• 제목/요약/키워드: Load Smoothing

검색결과 63건 처리시간 0.028초

시뮬레이터 컨버터에 의한 인버터 성능시험에 관한 연구 (A Study on the Inverter performance by Simulated Converter)

  • 조정민;조주현;김성남;이승환;오봉환;이훈구;김용주;한경희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.983-985
    • /
    • 2002
  • This paper is the machine that is able to estimate a new built power convertor in a production line. Generally, this machine test can be achieved by connecting it to a dynamometer consisting of a three-phase machine joined by a rigid shaft to a DC load machine. But the proposal system is controlled to create some specific load characteristic needed for the test without any mechanical equipment. The suggested test stand consists only of a converter to be test and a simulator converter. Both devices are connected back-to-back on the AC-side via smoothing reactors. The simulator operates in real-time as an equivalent load circuit, so that the device under test will only notice the behaviour of a three-phase machine under consideration of the load. And then, to obtain a superior characteristic for dynamic reference used the feedforward control.

  • PDF

시뮬레이터 컨버터에 의한 인버터 성능시험에 관한 연구 (A Study on the Inverter performance test by Simulated Converter)

  • 조정민;함년근;김대균;이상집;김성남;이훈구;한경희
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2003년도 춘계전력전자학술대회 논문집(2)
    • /
    • pp.765-768
    • /
    • 2003
  • In the end of a production line a new built power converter has to undergo a series of stress tests. This can be achieved by connecting it to a dynamometer consisting of a three-phase machine joined by a rigid shaft to a DC load machine. The latter is controlled to create some specific load characteristic needed for the test. In this paper a test method is proposed, in which no mechanical equipment is needed. The suggested test stand consists only of a converter to be tested and a simulator converter. Both devices are connected back-to-back on the AC-side via smoothing reactors. The simulator operates in real-time as an equivalent load circuit, so that the device under test will only notice the behaviour of a three-phase machine under consideration of the load.

  • PDF

계통연계형 태양광발전 시스템의 속응성 제어 (Rapid response control A Utility Interactive Photovoltaic Generation System)

  • 정춘병;전기영;이상현;한경희
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 추계학술대회 논문집
    • /
    • pp.279-285
    • /
    • 2007
  • Since the residential load is an AC load and the output of solar cell is a DC power, the photovoltaic system needs the DC/AC converter to utilize solar cell. In case of driving to interact with utility line, in order to operate at unity power factor, converter must provide the sinusoidal wave current and voltage with same phase of utility line. Since output of solar cell is greatly fluctuated by insolation, it is necessary that the operation of solar cell output in the range of the vicinity of maximum power point. In this paper, DC/AC converter is three phase PWM converter with smoothing reactor. And then, feedforward control used to obtain a superior characteristic for current control and digital PLL circuit used to detect the phase of utility line.

  • PDF

PWM 컨버터를 이용한 계통연계 에너지시스템에 관한 연구 (A Study on Utility Interactive Energy System using PWM Converter)

  • 김길동;이한민;홍용기;김대균
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.288-291
    • /
    • 2007
  • Since the residential load is an AC load and the output of solar cell is a DC power, the photovoltaic system needs the DC/AC converter to utilize solar cell. In case of driving to interact with utility line, in order to operate at unity power factor, converter must provide the sinusoidal wave current and voltage with same phase of utility line. Since output of solar cell is greatly fluctuated by insolation, it is necessary that the operation of solar cell output in the range of the vicinity of maximum power point. In this paper, DC/AC converter is three phase PWM converter with smoothing reactor. And then, feedforward control used to obtain a superior characteristic for current control and digital PLL circuit used to detect the phase of utility line.

  • PDF

최대수요전력 관리 장치의 최대수요전력 예측 방법에 관한 연구 (Method of Demand Forecasting for Demand Controller)

  • 권용훈;김호진;공인엽
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2012년도 춘계학술대회
    • /
    • pp.833-836
    • /
    • 2012
  • 최대수요전력 관리 장치는 현재 사용전력을 모니터링하여 예측 전력을 계산해 수용가에서 설정한 목표전력을 초과하지 않게 부하를 제어하는 장치이다. 부하의 제어는 예측된 최대수요전력이 목표전력을 초과할 경우 경보를 발생하고 부하를 차단하는 방식을 사용하기 때문에 최대수요전력에 대한 정확한 예측이 중요하다. 전력 변동이 심한 수용가에서는 기존의 예측 방법을 사용할 경우 최대수요전력 관리가 안정적이지 못하다는 단점이 있다. 본 논문에서는 기존의 최대수요전력 예측 방법 및 지수평활방법을 살펴보고 칼만 필터를 사용한 예측 방법을 제안한다.

  • PDF

수요측 단기 전력소비패턴 예측을 위한 평균 및 시계열 분석방법 연구 (A Study on Forecasting Method for a Short-Term Demand Forecasting of Customer's Electric Demand)

  • 고종민;양일권;송재주
    • 전기학회논문지
    • /
    • 제58권1호
    • /
    • pp.1-6
    • /
    • 2009
  • The traditional demand prediction was based on the technique wherein electric power corporations made monthly or seasonal estimation of electric power consumption for each area and subscription type for the next one or two years to consider both seasonally generated and local consumed amounts. Note, however, that techniques such as pricing, power generation plan, or sales strategy establishment were used by corporations without considering the production, comparison, and analysis techniques of the predicted consumption to enable efficient power consumption on the actual demand side. In this paper, to calculate the predicted value of electric power consumption on a short-term basis (15 minutes) according to the amount of electric power actually consumed for 15 minutes on the demand side, we performed comparison and analysis by applying a 15-minute interval prediction technique to the average and that to the time series analysis to show how they were made and what we obtained from the simulations.

