• Title/Summary/Keyword: Link error model

Search Result 127, Processing Time 0.027 seconds

Developing the Traffic Accident Models of Arterial Link Sections by Driving Type (운전 유형에 따른 가로구간 사고모형 개발)

  • Kim, Kyung-Hwan;Park, Byung-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.197-202
    • /
    • 2010
  • This study deals with the accident models of arterial link sections by driving type. The objectives is to develop models by driving type using the accident data of 24 arterial links in Cheong-ju. In pursuing the above, this study gives particular emphasis to modeling such the accidents as the straight, lane change and others. The main results analyzed are as follows. First, the number of accidents is analyzed to account for about 59% in straight, 31% in lane change and 10% in others. Second, the number of left-turn lane as common variables, and the ADT, number of pedestrian crossings, connecting roads and link length as specific variables are selected in developing models(number of accident and EPDO). Third, 8 models which are all statistically significant are developed. Finally, RMSE of the driving type models was analyzed to be better than that of dummy variable.

Performance evaluation of telecommunication protocols using stochastic petri nets reward model (Stochastic Petri Nets Reward Model을 이용한 통신 프로토콜의 성능평가)

  • 로철우;장직현
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.32A no.4
    • /
    • pp.1-14
    • /
    • 1995
  • A new stochastic Petri nets model, called Stochastic Petri Nets Reward Model(SPNRM) is used for modeling and evaluating the performance of telecommunication protocols. We have developed a SPNRM of the TDX-10 Internal protocol, which has a packet data exchange facility between DCEs, Especially a timer and retransmission handling model is presented for error control of the data transmission phase. The stochastic Petri nets package(SPNP), a software package for SPNRM used in this paper, has been used to generate numerical results by analytical-numerical method rather than simulation. From the steady state solution of the net, it is possible to calculate automatically the performance measure of the protocol medeled with both end-to-end and link-by-link method, which are the mean response times and the throughputs.

  • PDF

Velocity and Acceleration Error Analysis of Planar Mechanism Due to Tolerances (기계시스템의 공차에 의한 속도 및 가속도 오차의 해석)

  • 이세정
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.18 no.2
    • /
    • pp.351-358
    • /
    • 1994
  • A probabilistic model and analysis methods to determine the means and variances of the velocity and acceleration in stochastically-defined planar pin jointed kinematic chains are presented. The presented model considers the effect of tolerances on link length and radial clearance and uncertainty of pin location as a net effect on the link's effective length. The determination of the mean values and variances of the output variables requires the calculation of sensitivities of secondary variables with respect to the random variables. It is shown that this computation is straightforward and can be accomplished by a conventional kinematic analysis package with minor modification. Thus, the concepts of tolerance and clearance have been captured by the model and analysis. The only input data are the nominal linkage model and statistical information. The "effective link length" model is shown to be applicable to both analytical solution and Monte Carlo simulation. The results from both methods are compared. This paper Ksolves the higher-order kinematic problems for the probabilistic design analysis of stochastically-defined mechanisms.echanisms.

The Control of a Bipedal Robot using ANFIS (ANFIS를 이용한 이족보행로봇 제어)

  • Hwang, Jae-Pil;Kim, Eun-Tai;Park, Mignon
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.523-525
    • /
    • 2004
  • Over the last few years, the control of bipedal robot has been considered a promising research field in the community of robotics. But the problems we encounter make the control of a bipedal robot a hard task. The complicated link connection of the bipedal robot makes it impossible to achieve its exact model. In addition, the joint velocity is needed to accomplish good control performance. In this paper a control method using ANFIS as an system approximator is purposed. First a model biped robot of a biped robot with switching leg influence is presented. Unlike classical method, ANFIS approximation error estimator is inserted in the system for tuning the ANFIS. In the entire system, only ANFIS is used to approximate the uncertain system. ANFIS tuning rule is given combining the observation error, control error and ANFIS approximation error. But this needs velocity information which is not available. So a practical method is newly presented. Finally, computer simulation results is presented to show this control method has good position tracking performance and robustness without need for leg switching acknowledgement.

  • PDF

Development of Three D.O.F Alignment Stage for Vacuum Environment (진공용 3자유도 얼라인먼트 스테이지 개발)

  • Han, Sang-Jin;Park, Jong-Ho;Park, Hui-Jae
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.11
    • /
    • pp.138-147
    • /
    • 2001
  • Alignment systems are frequently used under various semiconductor manufacturing environment. Particularly in PDP(Plasma Display Panel) manufacturing process, the alignment system is applied to the combining and sealing processes of the upper and lower glass panels of PDP, where these processes are performed in the vacuum chamber of high vacuum and high temperature. In this paper, the XYΘ-alignment stage is developed to align PDP panels. Because of high vacuum and high temperature environment, the alignment chamber has been designed to isolate the inner part of the alignment chamber from the outer environment of high vacuum and high temperature, in which every part of the alignment stage is inserted. As it is difficult to attach feedback sensors to the alignment stage in the alignment chamber, the alignment stage is implemented with the open loop algorithm, where the parallel link structure has been designed using step-motors and ball-screws for structural simplicity. The kinematic analysis is performed to drive the parallel link structure, based on the experiments of actuation-compensation of the alignment stage. For the error compensation, the hyperpatch model has been used to model the errors. From the experiments, the positional accuracy of the alignment stage can be improved significantly.

