• Title/Summary/Keyword: Long bridge

Search Result 1,063, Processing Time 0.03 seconds

Application of Vision-based Measurement System for Estimation of Dynamic Characteristics on Hanger Cables (행어케이블의 동특성 추정을 위한 영상계측시스템 적용)

  • Kim, Sung-Wan;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.1A
    • /
    • pp.1-10
    • /
    • 2012
  • Along with the development of coasts, islands and mountains, the demand of long-span bridges increases which, in turn, brings forth the construction of cable-supported bridges like suspension and cable-stayed bridges. There are various types of statically indeterminate structures widely applied that supported the main girder with stay cables, main cables, hanger cables with aesthetic structural appearance. As to the cable-supported bridges, the health monitoring of a bridge can be identified by measuring tension force on cable repeatedly. The tension force on cable is measured either by direct measurement of stress of cable using load cell or hydraulic jack, or by vibration method estimating tension force using cable shape and measured dynamic characteristics. In this study, a method to estimate dynamic characteristics of hanger cables by using a digital image processing is suggested. Digital images are acquired by a portable digital camcorder, which is the sensor to remotely measure dynamic responses considering convenient and economical aspects for use. A digital image correlation(DIC) technique is applied for digital image processing, and an image transform function(ITF) to correct the geometric distortion induced from the deformed images is used to estimate subpixel. And, the correction of motion of vision-based measurement system using a fixed object in an image without installing additional sensor can be enhanced the resolution of dynamic responses and modal frequencies of hanger cables.

Seismic Behavior of Bridges Considering Ground Motion Spatial Variation (공간적으로 변화하는 입력지진으로 인한 교량의 지진거동특성)

  • Bae, Byung Ho;Choi, Kwang Kyu;Kang, Seung Woo;Song, Si Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.759-768
    • /
    • 2015
  • The ground motions of large dimensional structures such as long span bridges at different stations during an earthquake, are inevitably different, which is known as the ground motion spatial variation effect. There are many causes that may result in the spatial variability in seismic ground motion, e.g., the wave passage effect due to the different arrival times of waves at different locations; the loss of coherency due to seismic waves scattering in the heterogeneous medium of the ground; the site amplification effect owing to different local soil properties. In previous researches, the site amplification effects have not been considered or considered by a single-layered soil model only. In this study, however, the ground motion amplification and filtering effects are evaluated by multi-layered soil model. Spatially varying ground motion at the sites with different number of layers, depths, and soil characteristics are generated and the variation characteristics of ground motion time histories according to the correlation of coherency loss function and soil conditions are evaluated. For the bridge system composed of two unit bridges, seismic behavior characteristics are analyzed using the generated seismic waves as input ground motion. Especially, relative displacement due to coherency loss and site effect which can cause the unseating and pounding between girders are evaluated. As a result, considering the soil conditions of each site are always important and should not be neglected for an accurate structural response analysis.

Monitoring System of Rock Mass Displacement and Temperature Variation for KURT using Optical Sensor Cable (광섬유센서케이블을 이용한 지하연구시설의 지반변위 및 온도변화 감시시스템 구축)

  • Kim, Kyung-Su;Bae, Dae-Seok;Koh, Yong-Kwon;Kim, Jung-Yul
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.63-70
    • /
    • 2009
  • The optical fiber cable acting as a sensor was embedded in the underground research tunnel and portal area in order to monitor their stability and the spatial temperature variation. This system includes two types of sensing function to monitor the distributed strain and temperature along the line, where sensor cable is installed, not a point sensing. According to the results of one year monitoring around the KURT, there is no significant displacement or movement at the tunnel wall and portal slope. However, it would be able to aware of some phenomena as an advance notice at the tunnel wall which indicates the fracturing in rockmass and shotcrete fragmentation before rock falls accidently as well as movement of earth slope. The measurement resolution for rock mass displacement is 1 mm per 1 m and it covers 30 km length with every 1m interval in minimum. In temperature, the cable measures the range of $-160{\sim}600^{\circ}C$ with $0.01^{\circ}C$ resolution according to the cable types. This means that it would be applicable to monitoring system for the safe operation of various kinds of facilities having static and/or dynamic characteristics, such as chemical plant, pipeline, rail, huge building, long and slim structures, bridge, subway and marine vessel. etc.

