• Title/Summary/Keyword: Load Distribution Method

Search Result 1,429, Processing Time 0.022 seconds

Prediction of Thermal Load Distribution and Temperature of the Superheater in a Tangentially Fired Boiler (접선 연소식 보일러의 최종 과열기 열부하 분포 및 튜브 온도 예측에 관한 연구)

  • Park, Ho-Young;Sea, Sang-Il
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.20 no.7
    • /
    • pp.478-485
    • /
    • 2008
  • The extreme steam temperature deviation experienced in the superheater of a tangentially fired boiler can seriously affect its economic and safe operation. This temperature deviation is one of the main causes of boiler tube failures. The steam temperature deviation is mainly due to the thermal load deviation in the lateral direction of the superheater. The thermal load deviation consists of several causes. One of the causes is the non-uniform heat flow distribution of burnt gas on the superheater tube system. This distribution is very difficult to measure in situ using direct experimental techniques. So, we need thermal load model to estimate the tube temperature. In this paper, we propose a thermal load distribution model by using CFD analysis and plant data. We successfully predict the tube temperature and the steam flow rate in a final superheater system from the thermal load model and one dimensional heat-flow system analysis. The proposed model and analysis method would be valuable in preventing the frequent tube failure of the final superheater tubes.

Distribution Load Forecasting based with Land-use Estimation (토지용도 추정을 기반으로 한 배전계통 부하예측)

  • Kwon, Seong-Chul;Lee, Hak-Joo;Choi, Byoung-Youn
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1481-1483
    • /
    • 1999
  • Power distribution system planning for maximum customer satisfaction and system efficiency requires accurate forecast of future demand in service area. Spatial load forecasting method provides a more accurate estimation of both magnitudes and location of future electrical load. This method considers the causes of load growth due to addition of customers and per capita consumption among customers by land use (residential, commercial and industrial). So the land-use study and it's preference for small area is quite important. This paper proposes land-use preference estimation method based on fuzzy logic. Fuzzy logic is applied to computing preference scores for each land-use and by these scores the customer growth is allocated in service area. An simulation example is used to illustrate the proposed method.

  • PDF

Development of Load Distribution Controller on the Midnight-Power Boiler (심야전력용 보일러의 부하분산 제어기 개발)

  • Park, Hyun-Chul;Kim, Yeong-Min;Hwang, Jong-Sun;Lim, Byung-Hyun;Kim, Jong-Man
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.05b
    • /
    • pp.132-135
    • /
    • 2003
  • The use of the midnight power faces the crisis of the load peak-cut problem. Which appears at the simultaneous start of the midnight power system. We suggest a control method which uses the characteristics of boiler system. The system used that method consists of 6 heaters and are designed for the load distribution on each heater. Proposed method can take the balance of load during full time of midnight power supplied. The system is composed of measurement part and heater controller. Taking the data of the experience as a reason, the algorithm make the midnight power distribute. Experimental results show the validity of the method and the system proposed.

  • PDF

Position and Force Control for Two Robots with Application to Load Distribution (두 로보트의 위치 및 힘 제어의 부하분배에 관한 응용)

  • Kim, Kab-Il;Jeon, Hun-Jong;Kim, Dong-Jun
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.414-416
    • /
    • 1992
  • Stability analysis and load distribution problem of two coordinating robots using full dynamic model is studied in this paper. Dynamic models of two robots are combined with the position force control strategy and the Liapunov 2nd method is used for the proof of the stability. This analysis shows that the position and force control of two coordinating robot is always stable. Also, load distribution problem is mentioned with respect to the end-effector forces minimizing joint torques.

  • PDF

A Load Distribution Technique of Web Clustering System based on the Real Time Status of Real Server (웹 클러스터 시스템의 실시간 서버 상태를 기반으로 한 부하분산 방안)

  • Youn, Chun-Kyun
    • The KIPS Transactions:PartA
    • /
    • v.12A no.5 s.95
    • /
    • pp.427-432
    • /
    • 2005
  • I studied about existent load distribution algorithms and the WLC(Weighted Least Connection) algerian that is using much at present to distribute the connection request of users to real servers efficiently in web cluster system. The efficiency of web cluster system is fallen by load imbalance between servers, because there is problem In inaccurate load status measuring of servers and measuring timing at these load distribution algorithms. In this paper, I suggest an algorithm that distributes load base on various load state of servers by real time using broadcasting RPC(Remote Procedure Call) when a user requests connection, and implement a prototype and experiment its performance. The experiment result shows that load imbalance phenomenon between reai sowers was improved greatly than existing method, and performance of web cluster system was improved by efficiency that response time is shortened.

