• 제목/요약/키워드: Life-cycle cost

검색결과 1,050건 처리시간 0.03초

건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로- (A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing-)

  • 전영진;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.

태양광-풍력 복합발전시스템의 경제적 운용을 위한 최적 용량 산정에 관한 연구 (Estimation of the Optimal Generation Capacity of Solar-Wind Hybrid Power System for Economic Operations)

  • 이승철;문운철;권병국;김종환
    • 조명전기설비학회논문지
    • /
    • 제18권3호
    • /
    • pp.156-162
    • /
    • 2004
  • 본 논문에서는 누진전력요금제도 하에서 주어진 부하에 대해 최적의 계통연계형 태양광-풍력 복합발전시스템 용량을 산정하는 기법에 대하여 논한다 일사량 및 풍속의 확률밀도함수를 이용해 복합발전시스템 발전량의 기대치를 구하고, 총수명가 분석법에 기초하여 월별 발전단가를 산정하는 기법과 함께 월사용전력량이 증가함에 따라 전력요금이 급속히 증가하는 누진전력요금구조 하에서 전체 월 전력비용을 최소로 하기 위한 설비용량산정기법에 대하여 논한다. 제안한 기법의 적용가능성을 검토하기 위하여 실제 수도권의 기상데이터를 근거로 하여 본 대학에 설치된 prototype 복합발전시스템을 이용하여 실증연구를 수행하였다.

VVVF 도시철도 차량의 신뢰성 평가 시스템 개발에 관한 연구 (A Study on Development of the Reliability Evaluation System for VVVF Urban Transit)

  • 배철호;김성빈;이호용;장석화;서명원
    • 한국자동차공학회논문집
    • /
    • 제13권5호
    • /
    • pp.7-18
    • /
    • 2005
  • Over the past twenty years, the maintenance system has been developed and its importance has been increased. For the effective maintenance of the urban transit, we have developed the maintenance system based on the concept of RCM(Reliability Centered Maintenance). RCM analysis is a systematic approach to developing a cost-effective maintenance strategy based on the various components's reliability of the system in question. It is performed according to process that includes the following steps; definition of function and functional failures of the systems, construction of RB D(Reliability Block Diagram), performance of FMEA(Failure Modes & Effects Analysis) and calculation of the reliability index. The final process of RCM is to determine appropriate failure maintenance strategies. This paper aims to define the procedure of maintenace based on the concept of RCM for urban transit. The key for a successful maintenance system is an automated scheduling to the maximum extent possible and timely executions. The developed system issues maintenance plan and repair request based on analyzed data and maintenance experience.

국내 전력거래제도하에서 IGCC 사업성 확보를 위한 정책 제언 (A Study on the Feasibility of IGCC under the Korean Electricity Market)

  • 고경호
    • 한국수소및신에너지학회논문집
    • /
    • 제22권1호
    • /
    • pp.118-127
    • /
    • 2011
  • An IGCC was evaluated as one of the next generation technologies that would be able to substitute for coal-fired power plants. According to "The 4th Basic Plan of Long-term Electricity Supply & Demand" which is developed by the Electricity Business Acts, the first IGCC will be operated at 2015. Like other new and renewable energy such as solar PV, Fuel cell, The IGCC is considered as non-competitive generation technology because it is not maturity technology. Before the commercial operation of an IGCC in our electricity market, its economic feasibility under the Korean electricity market, which is cost-based trading system, is studied to find out institutional support system. The results of feasibility summarized that under the current electricity trading system, if the IGCC is considered like a conventional plant such as nuclear or coal-fired power plants, it will not be expected that its investment will be recouped within life-time. The reason is that the availability of an IGCC will plummet since 2016 when several nuclear and coal-fired power plants will be constructed additionally. To ensure the reasonable return on investment (NPV>0 IRR>Discount rate), the availability of IGCC should be higher than 77%. To do so, the current electricity trading system is amended that the IGCC generator must be considered as renewable generators to set up Price Setting Schedule and it should be considered as pick load generators, not Genco's coal fired-generators, in the Settlement Payment.

건축물 리모델링 프로젝트 사례적용에 의한 시공관리 개선방안 (Improvement of Construction Management for Building Remodeling Projects)

  • 여운용;윤유상;서상욱;임병욱
    • 한국건설관리학회논문집
    • /
    • 제5권4호
    • /
    • pp.122-129
    • /
    • 2004
  • 현재 대부분의 리모델링 현장은 시설에 대한 사전정보부족, 공간적인 제약과 같은 예상치 못한 현장조건. 작업범위의 변경 등으로 인해 촉박한 공사기간으로 추진되고 있으며, 이는 조악한 품질의 원인이 되고 있다. 또한 다소 복잡한 작업체계를 가지고 있어 기존시설의 운영일정과 공사일정과의 충돌로 인한 갑작스런 작업대기시간의 발생 등 효율적인 공정관리에도 많은 어려움이 뒤따른다. 따라서 본 연구에서는 실제 리모델링 사례를 통하여 현장관리 절차 및 사례현장에서 나타난 시공관리상 문제점의 개선과정을 통해 리모델링 공사현장의 효율적 관리방안을 제시하는 것을 목적으로 하였다. 관리방안의 수립을 위해 문헌을 통하여 관리상의 문제점을 도출하였고, 사례분석을 통해 공사단계별 현장관리절차, 관리사항을 파악하여 관리상 성공요인을 도출하고, 향후 리모델링 현장에서의 효율적 관리방안을 제시하였다.