A Study on the Applicability of GSTAR-1D to the Riverbed-Level Variation in the Geum River (GSTAR-1D 모형의 금강 하상변동예측 적용성에 관한 연구)

  • Chung, Sung-Young;Park, Bong-Jin;Jung, Kwan-Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1611-1615
    • /
    • 2006
  • The purpose of this study is to simulate the riverbed profile changes downstream of Daecheong re-regulation dam from 1988 to 2001, to evaluate the model's applicability and to predict a long-term riverbed-level variation between 2002 and 2017. As a result of simulation 14 sediment transport equations provided by GSTAR-1D, it was found that Acker's & White formula was the most stable relatively. The interval used to calculate its stability was 7 days for bankful discharge$(1,000m^2/s)$, 3 days for daily maximum flow$(4,273m^2/s)$, 1 day for hourly maximum flow$(7,605m^2/s)$ and minimum flow$(8.5m^2/s)$. The simulation results of river bed changes were evaluated and compared to its measure data from 1988 to 2001. It was showed that there was the degradation for a section between Daecheong re-regulation dam and Maepo water stage gage station due to bed-material, and the degradation for a reach between Maepo and Gongju water stage gage station due to massive aggregate collection. Also, as a result of simulating the river profile change for 2002 to 2017, it was predicted that the section between Daecheong re-regulation dam and Geumnam Bridge would remain as the present profile and the reach between Maepo and Gongju water stage gage station would have some degradations in several parts, which would be stable as a whole unless it was due to artificial river profile change.

  • PDF

Durability of Latex-Modified Concrete with Rapid-Setting Cement (초속경시멘트를 이용한 라텍스개질 콘크리트의 내구특성)

  • Yun, Kyong-Ku;Jung, Won-Kyong;Choi, Sang-Reung;Kim, Dong-Ho;Lee, Bong-Hak
    • International Journal of Highway Engineering
    • /
    • v.4 no.2 s.12
    • /
    • pp.1-8
    • /
    • 2002
  • Latex modified concrete(LMC) became to be applied as a new material for newly constructed bridge deck overlays in Korea due to its excellent bond strength, flexural strength and impermeability against water and chloride. However, it could not be adopted at repair job site because of its long curing time required. Thus, a research on latex modified concrete with rapid-setting cement(RSLMC) is necessary if it could develope the sufficient strength for early opening to traffic. This study focused on the durability of latex modified concrete with rapid-setting cement mainly on water permeable resistance and freeze-thaw resistance. The main experimental variables were latex contents(0, 5, 10, 15 and 20%) and antifoamer contents (0, 1.6, 3.2, 4.8 and 6.4%). Test results show that the permeability of RSLMC is very low indicating below 100 coulombs at 15% of latex contents at all antifoamer contents. The freeze-thaw resistance of RSLMC maintains above 90% of relative dynamic modulus at 3.2% of antifoamer content until 300 freezing-thawing cycles.

  • PDF

Evaluation of Static and Fatigue Performances of Decks Reinforced with GFRP Rebar for Reinfocement Ratio (GFRP 보강근으로 보강된 바닥판의 보강비에 따른 정적 및 피로성능 평가)

  • You, Young-Jun;Park, Young-Hwan;Choi, Ji-Hun;Kim, Jang-Ho Jay
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.4
    • /
    • pp.491-497
    • /
    • 2014
  • The corrosion of steel reinforcement in reinforced concrete bridge decks significantly affects the degradation of the capacity. Due to the advantageous characteristics such as high tensile strength and non-corrosive property, fiber reinforced polymer (FRP) has been gathering much interest from designers and engineers for possible usage as a alternative reinforcement for a steel reinforcing bar. However, its application has not been widespread, because there data for short- and long-term performance data of FRP reinforced concrete members are insufficient. In this paper, seven full-scale decks with dimensions of $4000{\times}3000{\times}240mm$ were prepared and tested to failure in the laboratory. The test parameter was the bottom reinforcement ratio in transverse direction. The decks were subjected to various levels of concentrated cyclic load with a contact area of $577{\times}231mm$ to simulate the vehicle loading of DB-24 truck wheel loads acting on the center span of the deck. It was observed that the glass FRP (GFRP) reinforced deck on a restraint girder is strongly effected to the level of the applied load rather than the bottom reinforcement ratio. The study results showed that the maximum load less than 58% of the maximum static load can be applied to the deck to resist a fatigue load of 2 million cycles. The fatigue life of the GFRP decks from this study showed the lower and higher fatigue performance than that of ordinary steel and CFRP rebar reinforced concrete deck. respectively.

