• Title/Summary/Keyword: Load rejection

Search Result 113, Processing Time 0.027 seconds

Field Adaptability Test for the Full Load Rejection of Nuclear Turbine Speed Controllers using Dynamic Simulator

  • Choi, In-Kyu;Kim, Jong-An;Woo, Joo-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.7
    • /
    • pp.67-74
    • /
    • 2009
  • This paper describes the speed control functions of the typical steam turbine speed controllers and the test results of generator load rejection simulations. The goal of the test is to verify the speed controller's ability to limit the steam turbine's peak speed within a predetermined level in the event of generator load loss. During normal operations, the balance between the driving force of the steam turbine and the braking force of the generator load is maintained and the speed of the turbine-generator is constant. Upon the generator's load loss, in other word, the load rejection, the turbine speed would rapidly increase up to the peak speed at a fast acceleration rate. It is required that the speed controller has the ability to limit the peak speed below the overspeed trip point, which is typically 110[%] of rated speed. If an actual load rejection occurs, a substantial amount of stresses will be applied to the turbine as well as other equipments, In order to avoid this unwanted situation, not an actual test but the other method is necessary. We are currently developing the turbine control system for another nuclear power plant and have plan to do the simulation suggested in this paper.

A Reflection Type Band-rejection Filter Using the Frequency Selective Loads (주파수 선택적 부하를 이용한 반사형 대역저지 필터)

  • 김윤조;정승환;황희용;정중성;박준석
    • Proceedings of the Korea Electromagnetic Engineering Society Conference
    • /
    • 2002.11a
    • /
    • pp.141-145
    • /
    • 2002
  • In this paper, we have implemented the reflection type band-rejection filter by employing the 3-㏈ hybrid and the frequency-selective loads. The frequency-selective loads have been achieved with the 3-pole bandpass filter terminated by a 50-ohm load. The reflection type band-rejection filter is less sensitive to unloaded Q-factor of resonator than the conventional one. Measurements and simulations on the presented band-rejection filter in this paper show the excellent performances in passband and rejection-band.

  • PDF

Research on a Stability of Feedwater Control System after Stretched Power Uprate and Replacement Steam Generator for Ulchin Units 1&2 (울진1,2호기 출력최적화 및 증기발생기 교체가 주급수 제어계통 안정도에 미치는 영향연구)

  • Yoon, Duk-Joo;Kim, In-Hwan;Kim, Sang-Yeol
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.14-20
    • /
    • 2012
  • Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.

Estimation of PTC (Powertrain Cooling) Performance with Heat Rejection Rate (열방출량 (Heat Rejection Rate)을 이용한 PTC (Powertrain Cooling) 성능 추정)

  • Min, Sunki
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.5
    • /
    • pp.3030-3034
    • /
    • 2015
  • It is important to consider powertrain cooling performance, when engine is applied to new vehicle. If the performance is poor, engine will be damaged by overheating. But, the development timing of engine is faster than timing of vehicle, it is difficult to test the cooling performance of new engine and vehicle. In this study the powertain cooling performance was estimated with some test and calculation data. First, the heat rejection test was conducted. From this test, the heat rejection data at required rpm and load was acquired. Second, coolant flow test was conducted. From this test coolant flow rate to radiator was measured. Then engine torque and rpm was calculated from vehicle load and speed. Vehicle load and speed was calculated from test mode. Then by comparing these data, the powertrain cooling performance was estimated.

Modeling and verification of generator/control system of Seo-Inchon combined-cycle plant by load rejection test (부하차단시험에 의한 서인천복합화력 발전기.제어계의 모델링 및 검증)

  • 최경선;문영환;김동준;추진부;류승헌;권태원
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.45 no.4
    • /
    • pp.501-510
    • /
    • 1996
  • The gas-turbine generator of Seo-Incheon combined-cycle plant was tested for derivation of a model for dynamic analysis. Load rejection and AVR step test was performed to get the dynamic response of generator. The parameters of generator/control system model were determined by these measured data. No-load saturation test was performed for the saturation characteristics of the generator under steady state. V-curve test was also performed so as to find exact generator parameters. Q-axis parameters of generator was derived by measuring power angle. AVR and governor constants have been tuned by their oscillatory period and setting time characteristics. The derived parameters of generator control system is verified by one-machine infinite bus system simulation. (author). 7 refs., 20 figs., 5 tabs.

