• 제목/요약/키워드: Long cable

검색결과 497건 처리시간 0.027초

Investigation on mechanics performance of cable-stayed-suspension hybrid bridges

  • Zhang, Xin-Jun
    • Wind and Structures
    • /
    • 제10권6호
    • /
    • pp.533-542
    • /
    • 2007
  • The cable-stayed-suspension hybrid bridge is a cooperative system of the cable-stayed bridge and suspension bridge, and takes some advantages and also makes up some deficiencies of both the two bridge systems, and therefore becomes strong in spanning. By taking the cable-stayed-suspension hybrid bridge, suspension bridge and cable-stayed bridge with main span of 1400 m as examples, the mechanics performance including the static and dynamic characteristics, the aerostatic and aerodynamic stability etc is investigated by 3D nonlinear analysis. The results show that as compared to the suspension bridge and cable-stayed bridge, the cable-stayed-suspension hybrid bridge has greater structural stiffness, less internal forces and better wind stability, and is favorable to be used in super long-span bridges.

Nonlinear analysis of cable-supported structures with a spatial catenary cable element

  • Vu, Tan-Van;Lee, Hak-Eun;Bui, Quoc-Tinh
    • Structural Engineering and Mechanics
    • /
    • 제43권5호
    • /
    • pp.583-605
    • /
    • 2012
  • This paper presents a spatial catenary cable element for the nonlinear analysis of cable-supported structures. An incremental-iterative solution based on the Newton-Raphson method is adopted for solving the equilibrium equation. As a result, the element stiffness matrix and nodal forces are determined, wherein the effect of self-weight and pretension are taken into account. In the case of the initial cable tension is given, an algorithm for form-finding of cable-supported structures is proposed to determine precisely the unstressed length of the cables. Several classical numerical examples are solved and compared with the other available numerical methods or experiment tests showing the accuracy and efficiency of the present elements.

서해대교 시공 공법 소개 (Construction Method of Seohae Grand Bridge)

  • 윤태섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2000년도 학술대회지
    • /
    • pp.255-266
    • /
    • 2000
  • Since 1993, Seohae grand bridge has been continued construction for 7 years and will be completed late this year. The bridge is a part of west sea castal highway and consists of 3 types of bridge including precast segmental method, free cantilever method and cable stayed bridge. A cable stayed bridge is the core of this bridge and it consists of 5 span, symetrical cable-stayed bridge with a total length of 990 m. The main span between two H-shaped pylons extending approximately 180 M above massive foundation of a cable stayed bridge is 470 m long and an approach span of that is 260 m long respectively. The circular cofferdam with 16 ea of 25 m diameter flat type sheet pile had been applied to construct foundation. The slipform method had been applied for forming of con'c of two H-shaped pylons with 3 cross beams respectively which is varied horizontally and vertically. The deck has been erected with balanced cantilever method using movable derrick crane. The stay cables is a bundle of parallel individually protected, 7 wire high tensile strands. The strands is hot deep galvanized and sheathed with a tight high density polyethylene coating. A petroleum wax fills all the inter-wire voids. The bundle of strands to prevent from deterioration due to the ambient problem covered with high density polyethylene pipe. The Isotension method has been applied for the stressing of cable strands to ensure uniformity of force in all the strands of a syay and such works has been performed on the stay specially provided in the pylon.

  • PDF

Monte Carlo simulation for the response analysis of long-span suspended cables under wind loads

  • Di Paola, M.;Muscolino, G.;Sofi, A.
    • Wind and Structures
    • /
    • 제7권2호
    • /
    • pp.107-130
    • /
    • 2004
  • This paper presents a time-domain approach for analyzing nonlinear random vibrations of long-span suspended cables under transversal wind. A consistent continuous model of the cable, fully accounting for geometrical nonlinearities inherent in cable behavior, is adopted. The effects of spatial correlation are properly included by modeling wind velocity fluctuation as a random function of time and of a single spatial variable ranging over cable span, namely as a one-variate bi-dimensional (1V-2D) random field. Within the context of a Galerkin's discretization of the equations governing cable motion, a very efficient Monte Carlo-based technique for second-order analysis of the response is proposed. This procedure starts by generating sample functions of the generalized aerodynamic loads by using the spectral decomposition of the cross-power spectral density function of wind turbulence field. Relying on the physical meaning of both the spectral properties of wind velocity fluctuation and the mode shapes of the vibrating cable, the computational efficiency is greatly enhanced by applying a truncation procedure according to which just the first few significant loading and structural modal contributions are retained.