Eco-corridor Positioning for Target Species - By Field Surveying of Mammals' Road-Kill - (목표종 생태통로의 위치선정 -포유류 Road-kill 현장조사를 중심으로-)

  • Lee, Yong-Wook;Lee, Myeong-Woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.3
    • /
    • pp.51-58
    • /
    • 2006
  • The purpose of this research presents a method to position and makes the structure for eco-corridors reasonably with collectable analysing results of various effects shown in mammals' road-kill at 429 points. Target animals of this research are Leopard cat, Siberian weasel, Raccoon dog, Korean hare, Eurasian red squirrel, Siberian chipmunk and Water deer. The results derived from the empirical analysis on the contents above are followed. First, according to the results as for Leopard cat road kill analysis, which is designated as Endangered Species Class II, the eco-corridor might be located at near village having stead food in order to decrease the frequencies of road-kill, because its road kill points were mainly collected at 4 lane hilly road with mountain-road-farm area geological type of. Second, because Siberian weasel's road kill was detected at 2 lane hilly road with mountain-road-stream geological type, the eco-corridor might be located at near a mill to decrease road-kill frequencies. Third, the road-kill frequency of Eurasian red squirrel can be reduced when the eco-corridor is located at the area across coniferous tree near 4 lane west sea freeway with mountain-road-mountain. Fourth, the road-kill of Raccoon dog can be reduced when the eco-corridor is located at 4 lane mountain road or hilly road with the geological type having farm land-road-mountain(stream). Fifth, Korean hare's road-kill can be reduced when the eco-corridor is located at grass land across ridge line of mountain, because wild rabbit road kill was happened at 4 lane mountain road or 2 lane mountain road(mountain-road-mountain). Sixth, As for Siberian chipmunk, the eco-corridor might be located at the side slope of mountain road at 2 lane mountain road under the speed of 60km/h with mountain-road-mountain. Seventh, For Water deer, the eco-corridor might be located at 4 lane hilly road with mountain-road-farm land. As for Common otter, Amur hedgehog, Yellow-throated marten, Weasel, it is difficult to specify the proper site of eco-corridor due to the lack of data. Eco-corridors for carnivores might be well located at 4 lane hilly road or 2 lane hilly road with mountain-road-farm land, and the track for herbivores might be well located as a overhead bridge on mountain-road-mountain type across mountains. In order to position eco-corridors for wildlife properly, we have to research animal's behavior with ecological background, and to consider the local uniqueness and regularly collect the empirical road-kill data in long term 3 to 5 year, which can be the foundation for the more suitable place of wild life eco-corridors.

Tunnelling in Bangkok - Two Case Studies (방콕의 터널공사 - 두 개의 사례연구)

  • Teparaksa, Wanchai;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.153-163
    • /
    • 2005
  • This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.

  • PDF

Integrated Approaches to Berth Productivity Improvements in Port Development and Operation and Logistics : A Conceptual Perspective (항만개발.운영과 로지스틱스에 있어서 부두생산성 향상에 대한 종합적 접근법 : 개념적 관점)

    • Journal of Korean Port Research
    • /
    • v.11 no.1
    • /
    • pp.85-99
    • /
    • 1997
  • The improvements of berth productivity is closely related to berth/port systems and its relationship extends to the overall pattern of port development/logistics, transport and trade. Since ports in general and berths in specific function as a bridge transferring seaborne cargoes from seaside to landside and vice versa, berth productivity improvements should be considered in terms of the total system in which the cargoes are transported from origin to destination via berths/ports. In that respect, the objective of this study is to improve berth productivity which is a vital factor in the strategic planning in port development and operation and logistics. According to a literature survey on the subject, the contents of the studies have been limited to either a macro-perspective or a micro-perspective which is only a partial solution to the problem. Hence, this limitation requires an integrated approach to find and ultimate solution, which should be considered not separately, but as a whole. The contents and scope of this study cover the improvements of berth productivity in conjunction with strategic planning in port development. efficient operation and logistics from two different viewpoints, macro- and micro-perspective. After that, a combination of these two perspectives is applied to the integrated approach due to lacking a comprehensive perspective from either macro-approach or micro-approach. In reality, a port itself is a complex and dynamic organization. Therefore, a comprehensive insight needs an integrated approach for the long-term national economic development. In this approach, the utmost importance is how to find the bottlenecks and to solve the problems effectively from the beginning stage in port development. In conclusion, derived from the macro- and micro-perspective. the attempt to establish an integrated approach is the merit of this study, which is required as a comprehensive measure since none of the two can be a solution independently. In terms of reinforcing this study, it needs further empirical research due to the restriction of the theoretical method of this paper. Consequently, the reinforced research will be able to enhance the integrated approach on the basis of the conceptual perspective.

