• Title/Summary/Keyword: Lifecycle cost

Search Result 65, Processing Time 0.032 seconds

Facility Asset Management (FAM) Business Function from the Context of Smart Buildings (SBs)

  • Dagem Derese GEBREMICHAEL;Zhenhui JIN;Yunsub LEE;Youngsoo JUNG
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1315-1315
    • /
    • 2024
  • In recent years, the building industry has seen a fundamental transition due to Digitalization Transformation (DX), with the aim of improving efficiency, productivity, sustainability, and cost-effectiveness. In particular, literature has significantly emphasized Smart Buildings (SBs), which are expected to grow in the global marketplace in the coming years. The most noticeable benefits include energy efficiency, increased occupant comfort and productivity, and a reduction in the building's impact on the environment. Most importantly, the shift to SBs has resulted in major changes to how traditional business practices are carried out. The Facility Asset Management (FAM) domain is one key area undergoing considerable changes to meet the needs of managing functional SBs. Despite this shifting landscape, the changes and prospective extensions to the business areas of FAM in the context of SBs remain largely unexplored. Thus, to address this limitation, this paper aims to investigate the potential changes (i.e., either the addition of a new function or the expansion of an existing function) of the FAM domain from the context of SBs. To achieve this objective, • First, based on a generic model of FAM proposed by Jin et al. (2024), a three-level hierarchical classification of FAM business functions for a conventional building is proposed. • Second, the concept of SBs is thoroughly discussed, including its drivers, features, enablers, and improvement areas. • Finally, a new FAM business function for SB is proposed, aligning with the distinct characteristics of SBs. As there are no established functional taxonomies of FAM, the comprehensive breakdown of FAM business functions presented in this study can be used as a standardized functional breakdown of the FAM domain. Moreover, it can also be used to facilitate robust and integrated information management practices throughout the whole lifecycle of SB facilities.

Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry (프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로)

  • Jang, Heeseok;Choi, Sungyong;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

Advanced Optimization of Reliability Based on Cost Factor and Deploying On-Line Safety Instrumented System Supporting Tool (비용 요소에 근거한 신뢰도 최적화 및 On-Line SIS 지원 도구 연구)

  • Lulu, Addis;Park, Myeongnam;Kim, Hyunseung;Shin, Dongil
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.2
    • /
    • pp.32-40
    • /
    • 2017
  • Safety Instrumented Systems (SIS) have wide application area. They are of vital importance at process plants to detect the onset of hazardous events, for instance, a release of some hazardous material, and for mitigating their consequences to humans, material assets, and the environment. The integrated safety systems, where electrical, electronic, and/or programmable electronic (E/E/PE) devices interact with mechanical, pneumatic, and hydraulic systems are governed by international safety standards like IEC 61508. IEC 61508 organises its requirements according to a Safety Life Cycle (SLC). Fulfilling these requirements following the SLC can be complex without the aid of SIS supporting tools. This paper presents simple SIS support tool which can greatly help the user to implement the design phase of the safety lifecycle. This tool is modelled in the form of Android application which can be integrated with a Web-based data reading and modifying system. This tool can reduce the computation time spent on the design phase of the SLC and reduce the possible errors which can arise in the process. In addition, this paper presents an optimization approach to SISs based on cost measures. The multi-objective genetic algorithm has been used for the optimization to search for the best combinations of solutions without enumeration of all the solution space.

Development of Optimal Facility Management (FM) Process Using Spatial-data-based Mean Time Between Failure (MTBF) Analysis (공간정보 기반 MTBF 분석을 활용한 최적의 FM 프로세스 개발)

  • Yoon, Jonghan;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.43-51
    • /
    • 2018
  • Facility Management (FM) phase in building lifecycle management is the most crucial phase concerning building value and life cycle cost management. Nevertheless, systematic and rational FM process is not yet constructed, leading to failure of facility value and cost management from accurate and proactive FM. This is because there has been minimal approach regarding construction of optimal FM process based on rational FM data analysis. The purpose of this study is to provide optimal FM process with quantitative FM data analysis method using spatial data. This study investigated existing FM data structure and derive the limitation of it from both expert interview and practical FM material analysis. As a solution for this limitation, this study provided optimal FM process with MTBF (Mean Time Between Failure), which is quantitative FM data analysis method. The effect of the provided process was validated with a case study. It is expected that this process allows rational and objective FM data analysis, resulting in accurate and proactive FM. And it is expected that it can be used as a useful basic data for developing an effective system for the FM process.

