Karira, Hemu;Kumar, Aneel;Ali, Tauha Hussain;Mangnejo, Dildar Ali;Yaun, Li
Geomechanics and Engineering
/
제31권1호
/
pp.53-69
/
2022
In densely built areas, the development of underground transportation systems often involves twin excavations, which are sometimes unavoidably constructed adjacent to existing piled foundations. Because soil stiffness degrades with induced stress release and shear strain during excavation, it is vital to investigate the piled raft responses to subsequent excavation after the first tunnel in a twin-excavation system. The effects of deep excavations on existing piled foundations have been extensively investigated, but the influence of twin excavations on a piled raft is seldom reported in the literature. In this study, three-dimensional numerical analyses were carried out to investigate the influence of sand density on an existing piled raft (with a working load on top of the raft) due to twin excavations. A wide range of relative density (Dr) from loosest (30%), loose to medium (50% and 70%), and densest (90%) were selected to investigate the effects on settlement and load transfer mechanism of the piled raft during twin excavations. An advanced hypoplastic sand model (which can capture small-strain stiffness and stress-state dependent dilatancy of sand) was adopted. The model parameters are calibrated against centrifuge test results in sand reported in the literature. From the computed results, it is found that twin excavations in loose sand (Dr=30%) caused the most significant settlement. This is because of the higher stiffness of denser sand (Dr=90%) than that of loose sand. In contrast, a much larger tilting (maximum magnitude=0.18%) was computed in dense sand than in loose sand after the completion of the first excavation. As far as the load transfer mechanism along the piles is concerned, an upward load transfer to mobilize shaft resistance is observed in loose sand. On the contrary, a downward load transfer is observed in dense sand.
power transfer breaker is a device used to transfer the load from the electricity power line to the emergency generators. In case of overload, it also functions as a circuit breaker. In this work, a new mechanism for the device is suggested. Among the various design challenges, optimization of the trigger mechanism is identified as of central importance. Optimal design decisions are made with the use of Taguchi method.
The load transfer mechanism and load-bearing capacity of cast steel joints for H-shaped beam to square tube column connection are studied based on the deformation compatibility theory. Then the monotonic tensile experiments are conducted for 12 specimens about the cast steel joints for H-shaped beam to square tube column connection. The findings are that the tensile bearing capacity of the cast steel joints for beam-column connection depends on the ring of cast steel stiffener. The tensile fracture happens at the ring of the cast steel stiffener when the joint fails. The thickness of square tube column has little influence on the bearing capacity of the joint. The square tube column buckles while the joint without concrete filled, but the strength failure happens for the joint with concrete filled column. And the length of welding connection between square tube column and cast steel stiffener has little influence on the load-bearing capacity of the cast steel joint. Finally it is shown that the load-bearing capacity of the joints for H-shaped beam to concrete filled square tube column connection is larger than that of the joints for H-shaped beam to square tube column connection by 10% to 15%.
본 연구에서는 활동성 불연속면을 포함하고 있는 모래지반에 터널을 굴착할 때에 터널 주변의 원지반에 발생되는 아칭을 규명하기 위하여 터널 상부의 토피고와 불연속면의 위치 및 각도를 변화시켜가며 모형실험을 수행하였다. 모형실험기의 중앙에 수직으로 이동이 가능한 가동판을 설치하고 모래지반 조성 후에 가동판을 강하시켜서 터널 굴착을 모형화 하였고, 토조의 바닥판에 로드셀을 부착하여, 아칭에 의한 하중전이를 측정하였다. 굴착에 의한 지표면의 침하거동은 변위측정센서를 지표면에 설치하여 측정하였으며, 실험 중에 연속사진촬영을 실시하고 지반조성시 일정한 간격으로 설치한 측점의 움직임을 관측하여 굴착에 의한 지반이완형태를 측정하였다. 본 연구 결과 터널굴착시 불연속면의 각도와 위치, 그리고 터널 상부의 토피고에 따라서 하중전이 형태와 이완영역이 변화하는 것을 확인하였으며 지반의 이완영역이 터널과 인접해 있는 불연속면을 따라 주변지반으로 점차 확대되어 가는 것을 알 수 있었다.
성토지지말뚝시스템을 적용하여 연약지반 상에 성토를 설계 시공하고자 할 경우 말뚝지지 성토지반 내에 지반아칭이 발달할 수 있도록 한계성토고를 설계하는 방법이 마련되었다. 먼저 말뚝캡보의 간격이 비교적 넓은 경우를 대상으로 일련의 모형실험을 실시하여 성토단계에 따른 성토하중의 하중전이거동을 조사하고 성토지반 속에 지반아칭이 충분히 발달되기 시작할 때의 성토고를 실험적으로 관찰하였다. 모형실험결과, 하중전이거동은 말뚝지지성토지반 내에 지반아칭이 발달될 수 있느냐 여부를 결정지을 수 있는 성토고에 영향을 많이 받음을 알 수 있었다. 저성토단계에서는 성토지반 속에 지반아칭이 아직 발달되지 못한 관계로 펀칭전단파괴모드에 의하여 성토하중이 말뚝캡보에 하중전이가 진행되었고 고성토단계에서는 지반아칭이 발달하여 지반아칭파괴모드에 의하여 하중전이가 진행되었다. 이들 저성토단계와 고성토단계에서 측정된 연직하중의 실험치는 각각의 파괴모드에 의한 하중전이 메커니즘에 근거하여 이전 연구에서 유도 제시된 이론식들로 산정된 예측치와 좋은 일치를 보였다. 또한 모형실험결과 저성토단계의 펀칭전단파괴모드에 의한 하중전이 메커니즘에서 고성토단계의 지반아칭파괴모드에 의한 하중전이 메커니즘으로 변화하는 시점의 한계성토고가 존재함을 확인 할 수 있었다. 성토지반 속에 지반아칭을 충분히 발달시키려면 성토를 이 한계성토고 보다 높게 설계 시공하여야 함을 알았다. 또한 펀칭전단과 지반아칭에 의한 하중전이 메커니즘에 의거 유도 제안되었던 전이하중 산정 이론식을 같게 놓음으로서 한계성토고를 산정할 수 있는 이론식을 유도할 수 있었고 이 이론식으로 한계성토고의 실험치를 잘 예측할 수 있었다.
