• Title/Summary/Keyword: Lining method

Search Result 391, Processing Time 0.026 seconds

Fracture behaviors of tunnel lining caused by multi-factors: A case study

  • Zhao, Yiding;Zhang, Yongxing;Yang, Junsheng
    • Advances in concrete construction
    • /
    • v.8 no.4
    • /
    • pp.269-276
    • /
    • 2019
  • The cracking and spalling caused by fracture of concrete lining have adverse impacts on serviceability and durability of the tunnel, and the subsequent maintenance work for damaged structure needs to be specific to the damaging causes. In this paper, a particular case study of an operational tunnel structure is presented for the serious cracking and spalling behaviours of concrete lining, focusing on the multi-factors inducing lining failure. An integrated field investigation is implemented to characterize the spatial distribution of damages and detailed site situations. According to results of nondestructive inspection, insufficient lining thickness and cavity behind lining are the coupled-inducement of lining failure bahaviors. To further understanding of the lining structure performance influenced by these multiple construction deficiencies, a reliable numerical simulation based on extended finite element method (XFEM) is performed by using the finite element software. The numerical model with 112 m longitudinal calculation, 100 m vertical calculation and 43 m vertical depth, and the concrete lining with 1450 solid elements are set enrichment shape function for the aim of simulating cracking behavior. The numerical simulation responses are essentially in accordance with the actual lining damaging forms, especially including a complete evolutionary process of lining spalling. This work demonstrates that the serious lining damaging behaviors are directly caused by a combination of insufficient thickness lining and cavity around the surrounding rocks. Ultimately, specific maintenance work is design based on the construction deficiencies, and that is confirmed as an efficient, time-saving and safe maintenance method in the operational railway tunnel.

Improvement of Concrete Lining Construction Method in Large Section Tunnel (대단면 터널 라이닝 콘크리트 타설 기법 개선에 관한 연구)

  • Kim, Sang-Whang;Ra, Kyong-woong;Koh, Sung-Yil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.77-86
    • /
    • 2006
  • Although the adverse critisism have been continued that the concrete lining need or not, most tunnel engineer agree that the concrete lining needs to increase the tunnel safety To establish the concrete lining's quality improvement method, we grasp the basic problems in lining construction process and propose the lining construction methods to increase the concrete quality This paper present a reason of initial crack occurrence in the large section tunnel (4 lane wide span tunnel), lining and an improved method for crack minimization in construction process. It is also verified verify that the proposed method can give qualified concrete lining by carrying out the concrete injection model test and the numerical analysis of concrete flow.

  • PDF

Structural Analysis of Tunnel Structures by Two and Three Dimensional Modeling (2차원 및 3차원 모델링에 의한 터널구조물의 구조해석)

  • Kim, Rae-Hyun;Chung, Jae-Hoon;Yhim, Sung-Soon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.97-102
    • /
    • 2002
  • Two dimensional Analysis has been applied to most of tunnel lining design in these days. Two dimensional analysis uses beam or curved beam element for finite element method. But because the behaviors of tunnel concrete lining structure is near to shell, it is required to model the tunnel lining as shell structure for safety design of tunnel lining structure. In this paper, two dimensional analysis by beam element and the three dimensional analysis by shell element of tunnel concrete lining are studied, in which 3 type of tunnel lining and lateral pressure factors are considered. As results of the study, three dimensional analyses of the behavior of tunnel concrete lining structure considering lateral pressure factor shows that the moment of three dimensional analysis is greater than those of two dimensional analysis. The results shows that three dimensional analysis is necessary for safety design of tunnel lining.

A Method of Tunnel Analysis for Automatic Concrete Lining Construction Method (자동 터널라이닝 공법에 대한 해석기법)

  • 정한중;강석화;장성욱;이승욱
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1993.10a
    • /
    • pp.32-37
    • /
    • 1993
  • A method of tunnel analysis for a new type of tunnel construction method (ACLCM, Automatic Concrete Lining Construction Method) is presented here. ACLCM is an unique tunnel construction method which provides concrete lining at the end of shield machine by extruding concrete into the space between the excavated ground surface and the inner form (Automatic Concrete Lining Machine). Since behaviors of tunnel and the surrounding soils are greatly influenced by the construction method, existing tunnel design methods may not be applicable to the design of ACLCM tunnel. In this study, a method of ACLCM tunnel analysis is suggested to provide the prediction of behavior of ACLCM tunnel and surrounding soils as well as to check up the safety during the construction and after the completion of ACLCM tunnel

  • PDF

A Study for Concrete Crack Minimize Methods in Large Section Tunnel Lining (라이닝 시공특성을 고려한 대단면 4차로 터널 균열최소화 방안에 대한 연구)

  • Choo, Seok-Yeon;Lee, Jae-Sung;Koh, Sung-Yil;Kim, Sang-Whang;Ra, Kyong-Woong;Kim, Tae-Hyok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.621-628
    • /
    • 2005
  • The concrete lining in tunnel performs structural and nonstructural functions. The concrete lining works as a structural member for released load and residual water pressure in NATM tunnel system. Also concrete lining used for finishing the tunnel surface. The initial crack of concrete lining is reported because of difficulties in construction process, which concrete is injected into 30$\sim$40cm narrow gap between lining form and tunnel surface through 500${\times}$600mm small injection holes in the form. In this paper, we research a reason of initial crack occurrence by the case study of 4 lane wide span tunnel, and propose an improved method for crack minimization in construction process. We verify that the proposed method can give qualified concrete lining by carrying out the concrete injection model test and the numerical analysis of concrete flow.