Novel Roaming and Stationary Tethered Aerial Robots for Continuous Mobile Missions in Nuclear Power Plants

  • Gu, Beom W.;Choi, Su Y.;Choi, Young Soo;Cai, Guowei;Seneviratne, Lakmal;Rim, Chun T.
    • Nuclear Engineering and Technology
    • /
    • 제48권4호
    • /
    • pp.982-996
    • /
    • 2016
  • In this paper, new tethered aerial robots including roaming tethered aerial robots (RTARs) for radioactive material sampling and stationary tethered aerial robots (STARs) for environment monitoring are proposed to meet extremely-long-endurance missions of nuclear power plants. The flight of the proposed tethered aerial robots may last for a few days or even a few months as long as the tethered cable provides continuous power. A high voltage AC or DC power system was newly adopted to reduce the mass of the tethered cable. The RTAR uses a tethered cable spooled from the aerial robot and an aerial tension control system. The aerial tension control system provides the appropriate tension to the tethered cable, which is accordingly laid down on the ground as the RTAR roams. The STAR includes a tethered cable spooled from the ground and a ground tension control system, which enables the STAR to reach high altitudes. Prototypes of the RTAR and STAR were designed and successfully demonstrated in outdoor environments, where the load power, power type, operating frequency, and flight attitude of the RTAR and STAR were: 180 W, AC 100 kHz, and 20 m; and 300 W, AC or DC 100 kHz, and 80 m, respectively.

22.9 kV 초전도케이블 시스템의 Thermal Cycle Test 영향 (Influence of Thermal Cycle Test of a 22.9 kV High Temperature Superconducting Cable System)

  • 손송호;임지현;양형석;류희석;최하옥;성태현;김동락;황시돌
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2007년도 추계학술대회 논문집
    • /
    • pp.242-242
    • /
    • 2007
  • To verify the applicability of High Temperature Superconducting (HTS) cable system into the real grid, the HTS cable system with the specification of 22.9 kV, 1250 A, 100 m long was installed in the second quarter of 2006, and the long term field test has been in progress at the KEPCO's Gochang power testing yard. Apart from the conventional power cable, HTS cable system requires sufficient thermo-mechanical strength to endure a large temperature difference. To date, the KEPCO HTS cable system was cooled down and warmed to the room temperature several times to investigate the influence of thermal cycles experimentally. Dielectric properties, critical current dependance and heat losses were evaluated at each step of thermal cycle. The test results showed that thermal cycle did not induce the degradation of dielectric properties, and the critical current decreased to 5 % of the initial value.

  • PDF

소음 및 진동을 고려한 도심지 내 대단면 수직구 발파설계 사례 -싱가포르 Transmission Cable Tunnel EW2 공구- (Blasting Design for Large Shaft in Urban Area Considering Noise and Vibration -Singapore Transmission Cable Tunnel EW2-)

