• 제목/요약/키워드: Load rejection

검색결과 113건 처리시간 0.032초

Field Adaptability Test for the Full Load Rejection of Nuclear Turbine Speed Controllers using Dynamic Simulator

  • Choi, In-Kyu;Kim, Jong-An;Woo, Joo-Hee
    • 조명전기설비학회논문지
    • /
    • 제23권7호
    • /
    • pp.67-74
    • /
    • 2009
  • This paper describes the speed control functions of the typical steam turbine speed controllers and the test results of generator load rejection simulations. The goal of the test is to verify the speed controller's ability to limit the steam turbine's peak speed within a predetermined level in the event of generator load loss. During normal operations, the balance between the driving force of the steam turbine and the braking force of the generator load is maintained and the speed of the turbine-generator is constant. Upon the generator's load loss, in other word, the load rejection, the turbine speed would rapidly increase up to the peak speed at a fast acceleration rate. It is required that the speed controller has the ability to limit the peak speed below the overspeed trip point, which is typically 110[%] of rated speed. If an actual load rejection occurs, a substantial amount of stresses will be applied to the turbine as well as other equipments, In order to avoid this unwanted situation, not an actual test but the other method is necessary. We are currently developing the turbine control system for another nuclear power plant and have plan to do the simulation suggested in this paper.

주파수 선택적 부하를 이용한 반사형 대역저지 필터 (A Reflection Type Band-rejection Filter Using the Frequency Selective Loads)

  • 김윤조;정승환;황희용;정중성;박준석
    • 한국전자파학회:학술대회논문집
    • /
    • 한국전자파학회 2002년도 종합학술발표회 논문집 Vol.12 No.1
    • /
    • pp.141-145
    • /
    • 2002
  • In this paper, we have implemented the reflection type band-rejection filter by employing the 3-㏈ hybrid and the frequency-selective loads. The frequency-selective loads have been achieved with the 3-pole bandpass filter terminated by a 50-ohm load. The reflection type band-rejection filter is less sensitive to unloaded Q-factor of resonator than the conventional one. Measurements and simulations on the presented band-rejection filter in this paper show the excellent performances in passband and rejection-band.

  • PDF

울진1,2호기 출력최적화 및 증기발생기 교체가 주급수 제어계통 안정도에 미치는 영향연구 (Research on a Stability of Feedwater Control System after Stretched Power Uprate and Replacement Steam Generator for Ulchin Units 1&2)

  • 윤덕주;김인환;이재용
    • 한국압력기기공학회 논문집
    • /
    • 제8권2호
    • /
    • pp.14-20
    • /
    • 2012
  • Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.

열방출량 (Heat Rejection Rate)을 이용한 PTC (Powertrain Cooling) 성능 추정 (Estimation of PTC (Powertrain Cooling) Performance with Heat Rejection Rate)

  • 민선기
    • 한국산학기술학회논문지
    • /
    • 제16권5호
    • /
    • pp.3030-3034
    • /
    • 2015
  • 새로운 엔진과 차량을 개발하여 엔진을 차량에 탑재할 때, 중요하게 고려해야 할 사항 중의 하나는 냉각 성능이다. 만약 냉각 성능이 열악하다면 엔진은 과열되어 파손되게 된다. 그러나 자동차회사에서 일반적으로 엔진은 차량보다 훨씬 빠른 시기에 개발이 진행되게 되어 엔진을 차량에 탑재한 조건에서 냉각 성능을 시험할 수 없다. 본 연구에서는 몇 가지 시험과 계산 결과를 이용하여 엔진의 냉각 성능을 추정하였다. 첫 번째로 엔진의 열정산 시험이 진행되었다. 두 번째로 냉각수 유동 시험이 진행되었다. 이 시험에서 라디에이터로 유입되는 유량을 구할 수 있다. 그리고 차량의 냉각 시험 성능 조건으로부터 차량의 부하와 속도를 구하고, 이로부터 엔진의 토크와 rpm이 계산되었다. 그리고 이러한 결과를 비교하여 엔진의 냉각 성능이 추정되었다.