Performance Evaluation of a New Buried Expansion Joint (새로운 매설형 신축이음장치의 성능 평가)

  • Hong, Seong-Hyeop;Park, Sang-Yeol;Jwa, Yong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.12 no.3
    • /
    • pp.27-35
    • /
    • 2010
  • Asphalt Plug Joint(APJ) is an buried expansion joint that enabling the smooth connection of expansion gap and road pavement by filling the gap with bituminous mixture of 20% bitumen and 80% aggregate by weight, so it secures evenness and expansion or contraction using the material's properties. Although APJ is designed to have a 6-7 year lifecycle, there are some cases where it is damaged within the first six months. This early damage cause traffic congestion due to frequent repair works, and social cost exceeding the installation cost of the joint. So, in this research, we have developed a new system of Buried Folding Lattice Joint(BFLJ) which can overcome the disadvantages of APJ, and have analyzed and compared it's performance with the conventional APJ through experiment with specimens. As a result of the experiment, APJ had crack formation on both ends of the gap plate, spreading to the surface of the expansion joint. With this result, we can conclude that the reason for early damage is the tension failure due to the concentration of strain in the asphalt mixture along the end of gap plate and the debonding along the joint section. In contrast, the newly developed BFLJ induced even transformation in the joint by applying moving stud and high performance material, and resolved APJ's disadvantage of strain concentration. Therefore, it could be seen that the newly developed BFLJ could overcome the disadvantages of APJ and prevent early damage.

Object Classification List for BIM-based Maintenance Information Modeling in Electrical and Telecommunications Field of Architecture (BIM 기반 유지관리정보 모델링을 위한 객체분류목록 개발 -건축 전기/정보통신 분야를 중심으로-)

  • Song, Jong-Kwan;Cho, Gen-Ha;Won, Ji-Sun;Ju, Ki-Beom;Bea, Si-Hwa
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.3183-3191
    • /
    • 2014
  • It is essential to effectively manage facilities because operating and maintenance cost for them accounts for more than 83% of lifecycle cost. This study developed BIM Object-based classification list to manage information required to operating and maintenance phase of them from design and construction phase. In order to develop this classification list, Construction Information Classification System, Design Criteria for Architectural Electrical Installations, commodity list classification of PPS(Public Procurement Service) were analyzed. and problems for consisting of object classification list were drawn. And each materials is classified that drawings discipline code (KSF 1540:2010 (Principle and criteria for CAD Drawing) was classified as level 1 to cover main areas and construction information classification system was classified as level 2 to cover elements also UNSPSC was classified as level 3 to cover objects for devices and equipments. this classification criteria was given code. This study is expected to be useful to exchange and share information in operating and maintenance phase by offering object point of view classification in design and construction phase. besides, it is looking forward to effective operating and maintenance of facilities by enabling management of devices and equipments by function, space, use.

A Study on the Benefits of PLM system baed on Data Integration and Process Management (PLM 시스템 기반의 데이터통합 및 프로세스관리가 경영성과에 미치는 영향에 관한 연구)

  • Kim, Kap-San;Han, Kyeong-Seok;Huh, Ho-Won
    • Journal of Digital Convergence
    • /
    • v.10 no.6
    • /
    • pp.133-140
    • /
    • 2012
  • This study starts from interests on an endeavor of each economy unit, especially the enterprises, for the survival and sustainability of themselves. Competition, how to get it, maintain it and advance it! Agreeing the perceivedness of industries, scholars and public; what the core competition of manufacturer is an competitiveness of product, this study focuses on the PLM system as the key solution for obtaining the competitiveness of product with reviewing the contents and studies of PLM formulated. PLM is highlighted as the one of top tier ICT solution for the product development domain of manufacturing industry today. First of all, this study deals with the opinion of actual work-site and management of our small&medium business for the benefits of PLM based on product development; the impact on the performances of management, which is the key objective of the existence of enterprises. In conclusion, the answers for these questionnaires shows positive perception of actual work-sites and managers for the PLM system. They agree some useful effects on shortening the term and downsizing the cost of product development due to Data integration and Process management, even if they have not full confidence on the effectiveness of the individual functionality of the PLM system.