압전소자를 이용한 에너지 하베스터용 전력변환장치 연구 (A Study of Power Conversion System for Energy Harvester Using a Piezoelectric Materials)

  • 안현성;김영철;차한주
    • 전기학회논문지
    • /
    • 제66권7호
    • /
    • pp.1059-1065
    • /
    • 2017
  • In this paper, the energy harvester with a piezoelectric materials is modeled as the electric equivalent circuit, and performances of a standard DC method and a Parallel-SSHI method are verified through experiment under variable force and load conditions. Piezoelectric generator consists of mass, damper and spring constant, and it is modeled by electrical equivalent circuit with RLC components. Standard DC and Parallel-SSHI are used as power conversion methods, and standard DC consists of full-bridge rectifier and smoothing capacitor. Parallel-SSHI method is composed of L-C resonant circuit, zero-crossing detector and full-bridge rectifier. In case of simulation under $100k{\Omega}$ load condition, the harvested power is $500{\mu}W$ in Standard DC and $670{\mu}W$ in Parallel-SSHI, respectively. In experiment, the harvested power under $100k{\Omega}$ load condition is $420{\mu}W$ in standard DC and $602{\mu}W$ in Parallel-SSHI. Harvested power of Parallel-SSHI is improved by approximately 40% more than that of standard DC method.

Winters' Multiplicative Seasonal Model에 의한 월 최대 전력부하의 단기예측 (Short-Term Forecasting of Monthly Maximum Electric Power Loads Using a Winters' Multiplicative Seasonal Model)

  • 양문희;임상규
    • 대한산업공학회지
    • /
    • 제28권1호
    • /
    • pp.63-75
    • /
    • 2002
  • To improve the efficiency of the electric power generation, monthly maximum electric power consumptions for a next one year should be forecasted in advance and used as the fundamental input to the yearly electric power-generating master plan, which has a greatly influence upon relevant sub-plans successively. In this paper, we analyze the past 22-year hourly maximum electric load data available from KEPCO(Korea Electric Power Corporation) and select necessary data from the raw data for our model in order to reflect more recent trends and seasonal components, which hopefully result in a better forecasting model in terms of forecasted errors. After analyzing the selected data, we recommend to KEPCO the Winters' multiplicative model with decomposition and exponential smoothing technique among many candidate forecasting models and provide forecasts for the electric power consumptions and their 95% confidence intervals up to December of 1999. It turns out that the relative errors of our forecasts over the twelve actual load data are ranged between 0.1% and 6.6% and that the average relative error is only 3.3%. These results indicate that our model, which was accepted as the first statistical forecasting model for monthly maximum power consumption, is very suitable to KEPCO.

PWM 컨버터를 이용한 계통연계형 태양광발전 시스템 (A Utility Interactive Photovoltaic Generation System using PWM Converter)

  • 김대균;정정훈;정춘병;김성남;이승환;강승욱;오봉환;이훈구;김용주;한경희
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2004년도 전력전자학술대회 논문집(1)
    • /
    • pp.133-136
    • /
    • 2004
  • Since the residential load is an AC load and the output of solar cell is a DC power, the photovoltaic system needs the DC/AC converter to utilize solar cell. In case of driving to interact with utility line, in order to operate at unity power factor, converter must provide the sinusoidal wave current and voltage with same phase of utility line. Since output of solar cell is greatly fluctuated by insolation, it is necessary that the operation of solar cell output in the range of the vicinity of maximum power point. In this paper, DC/AC converter is three phase PWM converter with smoothing reactor. And then, feedforward control used to obtain a superior characteristic for current control and digital PLL circuit used to detect the phase of utility line.

  • PDF

타동용 4 분제 2상쵸퍼방식의 특성 (A Study of Two Phase Chopper System with Four Separate Groups of DC Motors in Powering)

  • 정연택;한경희;김용주;이영일;오봉환
    • 대한전기학회논문지
    • /
    • 제36권3호
    • /
    • pp.171-178
    • /
    • 1987
  • A study of two phase chopper system with four separate groups of DC motors in powering. A novel two phase chopper system with four separate groups of DC motors which applies the principles of two phase chopper with two separate groups of DC motors is dealt with this article. The main circuit consists of eight sets of chopping parts, four diodes and four separate groups of DC motors. Four groups of DC motors are driven through the series and parallel connections to each other in accordance with the operating conditions of the choppers. Although the proposed chopper circuit requires more circuit elements than the conventional two phase chopper system with combined output or two phase chopper system with two separate groups of DC motors, it has the following advantages` (1). It is possible to drive twice as much motors as conventional system does, using esisting receiving-and equipments and motors. (2). It is possible to control load voltage continuously from 0 to source voltage by changing time-ratio from 0 to 1. (3). Load current division becomes equalized. Therefore it is possible to drive not only series motors but also shunt and separately exited motors. (4). When smoothing reactor L is small, harmonic components of the proposed circuit is not so large. Therefore, the value of L can be determined from viewpoints of allowable value of ripple-ratio and current unbalance factor.