  • PDF

Case Studies of Automatic Measurement and strength for Damage in the Public Tunnel (공용중인 터널의 변상에 대한 보강 및 자동화계측 사례)

  • Han Ja-Jung;Kim Young-Ho;Jang Gi-Soo;Kweon Young-Jung;Ahn Sang-Ro
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.270-281
    • /
    • 2005
  • An especial attention for old tunnel safety is required on increasing of The various tunnel recently. Specially, the lining investigation method of the old tunnel will be able to presume condition of concrete lining indirectly. Because it is many restriction thought of environment and ground condition investigation method of tunnel lining rear. This study carried out section & convergence measurement of part which was deformed in tunnel lining. It had been observed for the change of tunnel behavior with a continuous measurement. It has been analyzed for a cause of tunnel deformation and inspected for the effect after a repair-reinforcement to tunnel compared with the effect before those by structure analysis. By establishing automatic measurement system after repair-reinforcement to tunnel, it would be accomplished to convergence measurement continually. As a result, it was observed that deflection and deformation of tunnel was convergent. but it should be followed to a continuous maintenance because of unstable ground condition, cause of inner tunnel, environment. The railroad tunnel which was executed a reinforcement of the tunnel lining must investigate the close condition of reinforcement lining and concrete lining.

  • PDF

A Back Analysis Study for the Assessment of Tunnel Lining Safety Using Numerical Analysis Model (수치해석 기법을 이용한 터널 라이닝 안전성 평가에 관한 역해석 연구)

  • 박치현;김창용;이희근
    • Tunnel and Underground Space
    • /
    • v.9 no.4
    • /
    • pp.296-305
    • /
    • 1999
  • In ordinary back analysis it if hardly possible to obtain the mechanical properties of tunnel lining by using commonly measured displacements of tunnel lining, because only a few displacements could be measured at the site. Therefore, it is necessary to develop a new method which can evaluate the state of stresses of tunnel by using measured data. In this study, in order to assess tunnel lining stability by estimating its stresses with a few measured displacements, a formulation of back analysis method was proposed. The accuracy of results were investigated through the parametric study for several types of measurement model of two dimensional elastic lining. This new back analysis method to assess tunnel lining stresses and strains with a few numbers of measured displacements showed high accuracy and good applicability when compared to the results of numerical experiments by FEM. The method has been tested on subway tunnel and its applicability has been confirmed by comparing field and analytical data. It is verified that the stress on the tunnel lining can be obtained by only more than 3 point of input displacements without any condition of external loads.

  • PDF

Assessment of Concrete Lining Using Fuzzy Theory (퍼지 이론을 이용한 터널 콘크리트 라이닝의 상태평가)

  • 이광호;배규진;이석원;이성원;조만섭
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.153-160
    • /
    • 1999
  • It has been recognized that the assessment of concrete lining is very uncertain and subjective depending on the engineers who are in charge. T-FLAS which was based on fuzzy theory was developed in this study for the quantitative and objective assessment of the concrete lining in tunnels. Based on the application of T-FLAS on the evaluated field data, it was shown that the assessment system using fuzzy theory(T-FLAS) can be the effective and objective method for the assessment of concrete lining.

  • PDF

Deformation of segment lining and behavior characteristics of inner steel lining under external loads (외부 하중에 따른 세그먼트 라이닝 변형과 보강용 내부 강재 라이닝의 거동 특성)

  • Gyeong-Ju Yi;Ki-Il Song
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.255-280
    • /
    • 2024
  • If there are concerns about the stability of segment lining due to section deficiency or large deformation in shield TBM tunnel, reinforcement can be done through ground grouting outside the tunnel or by using steel plate reinforcement, ring beam reinforcement, or inner double layer lining inside the tunnel. Traditional analyses of shield TBM tunnels have been conducted using a continuum method that does not consider the segmented nature of segment lining. This study investigates the reinforcement mechanism for double layer reinforced sections with internal steel linings. By improving the modeling of segment lining, this study applies Break-joint mode (BJM), which considers the segmented characteristics of segment lining, to analyze the deformation characteristics of double layer reinforced sections. The results indicate that the existing concrete segment lining functioned similarly to ground reinforcement around the tunnel, rather than distribution the load. In general, both the BJM model considering the segmentation of segment lining and the continuum rigid method were similar deformation shapes and stress distributions of the lining under load. However, in terms of deformation, when the load strength exceeded the threshold, the deformation patterns of the two models differed.

A Study on the Lining Pattern Making Method of Pants Made of Stretchable Fabrics (의류업체의 신축성 소재 바지 안감 설계 실태 조사)

  • Lee, Mi-Sook;Suh, Mi-A
    • The Research Journal of the Costume Culture
    • /
    • v.16 no.1
    • /
    • pp.48-57
    • /
    • 2008
  • The purpose of this study was to examine the inconvenience when putting on stretchable pants and to analyze the whole actual conditions of making of the lining fabrics. For this study, we conducted a survey of women in their twenties and collected the basic data and master pattern through material of a woman's wear brand and the interview and questionnaires. The results of this study were as follows. First, the survey result for the woman consumers it showed that the most uncomfortable problem about the lining of pants was not sufficient stretch as much as the out-shell. Secondly, it was shown that many brands(46.7%) were using the lining fabrics of stretch clothes mixed with 'non-stretch fabrics' and 'stretch fabrics'. The result of lining pattern making for the stretch pants showed that the ease of the lining fabrics was 0 to 4cm in the hip girth more than out-shell. The ease in crotch width was 0 to 1.3cm for lining fabrics. But in the stretch lining fabrics the ease for front crotch width was 0 to 1cm more than out-shell. The lengths of crotch rising were -0.7 to 1.3cm for the non-stretch lining fabrics and -1 to 1cm for the stretch lining fabrics.

  • PDF