  • PDF

A clinical study on the alveolar crest height after secondary alveolar bone graft in the cleft alveolus patients : Preliminary Study (치조 파열 환자에 있어서 이차성 골이식술 후의 치조정 높이 변화에 관한 임상적 연구 : 예비적 연구)

  • Choi, Jin-Young;Kim, Myung-Jin;Kim, Su-Gon;Eune, Jung-Ju;Choung, Pill-Hoon
    • Korean Journal of Cleft Lip And Palate
    • /
    • v.3 no.1
    • /
    • pp.1-9
    • /
    • 2000
  • 목적 : 치조파열 환자에 있어서 이차 치조골 이식술을 시행한 후 그 결과를 알아보고자 방사선학적 분석을 통하여 평가하였다. 본 연구의 목적은 수술전 골결손부 인접치아의 치조정 높이와 수술후 골결손부 인접치아의 치조정 높이를 근심측과 원심측에서 각각 측정함으로써 치조정의 높이가 과연 통계적으로 유의성 있게 증가하는지와 치조골 이식술의 성공률이 치조열의 너비와 상관관계가 있는지의 여부를 알아보는 것이다. 환자 및 방법 : 1991년부터 1999년까지 서울대학교병원 구강악안면외과에서 자가장골 채취 후 분쇄피질망사골 형태 또는 block 피질망상골 형태로 이식한 편측성 치조열을 가진 환자 중 최소한 6개월이 경과한 환자 56명을 연구대상으로 하였고 두 술자에 의해 시술되었다. 수술전 골결손부 인접치아의 치조정의 높이와 치조열의 너비 및 수술후 이식한 골의 높이와 절흔의 양은 치과용 파노라마 방사선 사진을 이용하여 측정하였고, 치조열의 너비는 모델이나 환자의 골결손부 근심치아의 근원심 폭경을 이용하여 환산하였다. 그리고 이식한 골의 높이와 절흔의 양을 1995년 Long이 제시한 방법으로 측정하여 술전의 측정치와 비교하였다. 결과 : 치조열의 너비는 평균 6.9mm(1.9mm-12.1mm) 였다. 근심에서의 치아는 골이식 당시 중절치가 52개(92.9%), 측절치가 4개(7.1%)였고, 49명의 환자에서 완전맹출을, 6명의 환자에서 부분맹출(측절치 2개, 중절치 4개)을 보였다. 원심측에서의 치아는 골이식 당시 측절치가 25개(44.6%), 견치가 29개(51.8%), 소구치가 2개(3.6%)였고, 완전 맹출이 32.1%, 부분 맹출이 57.2%, 미맹출이 10.7%로서 완전히 맹출하기 전에 골이식한 경우가 67.9%였다. 모든 환자에 있어서 bony bridge가 나타났고, 절흔이 인접치 아래로 연장되지 않았으며, 치조골 이식술 후 oronasal fistula를 보인 환자는 한 명도 없었으므로 성공률은 100%였다. 술후 근심측에서의 치조정의 높이는 근심측 치아 치근길이의 79%(평균), 원심측에서의 치조정의 높이는 원심측 치아 치근길이의 87%(평균)로서 통계적으로 유의성 있게 증가하였다. 결론: 이차 치조골 이식술을 시행한 후 치조정의 높이는 골결손부 근심측과 원심측에서 모두 유의성있게 증가하였고, 근심측에서보다 원심측에서 통계학적으로 더 유의성 있게 증가하였다. 치조열의 너비와 절흔의 양, 치조정의 높이 및 치조골이식 성공률과는 유의성 있는 관련성이 없었다.

  • PDF