Load redistribution is a critical resource in computer system. In sender-initiated load redistribution algorithms, the sender continues to send unnecessary request messages for load transfer until a receiver is found while the system load is heavy. These unnecessary request messages result in inefficient communications, low CPU utilization, and low system throughput in distributed systems. To solve these problems, we propose a genetic algorithm based approach for improved sender-initiated load redistribution in distributed systems. Compared with the conventional sender-initiated algorithms, the proposed algorithm decreases the response time and task processing time.
이 논문은 반복-수평력을 받는 프리캐스트 기둥-RC 기초 Anchor 접합부의 반복-수평력에 대한 내력 특성을 규명하기 위함이다. 본 연구는 하부 기초에 프리캐스트 콘크리트 기둥과 기초를 Anchor식으로 접합한 콘크리트 구조체가 정확한 응력전달 경로 및 파괴 메커니즘에 있어서 기존의 콘크리트-강재 연결부와 어떠한 차이가 있는지 제시한다. 반복-수평력 작용하의 철근의 인발력 실험결과는 프리캐스트 기둥-RC 기초 Anchor 시공에 필요한 철근의 최소 필요 삽입 깊이를 제시한다. 또한, 실험을 통해 제시된 응력 전달 경로 및 파괴 메커니즘을 제품별 메뉴얼에 제시되어 있는 메커니즘과 비교, 검토함으로서 접합부의 명확한 응력전달 경로 및 파괴 메커니즘을 시공자의 요구 성능에 맞게 제시한다. 그러므로 본 연구를 통해 프리캐스트 콘크리트 기둥의 정확한 주근의 개수, 공칭직경, 정착 길이 등에 대한 최적의 설계 조건을 제시함으로써, 시공 시 이들에 대한 정확한 데이터를 제공한다.
The urbanization and increasing rate of population demands effective means of transportation system (basement and tunnels) as well as high-rise building (resting on piled foundation) for accommodation. Therefore, it unavoidable to construct basements (i.e., excavation) nearby piled foundation. Since the basement excavation inevitably induces soil movement and stress changes in the ground, it may cause differential settlements to nearby piled raft foundation. To understand settlement and load transfer mechanism in the piled raft due to excavation-induced stress release, numerical parametric studies are carried out in this study. The effects of excavation depths (i.e., formation level) relative to piled raft were investigated by simulating the excavation near the pile shaft (i.e., He/Lp=0.67), next to (He/Lp=1.00) and below the pile toe (He/Lp=1.33). In addition, effects of sand density and raft fixity condition were investigated. The computed results have revealed that the induced settlement, tilting, pile lateral movement and load transfer mechanism in the piled raft depends upon the embedded depth of the diaphragm wall. Additional settlement of the piled raft due to excavation can be account for apparent loss of load carrying capacity of the piled raft (ALPC). The highest apparent loss of piled raft capacity ALPC (on the account of induced piled raft settlement) of 50% was calculated in in case of He/Lp = 1.33. Furthermore, the induced settlement decreased with increasing the relative density from 30% to 90%. On the contrary, the tilting of the raft increases in denser ground. The larger bending moment and lateral force was induced at the piled heads in fixed and pinned raft condition.
FBG Sensor, which is smaller than strain gauge and has better durability and does not have a noise from electromagnetic waves, was adapted to develope a smart anchor. A series of pullout tests were performed to verify the feasibility of smart anchor and find out the load transfer mechanism around the steel wire fixed to rock with grout. Distribution of shear stresses at steel wire-grout interface is assessed from the measured strain distribution by the optical fiber sensors and compared with stress distributions predicted by Farmer's and Aydan's formulas. It was found that present theoretical formulas may underestimate the failure depth and magnitude of shear stresses when the pullout loads increase.
Reinforced concrete deep beams have useful applications in tall buildings and foundations. Over the past two decades, numerous design models for deep beams were suggested. However even the latest design manuals still offer little insight into the design of deep beams in particular when complexities exist in the beams like web openings. A method commonly suggested for the design of deep beams with openings is the strut-and-tie model which is primarily used to represent the actual load transfer mechanism in a structural concrete member under ultimate load. In the present study, the development of the strut-and-tie model is transformed to the topology optimization problem of continuum structures. During the optimization process, both the stress and displacement constraints are satisfied and the performance of progressive topologies is evaluated. The influences on the strut-and-tie model in relation to different size, location and number of openings, as well as different loading and support conditions in deep beams are examined in some detail. In all, eleven deep beams with web openings are optimized and compared in nine groups. The optimal strut-and-tie models achieved are also compared with published experimental crack patterns. Numerical results have shown to confirm the experimental observations and to efficiently represent the load transfer mechanism in concrete deep beams with openings under ultimate load.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.