초고층 건축공사의 작업원 양중시간 단축을 위한 리프트 카 운행제어 모델 (Operation Control Model of Lift Car to Reduce Worker Lifting Time in Tall Building Construction)

  • 남철우;권재범;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.160-161
    • /
    • 2016
  • In tall building construction, lift car for worker lifting is a critical factor for construction productivity. To reduce worker lifting time, existing researches have been conducted on lift car planning. While, research on lift car operation is insufficient. For the efficient reduction of worker lifting time, lift car operation control is needed with lift car planning. Therefore, this research suggests operation control model of lift car to reduce worker lifting time. According to the result of a model test, the operation control model contributes to reasonable reduction of worker lifting time.

  • PDF

마감공사 생산성 향상을 위한 리프트 카 최적배치 모델 (Optimum Layout Model of Lift Car for Improving Productivity in High-rise Building Exterior Finishing Work)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2013
  • An operation planning of lift car is crucial in tall building construction especially it's arrangement plans, because it is related with transportation distance of finishing materials affecting construction productivity. Since tall building construction, composed of complicating and huge plane have complex traffic lines of finishing materials, to determine the position of lift car empirically or intuitively has limits. Therefore this paper suggest an optimum layout model of lift car minimizing the transportation distance both at site-level and floor-level using Graph theory and Dijkstra algorithm.

  • PDF

Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발 (Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building)

  • 신중환;권순욱
    • 한국건설관리학회논문집
    • /
    • 제14권5호
    • /
    • pp.153-163
    • /
    • 2013
  • 건축물이 고층화, 대형화 될수록 수직 양중 계획 및 운영에 관한 중요성이 부각되고 있다. 이에 프로젝트 초기 단계에 실제 모델과 유사한 건설용 리프트 양중계획을 수립하려는 노력이 계속되고 있지만 프로젝트 착수 후 리프트 운행을 컨트롤 할 수 있는 시스템은 부재한 실정이다. 따라서 본 논문에서는 건설용 리프트 운영 효율증대를 위하여 센서를 사용한 리프트 운행 정보를 수집하고 실시간 분석이 가능한 건설용 리프트 최적화 운행 시스템 개발을 실시 및 검증 단계를 수행하여, 양중 효율의 지표가 되는 사용자 대기 시간의 단축을 도모하고 향후 무인 스마트 리프트의 초석이 되는 시스템을 제시하고자 한다.

초고층 건축물 리프트카 양중계획수립을 위한 자원기반의 양중부하 산정 모형 (A computation model for Resource-based Lifting loads of the lift-cars for super high-rise buildings)

  • 한충희;이준복;원서경
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.135-143
    • /
    • 2012
  • 초고층 건축물은 일반적 건축물에 비해, 구조, 환경적 분야 뿐 아니라 시공 분야에서도 골조공사와 마감공사의 시공방법, 재료, 공사관리 등에서 차이점이 있다. 특히 초고층 건축물 시공에서 요구되는 다양한 관리기법 중 양중계획 및 관리는 핵심적인 분야이며, 건설공사에 필요한 인원 및 자재와 같은 자원을 리프트카와 같은 양중기계장비를 이용하여 효율적으로 수직이동하여야 한다. 그러나 리프트카의 경우 초기 수립된 계획과 실제 운영에 차이가 발생하는 경우가 많고 이러한 비효율성으로 인해 문제가 발생하는 경우가 많다. 본 연구에서는 양중작업에 사용되는 리프트카를 대상으로 건축마감공사의 자원물량에 근거한 양중부하 산정 방법 및 예측 모델을 제시하고자 한다. 그 결과 리프트카 운행시간 및 사이클타임을 계산하여 총 양중장비 가동시간 및 양중가능 물량을 산출할 수 있을 것이다. 이를 양중장비조합을 위한 의사결정 지원 모델 구축을 위한 연구로 발전시켜 나갈 것이다.