• Title/Summary/Keyword: Load Management

Search Result 2,130, Processing Time 0.049 seconds

A Study on the Intelligent Load Management System Based on Queue with Diffusion Markov Process Model (확산 Markov 프로세스 모델을 이용한 Queueing System 기반 지능 부하관리에 관한 연구)

  • Kim, Kyung-Dong;Kim, Seok-Hyun;Lee, Seung-Chul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.5
    • /
    • pp.891-897
    • /
    • 2009
  • This paper presents a novel load management technique that can lower the peak demand caused by package airconditioner loads in large apartment complex. An intelligent hierarchical load management system composed of a Central Intelligent Management System(CIMS) and multiple Local Intelligent Management Systems(LIMS) is proposed to implement the proposed technique. Once the required amount of the power reduction is set, CIMS issues tokens, which can be used by each LIMS as a right to turn on the airconditioner. CIMS creates and maintains a queue for fair and proper allocation of the tokens among the LIMS requesting tokens. By adjusting the number tokens and queue management policies, desired power reduction can be achieved smoothly. The Markov Birth and Death process and the Balance Equations utilizing the Diffusion Model are employed for evaluation of queue performances during transient periods until the static balances among the states are achieved. The proposed technique is tested using a summer load data of a large apartment complex and give promising results demonstrating the usability in load management while minimizing the customer inconveniences.

A Study on the Final Evaluation Criteria of Allocation Exceedance Regional in Total Maximum Daily Load (오염총량관리 할당부하량 초과지역의 최종 평가기준에 관한 연구)

  • Oh, Seung Young;Han, Mideok;Kim, Seok Gyu;Ahn, Ki Hong;Kim, Oksun;Kim, Yong Seok;Park, Ji Hyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.5
    • /
    • pp.450-457
    • /
    • 2016
  • The Total Maximum Daily Load (TMDL) is a watershed management system that involves the establishment of the target water quality, the calculation of permission loading (allocation loading), and the control of total pollutants for each unit watershed. Allocation loading is assessed through the comprehensive implementation assessment of the previous year's plan. Assessment results are used for follow-up management measures such as the limit of development and updating of TMDL Management Implementation Plans for the next planning period. Although detailed assessment criteria are important, they are not currently available. Therefore, we suggested assessment criteria by comparing two methods('integration method' and 'separation method') using combination point and non-point discharge loading. We also examined the penalty criteria considering controllable load local government and updating methods of the TMDL Management Implementation Plan for the next planning period.

feasibility Study in Application on Load Management of Cooling or Heating Systems (${\cdot}$난방 시스템의 부하관리 프로그램 적용 타당성 검토)

  • Son H.S.;Kim H.C.;Kim H.J.;Hur D.R.;Park J.B.;Shin J.R.
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.686-688
    • /
    • 2004
  • We suggest that the core factor which can be established successfully pushing ahead with domestic load management program is finding and keeping management of controllable load resources. We know that load management is mostly the maximum demand power management and participation of DLC program. This paper suggests the way coping with load management suggesting model which air conditioning and heating load facilities are applied to DU program.

  • PDF

A development of direct load control system for air-conditioner (원격제어 에어컨 개발 보급현황 및 향후전망)

  • Gang, Won-Gu;Kim, Choong-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2446-2448
    • /
    • 2001
  • In addition to the stabilization of electricity supply and the quality management of electricity, load balance has been an important strategy for achieving high quality load management. Among many techniques for load management, direct load management has been actively studied and applied for increasing the efficiency of power facility and suppressing peak load. In Korea, the highest peak load is demanded in summer rather than in winter, and almost 50% of the peak load comes from cooling load. Currently, applicable systems are limited to air conditioners that have the cooling capacity less than 2kW. This paper describes the development of remote controlled air conditioners and the result of the field test of the new type air conditioner. The technical specification based on the test will be applied to the new model of the remote controlled air conditioner. The wide distribution of the air conditioners to the public will be helpful to control peak demand due to cooling load in summer time. Financial investment to generating, transmission, distribution facilities will be decreased from flatting the seasonal power load.

  • PDF

Load Management of Natural Gas (천연가스 부하관리)

  • Choi, Keum-Nam;Kim, Yong-Chan;Hong, Hi-Ki;Kim, Sang-No;Kim, In-Taek;Jeon, Ho-Cheol
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.264-269
    • /
    • 2006
  • Efficient load management on natural gas is strongly required to allow stable and reasonable energy use. The present study investigated domestic and international cases for demand management of natural gas. The directions of load management were discussed. The reasonable evaluation methods of demand management were analyzed and specific evaluation items were suggested.

