• Title/Summary/Keyword: Long cable

Search Result 497, Processing Time 0.027 seconds

Type-tested of Accessories for 345kV Oil Filled Cable (345kV OF 케이블용 부속재의 인정시험완료)

  • Lee, S.K.;Choi, S.G.;Kim, K.S.;Lee, K.H.;Jeon, S.I.;Huh, G.D.;Park, W.K.;Choi, M.K.;Lee, S.H.;Kim, S.J.
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.261-264
    • /
    • 1997
  • Joints and terminations for 345kV Oil Filled $1C{\times}2000mm^2$ cable have been developed and tested including BPT (Bellows Pressure Tank) on the bases of various ultra-high voltage technologies. Electrical design was performed by using Finite Element Method. The type test certified by KEPCO (Korea Electric Power Corporation) has been performed as the final stage of development. In order to confirm the reliability of long-term life for 30 years, load cycle test was conducted for 30 days with good result. As the result, the techniques we obtained from this development are applicable to higher voltage level systems (i.e. 765 kV).

  • PDF

Optimization of cables size and prestressing force for a single pylon cable-stayed bridge with Jaya algorithm

  • ATMACA, Barbaros;DEDE, Tayfun;GRZYWINSKI, Maksym
    • Steel and Composite Structures
    • /
    • v.34 no.6
    • /
    • pp.853-862
    • /
    • 2020
  • In recent years, due to the many advantages cable-stayed bridges have often constructed in medium and long span. These advantages can be listed as an aesthetically pleasing appearance, economic and easy construction, etc. The main structural elements of cable-stayed bridges are listed as deck, pylon, cables and foundation. Perhaps one of the most vital and expensive of these structural elements is stay-cables. Stay-cables ensure the allowable displacement and distribution of bending moments along the bridge deck with prestressing force. Therefore the optimum design of the stay-cables and prestressing force are very important in achieving the performance expected from the cable-stayed bridges. This paper aims to obtain the stay-cables size and prestressing force optimization of the cable-stayed bridge. For this purpose, single pylon and fan type cable configuration Manavgat Cable-Stayed Bridge was selected as an example. The three dimensional (3D) finite element model (FEM) of the bridge was created with SAP2000. Analysis of the 3D FEM of the bridge was conducted under the different combined effects of the self-weight of the structural element, prestressing force of stay-cable and live load. Stay-cable stress and deck displacement were taken into account as constraints for the optimization problem. To optimize this existing bridge a metaheuristic algorithm named Jaya was used in the optimization process. 3D FEM of the selected bridge was repeatedly analyzed by using Open Applicable Programming Interface (OAPI) properties of SAP2000. To carry out the optimization process the developed program which integrates the Jaya algorithm and the required codes for calling SAP2000 is coded in MATLAB. At the end of the study, the total weight of the stay-cables was reduced more than 40% according to existing stay cables under loads taken into account.

A Study for Durability Test of Dynamic Power Cable under Marine Operating Environment Condition (동적 파워 케이블의 해양운용환경 내구성 검증시험에 관한 연구)

  • Shim, Chunsik;Kim, Chulmin;Rho, Yuho;Lee, Jaebok;Chae, Kwangsu;Song, Hacheol;Kim, Hokyeong;Bae, Chulmin;Wi, Sungkuk;Im, Kichen
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.58 no.1
    • /
    • pp.49-57
    • /
    • 2021
  • In the production power transmitting of a floating production system like a wind offshore floating, the power cable should be connected from the surface system into the subsea system. The connection between the surface and the subsea system will make the power cable get a dynamic load like current and wave forces. Based on this condition, a dynamic power cable is required to endure external physical force and vibration in the long-term condition. It needs more requirements than static power cable for mechanical fatigue properties to prevent failures during operations in marine environments where the external and internal loads work continuously. As a process to verify, the durability test of dynamic power cables under the marine operation environment condition was carried out by using domestic technology development.

Influence of Endurance tests on Space Charge Distribution of 160kV HVDC XLPE Cable

  • Liu, Yun-Peng;Liu, He-Chen
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.302-309
    • /
    • 2017
  • The ageing of XLPE cable insulation will lead to the accelerating accumulation of space charge, which will greatly affect the safe operation of the HVDC cable. In order to investigate the influence of different ageing modes on the space charge distribution of the HVDC cable, thermal stressed, electrical stressed and electro-thermal stressed endurance tests were carried out on the XLPE peelings. The tested XLPE peelings were obtained from 160kV HVDC cable insulation. The endurance tests were carried at thermal stress of 363K, electrical stress of 20kV/mm DC and a combination of both. The Pulsed Electro-Acoustic (PEA) method was used to measure the space charge distribution of the samples. The influences of ageing on the trap energy distribution were analyzed based on the isothermal relaxation theory and the decay characteristics of the space charge. The results showed that thermal ageing would help to improve the crystalline morphologies of the XLPE at the early stage. The total amount of space charge decreased compared to the ones before thermal ageing. The long term of electrical stress would result in the cleavage of polymer molecule chains which would intensify the accumulation of space charge and increase the density and depth of electron traps. With a combination of electrical and thermal stress, the injection and migration of space charge were more significant. Besides, the depth and density of electron traps increased rapidly with the increase of endurance time.