부하차단시험에 의한 서인천복합화력 발전기.제어계의 모델링 및 검증 (Modeling and verification of generator/control system of Seo-Inchon combined-cycle plant by load rejection test)

  • 최경선;문영환;김동준;추진부;류승헌;권태원
    • 대한전기학회논문지
    • /
    • 제45권4호
    • /
    • pp.501-510
    • /
    • 1996
  • The gas-turbine generator of Seo-Incheon combined-cycle plant was tested for derivation of a model for dynamic analysis. Load rejection and AVR step test was performed to get the dynamic response of generator. The parameters of generator/control system model were determined by these measured data. No-load saturation test was performed for the saturation characteristics of the generator under steady state. V-curve test was also performed so as to find exact generator parameters. Q-axis parameters of generator was derived by measuring power angle. AVR and governor constants have been tuned by their oscillatory period and setting time characteristics. The derived parameters of generator control system is verified by one-machine infinite bus system simulation. (author). 7 refs., 20 figs., 5 tabs.

  • PDF

680MW 원자력발전소 증기터빈 발전기의 부하차단 모의시험 (A Simulation Test of Load Rejection for Steam Turbine Generator in a 680MW Nuclear Power Plant)

  • 최인규;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1605-1606
    • /
    • 2007
  • An electrical generator in power plant is driven and maintained its speed at rated by steam turbine. By the way, after synchronization in parallel with the power system, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip set point by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a field simulation test of generator load rejection to be implemented on the turbine governor in a 680MW nuclear power plant before its startup.

  • PDF

원자력발전소 증기터빈 발전기의 부하차단 모의시험 (A simulation test of lone rejection for steam turbine generator in nuclear power plant)

  • 최인규;정태원;이기성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2301-2303
    • /
    • 2003
  • A steam turnine in thermal/nuclear power plant drives generator and maintains it at rated speed using high temperature and high pressure steam energy. After synchronization in parallel with the power system, generator output increases according as the governor, that is the controller, increases steam flow into turbine. By the way, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip setpoint by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a simulation test of generator load rejection to be implemented on the turbine governor in a 600MW nuclear power plant before its startup.

  • PDF

Evaluation of Load Rejection to House Load Test at 100% Power for YGN 4

  • Sohn, Jong-Joo;Jeong, Won-Sang;Chi, Sung-Goo;Seo, Jong-Tae;Kim, Si-Hwan
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1995년도 추계학술발표회논문집(2)
    • /
    • pp.588-595
    • /
    • 1995
  • The Load Rejection to House Load test at 100% power was successfully performed during the YGN 4 PAT period. In this test, all plant control systems automatically controlled the plant from 100% power to house load operation mode. The LTC code, which was used in the performance analysis during the design process of YGN 3&4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design.

  • PDF

Evaluation of Load Rejection to House Load Test at 50% Power for UCN 3

  • Lee, Chang-Gyun;Suk whun Sohn;Sohn, Jong-Joo;Seo, Jong-Tae;Lee, Sang-Keun;Kim, Youngsung;Nam, Kyu-Won;Jung, Yang-Mook;Chae, Kyeong-Sik
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1998년도 춘계학술발표회논문집(1)
    • /
    • pp.398-403
    • /
    • 1998
  • The Load Rejection to House Load test at 50% power was successfully peformed during the UCN 3 PAT period. In this test, all plant control systems automatically controlled the plant from 50% power to house load operation mode. The KISPAC code, which was used in the performance analysis during the design process of UCN 3&4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design.

  • PDF

다변수 공정에서의 외란제거를 위한 다중루프 PI 제어기의 해석적 설계 (Analytical Design of Multiloop PI Controller for Disturbance Rejection in Multivariable Processes)

  • 트롱부;이지태;이문용
    • 제어로봇시스템학회논문지
    • /
    • 제12권5호
    • /
    • pp.505-508
    • /
    • 2006
  • This paper presents a new analytical approach for designing multiloop PI controllers for disturbance rejection in multivariable processes with time delay. The proposed method is based on IMC-PID design approach. To overcome a sluggish load response by dominant pole in the process, the IMC filter is modified to compensate the dominant pole effect. Based on the modified IMC filter, an analytical tuning rule for multiloop PI controller is driven by extending the generalized IMC-PID method for single input/single output (SISO) systems [1] to multi input/multi output (MIMO) systems. Simulation results show that the proposed method gives a satisfactory load performance as well as servo performance in the multiloop system.