• Title/Summary/Keyword: Long Rail

Search Result 234, Processing Time 0.025 seconds

A Study on the management of state-run railroads (국유철도 재산관리 기반체계 구축방안 연구)

  • Kang, Yu--Shin;Choo, Jun-Sup;Kim, Jong-Tae
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2250-2257
    • /
    • 2008
  • This study examined the existing issues and current status of how to best approach the establishment of railroad asset of the corporation in the long run. It also explored some preventative measures for further problems. Based on the law of state property and related railroad statutes, the research referred to basic plans for railroad management of Korea Rail Network Authority, the outcome of file research, handbook of asset management, guidelines and policy of Ministry of Finance and Economy for state property management, recommendations of the Board of Audit and Inspection and fact-finding research of state property (miscellaneous properties). The findings are making a few suggestions on the service of the Korea Rail Network Authority and Korail.

  • PDF

Analysis of CWR track on the High-Speed Railway Bridges considering the Expansion Length of Bridge Deck (고속철도교량의 온도신축길이 변화를 고려한 교량상 장대레일의 거동 해석)

  • Kang Jae-Yoon;Kim Byung-Suk;Kwark Jong-Won;Choi Eun-Suk;Chin Won-Jong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.806-811
    • /
    • 2004
  • Currently, in the design criteria for the high speed railway bridges, the maximum distance between bridge expansion joint is limited to 80m using a continuous welded mil, in order to limit the additional stress in the rail due to the rail-bridge interaction. In the past study on the resonance effect of HSR train, it is known that the reduction of resonance and dynamic responses of bridge deck occurs at the specific expansion length of 28.05m and 46.75m. In this study, the stability of track structure on the HSR bridges with expansion length of 90m has checked by finite element method. And the track behavior including mil stresses and relative displacements are compared to the current state of track structures on the bridge system with 80m long expansion length.

  • PDF

Gantry Robot with Extended Workspace for Pavement Sign Painting Operations

  • Hong Daehie;Lee Woo-Chang;Chu Baeksuk;Kim Tae-Hyung;Choi Woo Chun
    • Journal of Mechanical Science and Technology
    • /
    • v.19 no.6
    • /
    • pp.1268-1279
    • /
    • 2005
  • The current method for pavement sign marking operations is labor-intensive and very dangerous due to the exposure of workers to passing traffic. It also requires blocking traffic for a long period of time resulting serious traffic jam. This paper deals with the development of a robotic system for automating the pavement sign painting operations. The robotic system consists of gantry frame equipped with transverse drive rail and automatic paint spray system. The workspace of the gantry robot is extended to one-lane width with the transverse rail system. This research also includes the development of font data structures that contain the shape information of pavement signs, such as Korean letters, English letters and symbols. The robot path is generated with this font data through the procedures of scaling up/down and partitioning the signs to be painted depending on the workspace size.

Implementation and Verification of Artificial Intelligence Drone Delivery System (인공지능 드론 배송 시스템의 구현 및 검증)

  • Sungnam Lee
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.19 no.1
    • /
    • pp.33-38
    • /
    • 2024
  • In this paper, we propose the implementation of a drone delivery system using artificial intelligence in a situation where the use of drones is rapidly increasing and human errors are occurring. This system requires the implementation of an accurate control algorithm, assuming that last-mile delivery is delivered to the apartment veranda. To recognize the delivery location, a recognition system using the YOLO algorithm was implemented, and a delivery system was installed on the drone to measure the distance to the object and increase the delivery distance to ensure stable delivery even at long distances. As a result of the experiment, it was confirmed that the recognition system recognized the marker with a match rate of more than 60% at a distance of less than 10m while the drone hovered stably. In addition, the drone carrying a 500g package was able to withstand the torque applied as the rail lengthened, extending to 1.5m and then stably placing the package down on the veranda at the end of the rail.

A Process Detection Circuit using Self-biased Super MOS composit Circuit (자기-바이어스 슈퍼 MOS 복합회로를 이용한 공정 검출회로)

  • Suh Benjamin;Cho Hyun-Mook
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.7 no.2
    • /
    • pp.81-86
    • /
    • 2006
  • In this paper, a new process detection circuit is proposed. The proposed process detection circuit compares a long channel MOS transistor (L > 0.4um) to a short channel MOS transistor which uses lowest feature size of the process. The circuit generates the differential current proportional to the deviation of carrier mobilities according to the process variation. This method keep the two transistor's drain voltage same by implementing the feedback using a high gain OPAMP. This paper also shows the new design of the simple high gam self-biased rail-to-rail OPAMP using a proposed self-biased super MOS composite circuit. The gain of designed OPAMP is measured over 100dB with $0.2{\sim}1.6V$ wide range CMR in single stage. Finally, the proposed process detection circuit is applied to a differential VCO and the VCO showed that the proposed process detection circuit compensates the process corners successfully and ensures the wide rage operation.

  • PDF

A Study on the Systems Engineering based Verification of a Systems Engineering Application Model for a LRT Project (경량전철사업 시스템엔지니어링 전산모델 검증에 관한 연구)

  • Han, Seok-Youn;Kim, Joo-Uk;Choi, Myung-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.7
    • /
    • pp.425-433
    • /
    • 2016
  • The construction of a light rail transit (LRT) system is a large and complex infrastructure project involving hundreds of billions of won in construction costs for a single route, and it is very important to carry out such a project from a life-cycle perspective because of its long-term operation. Systems engineering is a means and methodology to successfully implement customers' needs, and it is useful in large projects such as light rail transit. An application model called Systems Engineering for Light Rail Transit (SELRT) was developed to support systems engineering activities in light rail transit projects. In order to utilize SELRT, it is necessary to ensure that system requirements are met. As such, in this paper, we present a verification procedure and architecture based on a systems engineering-based methodology, thereby identifying the system requirements and deriving the verification requirements to confirm the SELRT model for the proposed method. The results show that the traceability of the system requirements and verification requirements, the verification method for each requirement, and the demonstration results for computerized tools are mutually connected, and that the initial requirements are clearly implemented in the SELRT. The proposed method is valid for verifying the SELRT, which can also be utilized in a LRT project.