Reliability Assesment Test on the Regular Maintenance of HTS Cable System (초전도케이블시스템 유지.보수에 따른 신뢰성 평가 시험)

  • Sohn, Song-Ho;Yang, Hyung-Suk;Lim, Ji-Hyun;Choi, Ha-Ok;Kim, Dong-Lak;Ryoo, Hee-Suk;Hwang, Si-Dole
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.06a
    • /
    • pp.361-361
    • /
    • 2009
  • KEPCO High Temperature Superconducting (HTS) cable system rated with $3\Phi$, 22.9kV, 1250A was laid in 2006, and the long term test is in progress. The HTS cable system with the cooling system has been operated below cryogenic temperature. That environment exposes the system to the thermo-mechanical stress due to the significant temperature difference, and the cooling system has moving parts for the forced circulation of the coolant. Therefore the HTS cable system experiences thermal fatigue and moving part such as liquid nitrogen pump need a regular replacement every 5000 hours Building the assessment criterion, the maintenance procedure was established and regular preventive maintenance was done; improvement of the termination structure and the replacement of the bearing of liquid nitrogen pump. Following the proper process, the reliability assessment test including He leakage detection and the stability of flow rate was performed. This paper describes the process and result of the first regular maintenance of KEPCO HTS cable system

  • PDF

Development of the Bus Duct Installation System for Wind Tower (풍력타워용 부스덕트 포설시스템 개발)

  • Rhee, Huinam;Lee, Joon Keun;Kim, Bong-Seok;Park, Seong-Hee
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.24 no.3
    • /
    • pp.219-226
    • /
    • 2014
  • A bus duct system for wind tower is introduced. A marine cable has been widely used in wind tower or various offshore structures. However, as the electric load capacity is increases, large number of cable lines must be used to cover the huge amount of electric capacities. Therefore, the installation of the cable lines becomes very difficult due to the heavy weight and volume of the cables. On the other hand, by using a single bus duct system line, the power capacity amount of 16 cables can be delivered with significantly compacted form. However, unlike flexible cables, the bus duct is relatively stiff which could generate the resonance phenomenon in the operating condition of the wind tower. In this study, the vibration characteristics of the bus duct are investigated and its long-term reliability during the life time of the wind tower is verified.

Investigation of Design and Technical Specifications on Cable Supported Bridges for Next-Generation High-Speed Railways (차세대 고속철도 특수교량의 설계 및 기술사양 조사)

  • Park, Man-Ho;Mun, Je-U;Kim, Sung-Il;Hong, Seong-Mo;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.206-213
    • /
    • 2008
  • Mo-Am arch bridge is only the long-span bridge (with 125m span) in the Kyong-Bu high-speed line in service, while other bridges are PSC box girder bridges and steel composite bridges with span lengths of $25\sim50m$. However, in foreign high-speed lines, special cable-supported bridges like cable-stayed bridges and extradosed bridges are being adopted in earnest with technical specifications. The cable supported bridge is recognized as one of the indices of technology in civil engineering field, and thus it is being adpoted with a sense of rivalry in countries with advanced technology in railway engineering. In this paper, to apply the top-level cable-supported bridge technology to the domestic high-speed line up to 400km/h by establishing the technical specifications on cable-supported bridges including span length, the requirements for securing the dynamic stability and running safety of high speed train are analyzed through case studies for domestic and foreign cases.

  • PDF

Comparison of Statistical Models for Analysis of Fatigue Life of Cable (케이블 피로 수명 해석 통계 모델 비교)

  • Suh, Jeong-In;Yoo, Sung-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.129-137
    • /
    • 2003
  • The cable in the cable-supported structures is long, therefore it can be reasonable to apply the different models, compared with those used for general steel elements. This paper compares the statistical models with existing cable fatigue data, after deriving the cdf(cumulative distibution function) with modifying the log-normal distribution, the existing extremal distributions so as to include length effect. The paper presents the appropriate model for analyzing and assessing the fatigue behavior of cable which is being used for actual structures.

Behavior of cable-stayed bridges built over faults

  • Raftoyiannis, I.G.;Michaltsos, G.T.;Konstantakopoulos, T.G.
    • Interaction and multiscale mechanics
    • /
    • v.5 no.3
    • /
    • pp.187-210
    • /
    • 2012
  • Cable-stayed bridges are commonly used in modern bridge engineering for covering long spans. In some special cases, the designer is obliged to build such a bridge over an existing fault. Activation of this fault is possible to bring about a relative displacement or separation movement between two neighboring pylons of the bridge built on opposite sides of the fault. In this work, the effect of such a fault-induced pylon displacement on bridge's deformations and on cables' strength is thoroughly studied for several types of cable-stayed bridges and useful conclusions are drawn aiming the design. The influence of a possible earthquake and traffic loads crossing the bridge when the pylons are moving away from each other is not examined.

Nonlinear aerostatic stability analysis of Hutong cable-stayed rail-cum-road bridge

  • Xu, Man;Guo, Weiwei;Xia, He;Li, Kebing
    • Wind and Structures
    • /
    • v.23 no.6
    • /
    • pp.485-503
    • /
    • 2016
  • To investigate the nonlinear aerostatic stability of the Hutong cable-stayed rail-cum-road bridge with ultra-kilometer main span, a FEM bridge model is established. The tri-component wind loads and geometric nonlinearity are taken into consideration and discussed for the influence of nonlinear parameters and factors on bridge resistant capacity of aerostatic instability. The results show that the effect of initial wind attack-angle is significant for the aerostatic stability analysis of the bridge. The geometric nonlinearities of the bridge are of considerable importance in the analysis, especially the effect of cable sag. The instable mechanism of the Hutong Bridge with a steel truss girder is the spatial combination of vertical bending and torsion with large lateral bending displacement. The design wind velocity is much lower than the static instability wind velocity, and the structural aerostatic resistance capacity can meet the requirement.