• Title/Summary/Keyword: Load parallel

Search Result 932, Processing Time 0.027 seconds

A Current Sharing Circuit for the Parallel Inverter

  • Lee, Chang-Seok;Kim, Si-Kyung
    • Proceedings of the KIPE Conference
    • /
    • 1998.10a
    • /
    • pp.176-181
    • /
    • 1998
  • The parallel inverter is popularly used because of its fault-tolerance capability, high-current outputs at constant voltages and system modularity. The conventional parallel inverter usually employs active and reactive power control of frequency and voltage droop control. However, these approaches have the disadvantages that the response time of parallel inverter control is slow against load and system parameter variation to calculate active, reactive power, frequency and voltage. This paper describes a novel control scheme for power equalization in parallel-connected inverter. The proposed scheme has a fast power balance control response, a simplicity of implementation, and inherent peak current limiting capability since it employees an instantaneous current/voltage control with output voltage and current balance and output voltage regulation. A design procedure for the proposed parallel inverter controller is presented. Furthermore, the proposed control scheme is verified through the experiment in various cases such as the system parameter variation, the control parameter variation and the nonlinear load condition.

  • PDF

Adapted GSS Load Sharing Algorithm for Heterogeneous Cluster (이기종 클러스터를 위한 수정된 GSS 부하 분할 알고리즘)

  • Goo, Bon-geun
    • The KIPS Transactions:PartA
    • /
    • v.10A no.4
    • /
    • pp.331-338
    • /
    • 2003
  • Cluster is the cost-effective parallel processing environment, and consists of the off-the-shelf computers connected by the computer net works. The characteristics of cluster are the node heterogeneity, the variety of node load, and the variety of network load. Because these characteristics influence the performance of parallel program executions, the load sharing for cluster is important, and by using the proper load sharing strategy, we can reduce the execution time of parallel programs. In this paper, we propose modified GSS algorithm, αGSS. In the proposed load sharing algorithms α GSS, the size of tasks are decided using the BogoMIPS of node. From the result of out experiments, we conclude that the proposed αGSS algorithm is effective in the heterogeneous cluster.

Modified GSS Algorithm for Heterogeneous Cluster (이기종 클러스터를 위한 수정된 GSS 알고리즘)

  • 구본근
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2002.11a
    • /
    • pp.405-408
    • /
    • 2002
  • Cluster is the cost-effective parallel processing environment, and consists of the off-the-shelf computers connected by the computer networks. The characteristics of cluster are the node heterogeneity, the variety of node load, and the variety of network load. Because these characteristics influence the performance of parallel program executions, the load sharing for cluster is important, and by using the proper load sharing strategy, we can reduce the execution time of parallel programs. In this paper, we propose modified GSS algorithm, aGSS. In the proposed load sharing algorithms aGSS, the size of tasks are decided using the BogoMTPS of node. From the result of out experiments, we conclude that the proposed aGSS algorithm is effective in the heterogeneous cluster.

  • PDF

A Study on a Single-Phase Module UPS using a Three-Arm Converter/Inverter

  • Choi Y.K.;Ko T.G.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07b
    • /
    • pp.987-993
    • /
    • 2003
  • The module UPS can flexibly implement expansion of power system capacities. Furthermore, it can be used to build up the parallel redundant system to improve the reliability of power system operation. To realize the module UPS, load sharing without interconnection among parallel connecting modules as well as a small scale and lightweight topology is necessary. In this paper, the three-arm converter/inverter is compared with the general full-bridge and half-bridge topology from a practical point of view and chosen as the module UPS topology. The switching control approaches based on a pulse width modulation of the converter and inverter of the system are presented independently The frequency and voltage droop method is applied to parallel operation control to achieve load sharing. Two prototype 3kVA modules are designed and implemented to confirm the effectiveness of the proposed approaches. Experimental results show that the three-arm UPS system has a high power factor, a low distortion of output voltage and input current, and good load sharing characteristic.

  • PDF

A New Design on the Parallel Load Type IGBT Brake Chopper System for KTX-1 High Speed Train (KTX-1 고속전철의 병렬부하형 IGBT 제동초퍼장치 설계에 관한 연구)

  • Youn, Cha-Joong;Noh, Myoung-Gyu;Lee, Eul-Jae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.3
    • /
    • pp.424-430
    • /
    • 2013
  • This paper presents a new design works for the braking chopper system which is included in the propulsion system of KTX high speed train. Due to the current fed type synchronous motors used in the propulsion system, some different behaviors are shown comparing to the voltage type other chopper systems. Specially this chopper system acts either braking controlling or regenerative power controlling system with a parallel resistive load in the propulsion system. In this paper, an improved simple high power IGBT brake chopper system has proposed which is able to be replaced with an existing complicated GTO chopper system. The analytical approaches to the parallel load type current chopper system and the propper snubber circuits calculation were explained in this paper to control new chopper system. In addition, the thermal resistance of the cooling system for power dissipation of IGBT modules was calculated also. Finally several PC simulations have been done to clarify its availability.