Reliability of mortar filling layer void length in in-service ballastless track-bridge system of HSR

  • Binbin He;Sheng Wen;Yulin Feng;Lizhong Jiang;Wangbao Zhou
    • Steel and Composite Structures
    • /
    • v.47 no.1
    • /
    • pp.91-102
    • /
    • 2023
  • To study the evaluation standard and control limit of mortar filling layer void length, in this paper, the train sub-model was developed by MATLAB and the track-bridge sub-model considering the mortar filling layer void was established by ANSYS. The two sub-models were assembled into a train-track-bridge coupling dynamic model through the wheel-rail contact relationship, and the validity was corroborated by the coupling dynamic model with the literature model. Considering the randomness of fastening stiffness, mortar elastic modulus, length of mortar filling layer void, and pier settlement, the test points were designed by the Box-Behnken method based on Design-Expert software. The coupled dynamic model was calculated, and the support vector regression (SVR) nonlinear mapping model of the wheel-rail system was established. The learning, prediction, and verification were carried out. Finally, the reliable probability of the amplification coefficient distribution of the response index of the train and structure in different ranges was obtained based on the SVR nonlinear mapping model and Latin hypercube sampling method. The limit of the length of the mortar filling layer void was, thus, obtained. The results show that the SVR nonlinear mapping model developed in this paper has a high fitting accuracy of 0.993, and the computational efficiency is significantly improved by 99.86%. It can be used to calculate the dynamic response of the wheel-rail system. The length of the mortar filling layer void significantly affects the wheel-rail vertical force, wheel weight load reduction ratio, rail vertical displacement, and track plate vertical displacement. The dynamic response of the track structure has a more significant effect on the limit value of the length of the mortar filling layer void than the dynamic response of the vehicle, and the rail vertical displacement is the most obvious. At 250 km/h - 350 km/h train running speed, the limit values of grade I, II, and III of the lengths of the mortar filling layer void are 3.932 m, 4.337 m, and 4.766 m, respectively. The results can provide some reference for the long-term service performance reliability of the ballastless track-bridge system of HRS.

The Situation and the Tasks of UK Rail Privatization, Focusing on after the Hatfield Accident (영국 철도 민영화의 현황 및 과제 (Hatfield사고 이후의 변화를 중심으로))

  • Lee, Yong-Sang
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.2 s.88
    • /
    • pp.91-100
    • /
    • 2006
  • This paper examines the situation and tasks of UK rail privatization, especially focusing on after the Hatfield rail accident. Earlier research which focused on the UK's Privatization had little knowledge of the explanations for recent changes. Moreover they had difficulty making a direct comparison between national rail and the privatized rail. Therefore we aye left without a good explanation which has a comprehensive perspective. I attempt to show the change in the rail privatization Process and its outcome, focusing on after the Hatfield rail accident. This Paper argues that the UK's vail privatization process has a regulatory framework which is too complicated with overlapping responsibilities that brought about inefficiency, increasing costs and a superficial safety regime. Especially the planning of rail and infrastructure maintenance did not come to play an appropriate role. However after 2000, the government took charge of setting the strategy for railways, and the Office of Rail Regulation covered safety performance and cost. explain that these changes present a good opportunity to solve the problem of passing the buck for poor performance. Through the analysis, I find that the passenger rail network is well-suited to deliver long distance business and commuters and that the subsidy from the government is decreasing. However, performance, for example punctuality and reliability. should be improved. Especially the Hatfield rail accident caused a reduction in the satisfaction of passengers. In future. the problems of rising costs and monopoly franchise system should be addressed.

대만 고속전철 교량의 레일-구조물 상호작용 평가

  • Gwon Gi-Jun;Kim Yong-Gil;Park Byeong-Gi
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2000.11a
    • /
    • pp.442-449
    • /
    • 2000
  • In railway structure, long rail causes the increase of stress. Especially, additional stress and displacement are caused by the discontinuity and variations of the stiffness of substructures in the section of bridges. In the other words, binding forces like the connection strengths and friction force between ties and ballasts play the role of resistance forces.(omitted)

  • PDF

Four-Phase Single-Rail Protocol with Return-to-Zero Data to Reduce Delay in Long Wire (도선의 전송지연을 최소화하기 위한 데이터 초기화에 기반한 단일선 4-위상 프로토콜)

  • 정은구;이동익;노명찬
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2001.10c
    • /
    • pp.1-3
    • /
    • 2001
  • VLSI칩 내부애서 길이가 긴 도선을 통해서 데이터를 보낼 메, 누화(crosstalk)의 영향으로 데이터 값에 따라 지연시간이 변한다. 그리고 지연시간의 변화폭도 CMOS공정이 초미세화됨에 따라서 더욱 커진다. 본 논문에서는 지연시간을 줄이기 위해서, 데이터 코딩을 이용하여 가장 긴 지연시간을 피하는 데이터 초기화에 기반한 단일선 4-위상 프로토롤을 제안한다. 제안된 프로토콜을 긴 도선에 적용함으로써 도선에서의 최대 지연시간을 최대 49% 감소시킨다.

  • PDF