (LSTM-VAE를 활용한 기계시설물 장치의 이상 탐지 시스템)

  • Seo, Jaehong;Park, Junsung;Yoo, Joonwoo;Park, Heejun
    • Journal of Korean Society for Quality Management
    • /
    • v.49 no.4
    • /
    • pp.581-594
    • /
    • 2021
  • Purpose: The purpose of this study is to compare machine learning models for anomaly detection of mechanical facility equipment and suggest an anomaly detection system for mechanical facility equipment in subway stations. It helps to predict failures and plan the maintenance of facility. Ultimately it aims to improve the quality of facility equipment. Methods: The data collected from Daejeon Metropolitan Rapid Transit Corporation was used in this experiment. The experiment was performed using Python, Scikit-learn, tensorflow 2.0 for preprocessing and machine learning. Also it was conducted in two failure states of the equipment. We compared and analyzed five unsupervised machine learning models focused on model Long Short-Term Memory Variational Autoencoder(LSTM-VAE). Results: In both experiments, change in vibration and current data was observed when there is a defect. When the rotating body failure was happened, the magnitude of vibration has increased but current has decreased. In situation of axis alignment failure, both of vibration and current have increased. In addition, model LSTM-VAE showed superior accuracy than the other four base-line models. Conclusion: According to the results, model LSTM-VAE showed outstanding performance with more than 97% of accuracy in the experiments. Thus, the quality of mechanical facility equipment will be improved if the proposed anomaly detection system is established with this model used.

Infrastructure Asset Management Policy and Strategy Development (사회기반시설물 유지관리를 위한 자산관리체계 도입 전략)

  • Chin, Kyung-Ho;Chae, Myung-Jin;Lee, Giu;Lee, Kyo-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.67-77
    • /
    • 2009
  • Infrastructure asset management can be defined as the long term and cost effective management strategy to meet the required service level. In most developed countries, the major motivations of the introduction of asset management are increment in number of assets, extension of maintenance field, accounting approaches of public facilities, performance-based FM(Facility Management), limitations of public funds and public-private partnership, life cycle cost approach, and the development of information technology. This paper discusses the strategic and stepwise methods of introducing infrastructure asset management. Strategic approaches are suggested to develop the practical methods of condition and value assessment of assets, and long-term capital investment plan for optimized decision making(ODM). Required systematic processes are analyzed in terms of resource and technical limitations and detailed implementation plan for each development phases are suggested.

An Improved Facility Management System for Public Facility Management Corporations (공공 시설관리기관의 시설관리시스템 개선에 관한 연구)

  • Kim, ChangDuk;Lee, HyunChul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.32-42
    • /
    • 2018
  • The importance of facility maintenance management cannot be overemphasized in that not only the value but also the performance of the facility is determined by the level of maintenance. The maintenance cost of the facility ranges from 3 to 10 times the initial construction cost depending the type and use of the facility over the life span. This maintenance importance is increased for the group of facilities and even more critical when the facilities compete for the limited budget with the limited resources such as manpower and equipment. This study analyzed sixteen public facility management corporations primarily for three items: 1) facility management system, 2) long-term rehabilitation plan, 3) the rehabilitation selection system. This paper provides and recommends the key elements of the facility maintenance management system based on the analysis of the sixteen corporations.

The Needs for Training Manpower and the Change in Construction Environment by Equipment Based BIM Design (설비분야 BIM 설계에 따른 건축환경 변화와 인재양성의 필요성)

  • Kim, Jong-Hwan
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.14 no.4
    • /
    • pp.157-165
    • /
    • 2011
  • The study figures out the alternatives of training BIM design experts which is the biggest obstacle in training manpower of professional BIM designer, the largest problem when the plant introduce BIM design about the change in Construction Environment by Equipment Based BIM Design in reality of design followed by equipment based BIM design, education institution plan. BIM is the system which is built to make these information be used easier and technique which enables design construction and maintenance in 3-dimensional virtual space by designing buildings in 3-dimensional space, and by data-basing the generated information of every life-cycle information. As the essential contents of the study, educational institutions with the public authority should invest the opening of educational programs, recruit of experts and development of textbooks from a long-term perspective. And also, the role of public institution is important above all for the development of construction industry.

Design of teleoperated robot system for nozzle dam maintenance in steam generator (증기발생기 노즐댐 취급용 원격조작 로봇 시스템 설계)

  • 황석용;김창회;김병수;이영광;김승호;이종민
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.815-820
    • /
    • 1993
  • Robotic technology has been grown up conspicuously by its versatility. KAERI has been involved in one of facets of robot industry to keep abreast of rapid evolving technologies In robotic field and has launched long-term R&D plan to assure the stable nuclear energy. In this paper, the latest development status of teleoperated robot system has been presented with emphasis the configuration of overall control system with 3 dimensional graphic system that provides operators with tele-presence situation. This robot system under development, composed of master-slave arm with controller and graphic simulator, is operated by a master manipulator to enable an installation and removal operation of nozzle dam system for steam generator. Evaluation and analysis has been carried out to get optimal parameters of robot system.

  • PDF