Digital Load Sharing Method for Converter parallel Operation (컨버터 병렬운전을 위한 디지털 부하분담 기법)

  • Yoo, Kwang-Min;Kim, Won-Yong;Park, Seung-Hee;Lee, Dong-Hoo;Kim, Yun-Sung;Jeong, Yu-Seok;Lee, Jun-Young
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.17 no.2
    • /
    • pp.150-157
    • /
    • 2012
  • This paper presents CAN-based parallel-operation and load-sharing techniques for the communication server power supply. With the load information obtained through CAN communication, each modules performs its current control independently and the power unbalance caused by impedance differences of converter modules can be reduced. In conventional method, slave modules are controlled by master module. On the other hand, the proposed load share algorithm uses the Multi-Master method. Therefore, accurate load sharing can be accomplished by the reference structure of each module's average current. Each converter has two stages and it is separated into PFC, which is responsible for harmonic regulation, and LLC resonant converter, which controls output voltage. To verified the performance of the proposed method, two 2KW prototypes has been implemented and experimented.

Load-Sharing Algorithm using Digital Parallel Communication (디지털 병렬 통신을 이용한 부하분담 알고리즘)

  • Park, Seong-Mi;Kim, Chun-Sung;Lee, Sang-Hyeok;Lee, Sang-Hun;Park, Sung-Jun;Lee, Bae-Ho
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.16 no.1
    • /
    • pp.50-57
    • /
    • 2011
  • In this paper, we proposes a new load-sharing algorithm with a ATmega2560 based digital communication. Proposed algorithm is different from conventional analog method. The high speed communication digital control is performed. To apply the digital communication and real-time control for time-sharing token bus method, we implemented high efficient load-sharing and redundancy. Also this system make down the price by auto ID algorithm and system response is improved by controller's voltage and current integral value sharing. In parallel system prototype, each module have controller and performed load-sharing according to master module integral value. In this paper, we verify the validity of proposed algorithm using PSIM program and prototype.

Estimation of the Circulating Currents in the Parallel Operation of Transformers (변압기 병렬운전시 순환전류 추정)

  • Kang, Yong-Cheol;Lee, Mi-Sun;Lee, Byung-Eun;Choi, Jae-Sun;Jang, Sung-Il;Kim, Yong-Gyun;Lyu, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2147-2152
    • /
    • 2008
  • This paper proposes an algorithm to estimate the circulating currents in the transformers in parallel in an ultra high voltage system. For the Y-Y-${\Delta}$ transformers operated in parallel, there exist two kinds of the circulating currents i.e. one is between the tanks and the other between the banks of the delta side. As the former is 90 deg out of phase of the load current, it is estimated by decomposing the line current into the component 90 deg out of phase of the load current in the frequency domain. The latter is estimated in the time domain from applying the Kirchhoff's voltage law on the delta winding which gives a first-order differential equation in terms of the delta winding currents. To estimate the circulating currents between the tanks, the performance of the proposed algorithm is investigated when the impedances of the two transformer tanks are different or the taps of the on-load tap changer of the transformers are mismatched temporarily. To estimate the circulating currents between the banks, the performance of the proposed algorithm is also examined under magnetic inrush and over-excitation. Test results indicate that the algorithm can estimate the two kinds of the circulating currents successfully.

A Study on Parallel Operation Between Inverter System and Utility Line (인버터 시스템과 상용 전력 계통과의 병렬 운전에 관한 연구)

  • 천희영;박귀태;유지윤;안호균
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.4
    • /
    • pp.369-378
    • /
    • 1992
  • This paper proposes a utility parallel processing inverter system, which consists of a voltage source PWM inverter, isolation transformer and a reactor linking the inverter to utility line. This system realizes following functions : (1) voltage phase frequency and amplitude synchronization between inverter and utility line at stand-alone mode. (2) current phase synchronization between inverter and load at parallel mode. Therefore, despite sudden increase in load current over setting point at stand-alone mode, inverter system can be transferred into parallel mode immediately without transient current. Furthermore, high frequency(18KHz) PWM control and sinusoidal filtering improve the inverter output waveform by eliminating high order harmonic components as well as low order. As a switching device, IGBT is used for high frequency switching and large current capacity.

  • PDF

SOC-based Sequencing Equalizer for Parallel-connected Battery Configuration using ANFIS Algorithm

  • Duong, Tan-Quoc;La, Phuong-Ha;Choi, Sung-Jin
    • Proceedings of the KIPE Conference
    • /
    • 2019.11a
    • /
    • pp.174-175
    • /
    • 2019
  • Battery cells are connected in parallel to enlarge the system capacity. However, cell inconsistency may reduce the overall system capacity and cause the over-charging or over-discharging issue. This paper proposes a SOC-based sequencing equalizer for parallel-connected battery configuration that uses the ANFIS (adaptive neuro-fuzzy inference system) algorithm to make the switching decision. Depend on the load current and the SOC (state-of-charge) rate of cells, the switching decision is made to equalize the SOC of the battery cells. The simulation results show that the system capacity is maximized and the controller is adaptive for a large number of parallel-connected in dynamic load profile.

  • PDF