• 제목/요약/키워드: Load-sharing

검색결과 400건 처리시간 0.024초

마이크로프로세서를 이용한 인터넷기반 전력관리시스템 개발에 관한 연구 (A Study on Development of Internet Based Power Management System Using a Microprocessor)

  • 천행춘
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제28권5호
    • /
    • pp.746-753
    • /
    • 2004
  • In this paper, the Power Management System(PMS) which based on a decision making system according to power strategy is proposed and implemented. PMS is designed to have functions of power monitoring. controlling, synchronizing load sharing and monitoring of driving engine, etc. PMS consists of the internet communication system(ICS). Remote Management System(RMS) and Sensor Driver System (SDS) ICS transmits the monitoring and supervisory data via Internet to Remote Management System(RMS) in real-time SDS detects various power system data on local generator and utility via I/O interface system. I/O interface system receives various status data and outputs control signals. Implemented PMS is tested with dummy signal to verify proposed functions and shows good results. For future study implemented PMS will be tested under real load condition to merchandize.

A Current Sharing Circuit for the Parallel Inverter

  • Lee, Chang-Seok;Kim, Si-Kyung
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1998년도 Proceedings ICPE 98 1998 International Conference on Power Electronics
    • /
    • pp.176-181
    • /
    • 1998
  • The parallel inverter is popularly used because of its fault-tolerance capability, high-current outputs at constant voltages and system modularity. The conventional parallel inverter usually employs active and reactive power control of frequency and voltage droop control. However, these approaches have the disadvantages that the response time of parallel inverter control is slow against load and system parameter variation to calculate active, reactive power, frequency and voltage. This paper describes a novel control scheme for power equalization in parallel-connected inverter. The proposed scheme has a fast power balance control response, a simplicity of implementation, and inherent peak current limiting capability since it employees an instantaneous current/voltage control with output voltage and current balance and output voltage regulation. A design procedure for the proposed parallel inverter controller is presented. Furthermore, the proposed control scheme is verified through the experiment in various cases such as the system parameter variation, the control parameter variation and the nonlinear load condition.

  • PDF

새로운 병렬통신 알고리즘 및 부하분담 기능을 갖는 전자부하기 (A Novel Parallel Communication Algorithm and Load Sharing Electronic Load)

  • 주홍주;이상혁;김승룡;안강순;박성준
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2010년도 하계학술대회 논문집
    • /
    • pp.534-535
    • /
    • 2010
  • 최근 전원장치의 대용량화가 요구되면서 하나의 전원에서 모든 전력을 부담하는 것보다 여러 대의 전원을 병렬 운전하여 신뢰성을 높이고 용량을 증대시키는 방안이 연구되고 있다. 본 논문에서는 병렬 연결된 전원장치에 부하전류 분배를 하는데 있어 디지털 방식을 사용하여 고속 통신을 통한 제어를 이루어 시스템 비용을 낮추고 높은 수준의 제어 로직을 구성하여 부하 변동시 안정된 부하분담이 이루어지는 모듈화 된 일정 용량의 전원 장치를 제안하고 시뮬레이션을 통하여 검증하였다.

  • PDF

Analysis, Design and Implementation of an Interleaved Single-Stage AC/DC ZVS Converters

  • Lin, Bor-Ren;Huang, Shih-Chuan
    • Journal of Power Electronics
    • /
    • 제12권2호
    • /
    • pp.258-267
    • /
    • 2012
  • An interleaved single-stage AC/DC converter with a boost converter and an asymmetrical half-bridge topology is presented to achieve power factor correction, zero voltage switching (ZVS) and load voltage regulation. Asymmetric pulse-width modulation (PWM) is adopted to achieve ZVS turn-on for all of the switches and to increase circuit efficiency. Two ZVS half-bridge converters with interleaved PWM are connected in parallel to reduce the ripple current at input and output sides, to control the output voltage at a desired value and to achieve load current sharing. A center-tapped rectifier is adopted at the secondary side of the transformers to achieve full-wave rectification. The boost converter is operated in discontinuous conduction mode (DCM) to automatically draw a sinusoidal line current from an AC source with a high power factor and a low current distortion. Finally, a 240W converter with the proposed topology has been implemented to verify the performance and feasibility of the proposed converter.