Material Life Cycle Assessment of Graphene 2wt% Added to Li1.6Ni0.35Mn0.65O2 Half-Cell (그래핀 2wt%를 첨가한 Li1.6Ni0.35Mn0.65O2 Half-Cell의 물질 전 과정 평가)

  • CHO, KYOUNG-WON;LEE, YOUNG-HWAN;HAN, JEONG-HEUM;YU, JAE-SEON;HONG, TAE-WHAN
    • Journal of Hydrogen and New Energy
    • /
    • v.31 no.1
    • /
    • pp.132-137
    • /
    • 2020
  • Lithium secondary batteries have become an important power source for portable electronic devices such as cellular phones, laptop computers. Presently, commercialized lithium-ion batteries use a LiCoO2 cathode. However, due to the high cost and environmental problems resulting from cobalt, an intensive search for new electrode materials is being actively conducted. Recently, solid solution LiMn1-xNixO2 have become attractive because of high capacity and enhanced safety at high voltages over 4.5 V. The Li1.6Ni0.35Mn0.65O2 compounds were conventionally prepared by a sol-gel method, which can produce the layered Li-Ni-Mn-O compounds with a high homogeneity. And by adding a graphene 2wt% the first charge-discharge voltage profiles was increased over Li1.6Ni0.35Mn0.65O2 compound. Also, the variation s of the discharge capacities with cycling showed a higher capacity retention rater. In this study, material lifecycle evaluation was performed to analyze the environmental impact characteristics of Li1.6Ni0.35Mn0.65O2 & graphene 2wt% half-cell manufacturing process. The software of material life cycle assessment was Gabi. Through this, environmental impact assessment was performed for each process. The environmental loads induced by Li1.6Ni0.35Mn0.65O2 & graphene 2wt% synthesis process were quantified and analyzed, and the results showed that the amount of power had the greatest impact on the environment.

Pattern-Oriented Software Development Process using Incremental Composition for Design Patterns (디자인 패턴의 점진적 통합을 이용한 패턴지향 소프트웨어 개발 방법)

  • Kim, Woon-Yong;Choi, Young-Keun
    • The KIPS Transactions:PartD
    • /
    • v.10D no.5
    • /
    • pp.763-772
    • /
    • 2003
  • Design patterns are known widely by the techniques to improve software qualify. The design patterns are efficient solutions for problems occurring frequently in software development. Recently there are wide researches for design patterns to find them and to verify usability for them. But there are very few researches to define systematic development approaches about constructing application using design patterns. In this paper, we propose an approach for the pattern-oriented software development process using incremental composition for design patterns. For this proposal, first we define a development process using design patterns, propose technique for incremental composition for design patterns and view ports for software in the process. Also we deal with the problem of efficient traceability and maintenance to design patterns in the software system. And we use a feedback framework system as an illustrative example to show how the process can be used to develop the pattern-oriented software. In the development of software, the systematic development approach and usage increase efficiency to develop the system by using design experience and technique early in the development lifecycle. Therefore the system will assure the high stability and reusability and offer the low cost and time for development.

Evaluation Method of Green Construction Technologies Using Integrated LCC and LCA Analysis (LCC-LCA 통합 분석에 의한 친환경 건설기술 평가방법)

  • Kim, Yoon-Duk;Cha, Hee-Sung;Kim, Kyung-Ra;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.91-100
    • /
    • 2011
  • Green technologies of buildings are spreading for saving resource and energy consumption during life cycle of buildings. However, selection of optimized the technologies for applying projects is needed a lot of time and costs. Therefore prioritization is necessary to apply the technologies for buildings. An evaluation of economic value for the technologies is significant for prioritization of the technologies, however, the current evaluation system of economic value for technologies is not reflected the accurate features of the technologies. Green technologies have the objectives for reducing the emission of CO2 and saving the cost during the whole lifecycle of buildings. Thus the evaluation of economic feasibility for green technologies is needed to include the economic value from improving the environment. This paper developed the economic evaluation method integrated with LCC and LCA to accurately analyze the economic value for green technologies. Moreover, this paper drew the priority of the technologies by conducting case studies with the integrated method and analyzing the results with AHP. The conclusion of case studies, Green technologies is worth more if to include the economic value from improving the environment. Then in analysis of priority, Green intelligent component technologies were rated the highest. The conclusion of the study is able to utilize the supporting tool for making decision to select the optimized technologies for the projects and precedence study for developing future research of prioritization for green technologies. The future study for improving the developed method will supplement the various evaluation factors and apply the detailed weight to analyze the priority of green technologies.