  • 김지연;이효;김도훈;고태영;이승철
    • 화약ㆍ발파
    • /
    • 제31권1호
    • /
    • pp.55-63
    • /
    • 2013
  • 싱가포르 전력구 터널 건설공사는 싱가포르 내의 전력수요 증가에 대응하기 위해 지하에 400kV의 고압 전기 케이블 등 송전설비 설치를 위한 터널을 건설하는 공사이다. 본 전력구는 총연장 35km의 터널로서 18.5km의 North-South Line의 3개 공구 (NS1, NS2, NS3)와 16.5km의 East-West Line의 3개 공구 (EW1, EW2, EW3)로 나누어 건설된다. 총 6개의 공구 중 SK건설은 EW2 공구와 NS2 공구를 수주하여 현재 시공중이다. 본 프로젝트의 과업 중 지상과 고압 송전 케이블 터널을 연결하는 수직구가 공구당 3~4개소가 있으며, 시공 중에는 TBM 발진용으로 활용된다. 지하 전력구는 싱가포르 내 도심 한복판을 가로질러 건설되며, 수직구 또한 대부분 도심지 내에 있어 수직구 굴착 시 발파 효율의 극대화와 동시에 싱가포르 소음 및 진동 기준을 만족하는 최적의 발파 설계가 요구된다. 싱가포르 전력구 터널 EW2 공구의 수직구 발파는 현지 허용 진동속도기준을 준수하고 국내의 우수한 발파 설계기술을 적용하여 설계되었으며 본 설계를 통하여 국내의 우수한 발파 설계 및 시공 기술을 전파할 좋은 기회가 될 것으로 기대된다.

케이블 지지 교량을 예제로 한 고속철도 및 일반철도의 설계 차이점 분석 (The Design Comparison of High-Speed & Common Railway Bridge with the Example of a Cable Supported Bridge)

  • 김성일;변형균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.649-655
    • /
    • 2009
  • Traffic safety and vibration serviceability of a railway bridge set a limitation to the application of long-span cable supported bridges even though the design trend of the bridge becomes longer and lighter. In the case of high speed railway, it becomes more severe for the high speed of the train and resonance of the structure. Therefore, the cable supported bridge does not exist in Korea high speed railway until now. On the other hand, in recent, Italia, Japan and China do design and construct the long-span cable supported bridges for high speed railway recently with overcoming of traffic safety and passenger comforts. In the present study, prior to analysis of traffic safety and passenger comforts, a extradosed bridge for common railway is re-designed for high speed railway. The difference of member forces and displacements by design live load, the difference of impact coefficient and variable stresses of cables are investigated.

  • PDF

Three-dimensional finite element modeling of a long-span cable-stayed bridge for local stress analysis

  • Lertsima, Chartree;Chaisomphob, Taweep;Yamaguchi, Eiki
    • Structural Engineering and Mechanics
    • /
    • 제18권1호
    • /
    • pp.113-124
    • /
    • 2004
  • The information on local stress acting in a bridge is required in many occasions such as fatigue assessment. The analysis by beam elements cannot yield this class of information adequately, while the finite element modeling of an entire long-span bridge by shell elements is impractical. In the present study, the hybrid modeling is tried out: only part of a bridge in which the point of interest is located is discretized by shell elements and the remaining part is modeled by beam elements. By solving a simple box girder problem, the effectiveness of this approach is discussed. This technique is then applied to the Rama IX Bridge for local stress evaluation. The numerical results compare very well with the results of a full-scale static loading test. The present research thus offers a practical yet accurate technique for the stress analysis of a long-span cable-stayed bridge.

Recent topics on bridge aerodynamics

  • Matsumoto, Masaru;Shirato, Hiromichi;Yagi, Tomomi
    • Wind and Structures
    • /
    • 제3권4호
    • /
    • pp.267-277
    • /
    • 2000
  • This paper aims to describe the aerodynamic vibrations of various structural elements of bridges, which are particular issues at present. The aerodynamic countermeasures for those vibrations are also discussed considering the generation mechanisms of the aerodynamic instabilities. In this paper, an example of vortex-induced oscillation of bridge deck and its lesson are discussed. Next, the wind-induced cable vibration and its aerodynamic countermeasures are reviewed. Then, the aerodynamic characteristics on two edge girders and their feasibility for application to long span cable-stayed bridges are considered. Furthermore, the bridge decks for future long span bridges are proposed and their aerodynamic characteristics are also discussed.