작업자 공유가 가능한 이기종 병렬기계 작업장에서 작업자 부하균형 문제 (A Load Balancing Problem among Operators in a Nonidentical Parallel Machine Shop Considering Operator Sharing)

  • 문덕희;김대경
    • 산업경영시스템학회지
    • /
    • 제22권51호
    • /
    • pp.41-52
    • /
    • 1999
  • In this paper, a load balancing problem among operators is considered, when one or more machines can be assigned to an operator. The machines are grouped into two types and there are more than one machines in each group. The type of machine in which a job can be processed, is determined. However, an operator can handle both types of machine. The elementary operations of a job are classified into three classes : machine-controlled elements, operator-controlled elements and machine/operator- controlled elements. The objective is to balance the workloads among operators under the constraints of available machine-time and operator-time. A heuristic solution procedure is suggested for allocating jobs to machines and allocating machines to operators. The performance of the algorithm is evaluated with various data set.

  • PDF

SCM 개념의 통합 정보공유 계획과 적재대차 개선을 통한 물류비 절감방안 및 작업안전성 개선에 대한 연구 (A study about logistics costs reduction and improving work safety by way of stocking cart improvement and information sharing plan adopting the SCM theory)

  • 양두진;이창호;이공섭
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2005년도 춘계학술대회
    • /
    • pp.225-230
    • /
    • 2005
  • A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.

  • PDF

A Study on Photovoltaic/Wind/Diesel Hybrid Power System

  • Jeong, Byung-Hwan;Cho, Jun-Seok;Gho, Jae-Seok;Choe, Gyu-Ha;Kim, Eung-Sang;Lee, Chang-Sung
    • Journal of Power Electronics
    • /
    • 제3권1호
    • /
    • pp.40-48
    • /
    • 2003
  • In this paper, a hybrid power system with photovoltaic/wind/diesel generators is proposed to solve the defect of stand-alone type power system in a remote area. A hybrid power system has a power-balanced controller to equilibrate generation power with a given load demand and which is composed of common DC power system. To execute a power-balanced control, a hybrid power system is assumed that all of power generators have the characteristics of an equivalent current-source and load sharing control technique must be needed at the same time. So this paper discusses the structure of power-balance control for hybrid power system. And through the results of simulation, the proposed scheme was verified.

SCM 개념의 통합 정보공유 계획과 적재대차 개선을 통한 물류비 절감방안 및 작업안전성 개선에 대한 연구 (A study about logistics costs reduction and improving work safety by way of stocking cart improvement and information sharing plan adopting the SCM theory)

  • 양두진;이창호
    • 대한안전경영과학회지
    • /
    • 제7권2호
    • /
    • pp.41-56
    • /
    • 2005
  • A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.

작업자 공유가 가능한 병렬기계작업장에서 작업자 부하 균형을 고려한 작업할당문제 (A Load Balancing Problem in a Parallel Machine Shop Considering Operator Sharing)

  • 문덕희;김대경
    • 산업공학
    • /
    • 제12권2호
    • /
    • pp.166-173
    • /
    • 1999
  • In this paper, a load balancing problem among operators is considered, when one or more identical machines can be assigned to an operator. The operations of a job are separated into three categories : machine-controlled elements, operator-controlled elements and machine/operator-controlled elements. Machining or forming operations are included into the first category. The second category includes inspection and moving to another machine, and the last category includes setup and loading/unloading operation. The objective is to balance the workloads among operators under the constraints of available machine-time and operator-time. A hierarchical heuristic solution procedure is suggested for allocating jobs to each machine and allocating machines to each operator. The performance of the algorithm is evaluated with various data set.

  • PDF

온라인 무정전전원장치의 병렬운전 제어기술 (Parallel Operation Control Technique of On-line UPS System)

  • 조준석;강병희;고재석;최규하;김진홍;정석언
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2001년도 전력전자학술대회 논문집
    • /
    • pp.501-505
    • /
    • 2001
  • The parallel operation system of UPS is used to increase reliability of power source at critical load. But parallel UPS system has a few defects, impedance is different from each other and circulating current occurs between UPSs, due to line impedance and parameter variation, though controlled by the same synchronization signal. According to such characteristic of parallel UPS, balanced load-sharing control is the most important technique in parallel UPS operation. In this paper, a novel power deviation compensation algorithm is proposed. it is composed of voltage controller to compensate power deviation that be calculated by using active and reactive current deviation between inverters on synchronous d-q reference frame.

  • PDF