  • PDF

A Simulation Test of Load Rejection for Steam Turbine Generator in a 680MW Nuclear Power Plant (680MW 원자력발전소 증기터빈 발전기의 부하차단 모의시험)

  • Choi, In-Kyu;Jeong, Chang-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1605-1606
    • /
    • 2007
  • An electrical generator in power plant is driven and maintained its speed at rated by steam turbine. By the way, after synchronization in parallel with the power system, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip set point by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a field simulation test of generator load rejection to be implemented on the turbine governor in a 680MW nuclear power plant before its startup.

  • PDF

A simulation test of lone rejection for steam turbine generator in nuclear power plant (원자력발전소 증기터빈 발전기의 부하차단 모의시험)

  • Choi, In-Kyu;Jeong, Tae-Woon;Lee, Ki-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2301-2303
    • /
    • 2003
  • A steam turnine in thermal/nuclear power plant drives generator and maintains it at rated speed using high temperature and high pressure steam energy. After synchronization in parallel with the power system, generator output increases according as the governor, that is the controller, increases steam flow into turbine. By the way, as the steam flow into turbine can not be reduced fast even though the electrical load is lost, the turbine gets into dangerous situation due to the increase of its speed. At this time, the duty of the turbine governor is to limit the speed to its overspeed trip setpoint by stopping the steam flow as soon as possible, the test of which is called load rejection test. It is introduced in this paper for a simulation test of generator load rejection to be implemented on the turbine governor in a 600MW nuclear power plant before its startup.

  • PDF

Evaluation of Load Rejection to House Load Test at 100% Power for YGN 4

  • Sohn, Jong-Joo;Jeong, Won-Sang;Chi, Sung-Goo;Seo, Jong-Tae;Kim, Si-Hwan
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.05a
    • /
    • pp.588-595
    • /
    • 1995
  • The Load Rejection to House Load test at 100% power was successfully performed during the YGN 4 PAT period. In this test, all plant control systems automatically controlled the plant from 100% power to house load operation mode. The LTC code, which was used in the performance analysis during the design process of YGN 3&4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design.

  • PDF

Evaluation of Load Rejection to House Load Test at 50% Power for UCN 3

  • Lee, Chang-Gyun;Suk whun Sohn;Sohn, Jong-Joo;Seo, Jong-Tae;Lee, Sang-Keun;Kim, Youngsung;Nam, Kyu-Won;Jung, Yang-Mook;Chae, Kyeong-Sik
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1998.05a
    • /
    • pp.398-403
    • /
    • 1998
  • The Load Rejection to House Load test at 50% power was successfully peformed during the UCN 3 PAT period. In this test, all plant control systems automatically controlled the plant from 50% power to house load operation mode. The KISPAC code, which was used in the performance analysis during the design process of UCN 3&4, predictions of the test agreed with the measured data demonstrating the validity of the code as well as the completeness of the plant design.

  • PDF

Analytical Design of Multiloop PI Controller for Disturbance Rejection in Multivariable Processes (다변수 공정에서의 외란제거를 위한 다중루프 PI 제어기의 해석적 설계)

  • Vu Truong Nguyen Luan;Lee Ji-Tae;Lee Moon-Yong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.12 no.5
    • /
    • pp.505-508
    • /
    • 2006
  • This paper presents a new analytical approach for designing multiloop PI controllers for disturbance rejection in multivariable processes with time delay. The proposed method is based on IMC-PID design approach. To overcome a sluggish load response by dominant pole in the process, the IMC filter is modified to compensate the dominant pole effect. Based on the modified IMC filter, an analytical tuning rule for multiloop PI controller is driven by extending the generalized IMC-PID method for single input/single output (SISO) systems [1] to multi input/multi output (MIMO) systems. Simulation results show that the proposed method gives a satisfactory load performance as well as servo performance in the multiloop system.