  • PDF

Fault Tolerant Control of DC-Link Voltage Sensor for Three-Phase AC/DC/AC PWM Converters

  • Kim, Soo-Cheol;Nguyen, Thanh Hai;Lee, Dong-Choon;Lee, Kyo-Beum;Kim, Jang-Mok
    • Journal of Power Electronics
    • /
    • v.14 no.4
    • /
    • pp.695-703
    • /
    • 2014
  • In this paper, a fault detection scheme for DC-link voltage sensor and its fault tolerant control strategy for three-phase AC/DC/AC PWM converters are proposed, where the Luenberger observer is applied to estimate the DC-link voltage. The Luenberger observer is based on a converter model, which is derived from the voltage equations of a grid-side converter and the power balance on a DC link. A fault of the voltage sensor is detected by comparing the measured value of the DC-link voltage with the estimated one. When a sensor fault is detected, a fault tolerant control strategy is performed, where the estimated DC-link voltage is used for the feedback control. The estimation error from the observer is about 1.5 V, which is sufficiently accurate for feedback control. In addition, it is shown that the observer performance is robust to parameter variations of the converter. The validity of the proposed method has been verified by simulation and experimental results.

A New Technique for Localization Using the Nearest Anchor-Centroid Pair Based on LQI Sphere in WSN

  • Subedi, Sagun;Lee, Sangil
    • Journal of information and communication convergence engineering
    • /
    • v.16 no.1
    • /
    • pp.6-11
    • /
    • 2018
  • It is important to find the random estimation points in wireless sensor network. A link quality indicator (LQI) is part of a network management service that is suitable for a ZigBee network and can be used for localization. The current quality of the received signal is referred as LQI. It is a technique to demodulate the received signal by accumulating the magnitude of the error between ideal constellations and the received signal. This proposed model accepts any number of random estimation point in the network and calculated its nearest anchor centroid node pair. Coordinates of the LQI sphere are calculated from the pair and are added iteratively to the initially estimated point. With the help of the LQI and weighted centroid localization, the proposed system finds the position of target node more accurately than the existing system by solving the problems related to higher error in terms of the distance and the deployment of nodes.

Aeronautical to Ground Channel Modeling for Common Data Link (공용데이터링크를 위한 공대지 채널 모델링)

  • Park, Hongseok;Shim, Jae-Nam;Kim, Donghyun;Kim, Dong Ku
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.12
    • /
    • pp.1876-1883
    • /
    • 2016
  • The new channel model for high data rate common data link(CDL) is proposed. The Two-ray channel, which is composed of the reflected signals on the front ground of the receiver, is considered in this paper. This channel arises due to the curvature of the earth when the altitude of the transmitter is tens of kilometers and distance between the transmitter and the receiver is hundreds of kilometers. The Two-ray channel is modeled by estimating the maximum delay profile and the power delay profile, depending on the transmitting and receiving beamforming angle and the radiation pattern of antenna. The power delay profile has a larger effect on the bit error rate(BER) over signal to noise ratio(SNR) than the maximum delay profile, because the distance range is too long in the proposed channel model.

Efficient Link Adaptation Scheme using Precoding for LTE-Advanced Uplink MIMO (LTE-Advanced에서 프리코딩에 의한 효율적인 상향링크 적응 방식)

  • Park, Ok-Sun;Ahn, Jae-Min
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.2B
    • /
    • pp.159-167
    • /
    • 2011
  • LTE-Advanced system requires uplink multi-antenna transmission in order to achieve the peak spectral efficiency of 15bps/Hz. In this paper, the uplink MIMO system model for the LTE-Advanced is proposed and an efficient link adaptation shceme using precoding is considered providing error rate reduction and system capacity enhancement. In particular, the proposed scheme determines a transmission rank by selecting the optimal wideband precoding matrix, which is based on the derived signal-to-interference and noise ratio (SINR) for the minimum mean squared error (MMSE) receivers of $2{\times}4$ multiple input multiple output (MIMO). The proposed scheme is verified by simulation with a practical MIMO channel model. The simulation results of average block-error-rate(BLER) reflect that the gain due to the proposed rank adapted transmission over full-rank transmission is evident particularly in the case of lower modulation and coding scheme (MCS) and high mobility, which means the severe channel fading environment.

Condition Monitoring of Link Driving System with Clearance (간극이 있는 링크구동계의 상태진단)

  • 최연선;민선환
    • Journal of KSNVE
    • /
    • v.11 no.1
    • /
    • pp.125-131
    • /
    • 2001
  • There is a clearance between the parts of a machine due to design tolerance, manufacturing error, wear, looseness, or misalignment. If the clearance is large, the vibration and noise of the machine is generally large. Therefore, the analysis on the nitration and noise of a machine can tell the clearance of the machine, which reveals the condition of the machine, i.e., the existence of faults and the safety of the machine. The investigation of this kind of research should be on the basis of experimental results. A link mechanism with a clearance at a joint between the coupler and locker is made for the investigation of the condition monitoring of a machine due to clearance. The vibration and sound are measured from the link driving system during the operation. The signals are clarified using line enhancement technique. The noise removed signals are used to develop the dynamic model of the system for a model based fault diagnosis. Also this study showed that the clarified signals can be used for the calculation of the joint forces between the coupler and rocker and for the correlation between the vibration and sound levels and the clearance sizes.

  • PDF