  • PDF

Integration of Total Pollution Load Management System and Environmental Impact Assessment related System (수계 오염총량관리제와 환경영향평가제도의 통합운영방안)

  • Lee, Jong-Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.5
    • /
    • pp.359-367
    • /
    • 2003
  • The total pollution load management system of watershed has been implemented upon Special Law pertaining to the Han River Watershed Water Quality Improvement and Residents Support, Special Law pertaining to the Nakdong River Watershed Water Management and Residents Support, Special Law pertaining to the Youngsan River Watershed Water Management and Residents Support, and Special Law pertaining to the Seomjin River Watershed Water Management and Residents Support in Korea since 2002. But many other similar systems with total pollution load management system of watershed are being operated separately or independently, even though its purpose is nearly same with those of the total maximum pollutants load management in Law on Water Quality Environmental Protection, environmental impact assessment(EIA) in Law of Impact Assessment on Environment, Transportation and Disaster and Pre-environmental assessment of Environmental Policy Act. Therefore the contents of total pollution load management system of watershed and many other related systems could be overlapped and at some times have inconsistency among them. This study suggests first the integrated operation of total pollution load management system of watershed, EIA, pre-environmental assessment, urban planning, and sewage planning and secondly EIA system development by integration of EIA and pre-environmental assessment and strategic environmental assessment(SEA).

The Study on the Field test and Operational Method of a Direct Load Control System for Air conditioner (에어컨부하 직접제어시스템 실증시험 및 운용방안에 관한 연구)

  • Gang, Won-Gu;Kim, Chung-Hwan;Kim, Myong-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07d
    • /
    • pp.2825-2827
    • /
    • 2000
  • In electric power industry. load balance has been one of the most fundamental and important management goals. Therefore. the strategy to achieve high quality load management now includes load balance besides the stabilization of electricity supply and quality management of electricity. Amongst many techniques of load management. direct load management has been actively studied and utilized to increase power facility and peak load suppression. Higher peak load situation is appeared during summer than during winter in Korea. and approximately 20% of the peak load is due to the load for air-conditioning. To cope with this peak load problem during summer KEPCO is performing a research project to develop a system to remotely control air-conditioning load using wireless communication. Currently, applicable facilities are limited to small-scale air-conditioning facility that has less than 2KW power capacity. This paper described the 1st year of efforts made in the study.

  • PDF

The Analysis of Load Management Effect in Shor-Term Generation Expansion Planning (단기 전력우급계획에서의 부하관리 효과 분석연구)

  • 김준현;정도영
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.9
    • /
    • pp.994-1002
    • /
    • 1992
  • With regard to price elasticity and cross elasticity of electricity, optimal generation expansion planning method including load management effect is suggested. In addition, optimal peak time price can be determined simultaneously, and we adopt peak time tariff as load management strategy. Instead of using hourly marginal demand curves where we can get customer surplus, we used chronological load curve with constraints to preserve social welfare. This method is proved useful in short-term generation expansion planning.

  • PDF

A Study of Autonomous Intelligent Load Management System Based on Queueing Model (큐잉모델에 기초한 자율 지능 부하 관리 시스템 연구)

  • Lee, Seung-Chul;Hong, Chang-Ho;Kim, Kyung-Dong;Lee, In-Yong;Park, Chan-Eom
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.2
    • /
    • pp.134-141
    • /
    • 2008
  • This paper presents an innovative load management technique that can effectively lower the summer peak load by adjusting the aircondition loads through smoothe coordinations between utility companies and large customers. An intelligent hierarchical load management system composed of a Central Intelligent Load Management System(CIMS) and multiple Local Intelligent Management Systems(LIMS) is also proposed to implement the reposed technique. Upon receiving a load curtailment request from the utilities, CIMS issues tokens, which can be used by each LIMS as a right to turn on the airconditioner. CIMS creates and maintains a queue for fair allocation of the tokens among the LIMS demanding tokens. By adjusting the number tokens and queue management Policies, desired load factors can be achieved conveniently. The Markov Birth and Death Process and the Balance Equations are employed in estimating various queue performances. The proposed technique is tested using a summer load data of a large apartment complex and proved to be quite effective in load management while minimizing the customer inconveniences.

Development of Desktop-Based LDC Evaluation System for Effectiveness TMDLs (효과적인 오염총량관리를 위한 데스크탑 기반의 LDC 평가 시스템 개발)

  • Ryu, Jichul;Hwang, Ha-Sun;Lee, Sung-Jun;Kim, Eun Kyoung;Kim, Yong Seok;Kum, Donghyuk;Lim, Kyoung Jae;Jung, Younghun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.4
    • /
    • pp.67-74
    • /
    • 2016
  • Load Duration Curve (LDC) can be used as a method for load management of point and non-point pollution source because the LDC easily assesses the water quality corresponding to hydrological changes in a watershed. Recently, the application of LDC to total pollution load management is a growing interest in Korea. In this regard, A desktop-based LDC assessment system was developed in this study to provide convenience to users in water quality evaluation. The developed system can simply produce the LDC by using streamflow and water quality data involved in its database. Also, The system can quantitatively inform the success or failure of the achievement for a target water quality at monthly scale. Furthermore, seasonal water quality and point/non-point pollution load in a watershed can be estimated by this system. We expect that the developed system will contribute to establish local and national policies regarding water management and total pollution load management because of its advantages such as the pollution tracking investigation and the analysis of water quality and pollution loading amount in an ungauged watershed.