A parametric study of bolt-nut joints by the method of finite element contact analysis (유한 요소 접촉 해석법에 의한 나사 체결부 설계 개선에 관한 연구)

  • 이병채;김영곤
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.13 no.3
    • /
    • pp.353-361
    • /
    • 1989
  • A parametric study of load distribution in bolt-nut joints is performed by the method of finite element contact analysis. The contacting surface is assumed unbonded and frictionless. Multi-body contact analysis is performed in elastic region under the assumption of axi-symmetric stress state. Load acting on the first thread from the fastened plate is much greater than that on the other threads in the standard setting. But the load distribution is shown to be improved by making the center of contact force acting on the nut surface move outwards. Such a modification is possible by enlarging the gap between bolt shank and fastened plate or by inserting suitable washers. Shape modification of the standard nut by the making a groove and a step on the nut surface is also suggested, which results in almost uniform load distribution and considerable decrease in the maximum stress of the joint.

A Fast Configuration Method for Load Balancing in Distribution System (배전계통의 부하평형을 고려한 고속 계통구성방법)

  • Nam, Kee-Young;Choi, Sang-Bong;Jeong, Seong-Hwan;Ryoo, Hee-Suk;Kim, Ho-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.381-383
    • /
    • 2003
  • The authors have developed a solution method based on the incremental algorithm. The optimal load balance between feeders is found through the incremental algorithm with allowing the loop configuration. Therefore loops can be configured in the resulting configuration, and then we must eliminate all loops to satisfy radiality of distribution system because the distribution system is operated under radial status. But the optimal load balance through incremental algorithm is deteriorated when the loops are eliminated. In this paper, authors propose a new method which is to improve the searching procedure of path in the incremental algorithm, that is, so as not to make loop in the path configuration.

  • PDF

Typical Daily Load Profile Generation using Load Profile of Automatic Meter Reading Customer (자동검침 고객의 부하패턴을 이용한 일일 대표 부하패턴 생성)

  • Kim, Young-Il;Shin, Jin-Ho;Yi, Bong-Jae;Yang, Il-Kwon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.9
    • /
    • pp.1516-1521
    • /
    • 2008
  • Recently, distribution load analysis using AMR (Automatic Meter Reading) data is researched in electric utilities. Load analysis method based on AMR system generates the typical load profile using load data of AMR customers, estimates the load profile of non-AMR customers, and analyzes the peak load and load profile of the distribution circuits and sectors per every 15 minutes/hour/day/week/month. Typical load profile is generated by the algorithm calculating the average amount of power consumption of each groups having similar load patterns. Traditional customer clustering mechanism uses only contract type code as a key. This mechanism has low accuracy because many customers having same contract code have different load patterns. In this research, We propose a customer clustring mechanism using k-means algorithm with contract type code and AMR data.

Live Load Distribution in Prestressed Concrete I-Girder Bridges (I형 프리스트레스트 콘크리트 거더교의 활하중 분배)

  • Kim, Kwang-Yang;Kang, Dae-Hui;Lee, Hwan-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.288-293
    • /
    • 2008
  • The standard prestressed concrete I-girder bridge (PSC I-girder bridge) is one of the most prevalent types for small and medium bridges in Korea. When determining the member forces in a section to assess the safety of girder in this type of bridge, the general practice is to use the simplified practical equations or the live load distribution factors proposed in design standards rather than the precise analysis through the finite element method or so. Meanwhile, the live load distribution factors currently used in Korean design practice are just a reflection of overseas research results or design standards without alterations. Therefore, it is necessary to develop an equation of the live load distribution factors fit for the design conditions of Korea, considering the standardized section of standard PSC I-girder bridges and the design strength of concrete. In this study, to develop an equation of the live load distribution factors, a parametric analysis and sensitivity analysis were carried out on the parameters such as width of bridge, span length, girder spacing, width of traffic lane, etc. Then, an equation of live load distribution factors was developed through the multiple linear regression analysis on the results of parametric analysis. When the actual practice engineers design a bridge with the equation of live load distribution factors developed here, they will determine the design of member forces ensuring the appropriate safety rate more easily. Moreover, in the preliminary design, this model is expected to save much time for the repetitive design to improve the structural efficiency of PSC I-girder bridges.

  • PDF

Study on BESS Charging and Discharging Scheduling Using Particle Swarm Optimization (입자 군집 최적화를 이용한 전지전력저장시스템의 충·방전 운전계획에 관한 연구)

  • Park, Hyang-A;Kim, Seul-Ki;Kim, Eung-Sang;Yu, Jung-Won;Kim, Sung-Shin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.4
    • /
    • pp.547-554
    • /
    • 2016
  • Analyze the customer daily load patterns, be used to determine the optimal charging and discharging schedule which can minimize the electrical charges through the battery energy storage system(BESS) installed in consumers is an object of this paper. BESS, which analyzes the load characteristics of customer and reduce the peak load, is essential for optimal charging and discharging scheduling to save electricity charges. This thesis proposes optimal charging and discharging scheduling method, using particle swarm optimization (PSO) and penalty function method, of BESS for reducing energy charge. Since PSO is a global optimization algorithm, best charging and discharging scheduling can be found effectively. In addition, penalty function method was combined with PSO in order to handle many constraint conditions. After analysing the load patterns of target BESS, PSO based on penalty function method was applied to get optimal charging and discharging schedule.