가구의 이동결정에 관한 개념적고찰 (A Conceptual Analysis of Household Migration Decisions)

  • 김헌민
    • 한국인구학
    • /
    • 제14권1호
    • /
    • pp.26-34
    • /
    • 1991
  • Migration studies that assume that decision making is done on an individual basis is overlooking the importance of the family factor. Considering that must people belong to families, it is more appropriate to view migration decision from the perspective of the family. This study analyzes the household migration decision whereby the alternatives are to stay, 10 undertake family migration or to undertake single migration of a member. In developing a conceptual model of household migration decision, it is assumed that the household's objective is to maximize household income which is a function of individual members' earnings. The benefits and costs of household migration and individual migration are identified and the household chooses the migration strategy that maximizes expected household income. When household members have conflicting earning prospects in the potential destination, the household considers single migration of the member with the best earning potentials. However, lone migration by a household member involves cost of family separation which is both monetary and psychic, and this study shows that lone migration is undertaken only when its net gains to the family are greater than the separation cost of the family. The major benefit of choosing single migration is the retention of home base in the place of origin which can serve as an insurance against the uncertainty of obtaining a job in the destination, the benefit that is unavailable in family migration. The conceptual analysis shows how a household's migration decision would depend on its members' economic roles and prospects in the destination. Besides the economic variables, social and life cycle variables of the family translate into separation costs and benefits of migration. This study indicates that one - earner family in low economic status but with good earning prospects and high separation costs is more likely to choose family migration over single migration.

  • PDF

6kW급 태양열 온수급탕 시스템의 실증실험 및 분석 (제4보 경제성비교 및 경쟁력강화) (Verification Experiment and Analysis for 6kW Solar Water Heating System (Part 4 : Comparing Economics and Raising Competitiveness))

  • 이봉진;강채동;이상렬;홍희기
    • 설비공학논문집
    • /
    • 제17권3호
    • /
    • pp.232-242
    • /
    • 2005
  • It has been recognized that solar water heating systems are economically inferior to conventional gas water-heaters and boilers using light oil as fuel in spite of having practical possibilities among other alternative energy facilities in Korea. The solar system, however, should be revaluated due to the sharp rise of oil prices recently. We have calculated the energy amount and cost through a series of research projects for the system by experiment and simulation, which lead to analyzing reliable life cycle costs. For the economic analysis, the gas water-heater and light oil boiler were taken as base cases while the solar systems implemented with these facilities were compared as alternatives. As a result, the solar system using the light oil as an auxiliary fuel surpassed the light oil boiler in economics. And a $50\%$ government subsidy for the initial cost is needed to maintain competitiveness with the gas hot-water heater. With this support, the simple payback period of the system can approach 12.8 years under $20\%$ additional curtailment of expenditure.

학교시설 임대형민간투자사업(BTL)의 VE.LCC 사례 분석 (VE.LCC Case Analysis on the Build-Transfer-Lease(BTL) Projects of School facility)

  • 이도형;박우진;주국식;조기훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.143-148
    • /
    • 2008
  • 본 연구는 BTL 사업 중 학교시설에 대한 VE LCC를 적용한 결과에 대한 효과를 분석한 것이다. BTL 사업은 민간사업자가 자금을 투자하여 공공시설을 건설 한 후 시설의 소유권을 정부에 이전하는 대신 일정기간동안 시설의 사용 수익권한을 획득하여 그 권한을 정부에 임대하고 그 임대료로 투자비를 회수하는 사업방식이다. 정부는 건설기술관리법 시행령 제 38조의 13 '설계의 경제성 등 검토'를 제정하여 100억 이상의 건설공사에 경제성 검토를 실시하도록 법적으로 제도화하였다. 학교시설 BTL 사업은 2006년부터 시작되었지만, 학교시설 BTL 사업의 특성상 사업실적이 적고, VE 워크샵 수행기간도 짧고, VE 적용 후 데이터베이스 구축이 타 사업에 비하여 적은 실정이다. 따라서 본 연구에서는 최근 학교시설 BTL 사업 설계 VE 사례분석을 통하여 VE LCC의 효과를 분석하고, VE 데이터베이스로 활용하고자 한다.

  • PDF

대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스 (Development Process of Systems Engineering Management Plan(SEMP) for Large-Scale Complex System Programs)

  • 유일상;박영원
    • 산업경영시스템학회지
    • /
    • 제26권4호
    • /
    • pp.82-90
    • /
    • 2003
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.

메뉴 상품 마케팅 전략방안에 관한 연구 (A Study of Strategy plan for the Improvement on menu marketing Commoditization.)

  • 김장익;홍철희
    • 한국조리학회지
    • /
    • 제4권
    • /
    • pp.347-367
    • /
    • 1998
  • It is difficult to make which customers want in restaurant industry because of IMF situation. Therefore, utilization of service marketing is needed by best effect through least investment in restaurant industry. The background of restaurant industry is not directly related to the improvement of tourism industry. We should give a hand to tourism and restaurant industry by holding international events. so the way of thinking among people is changing. And importing of famous foreign brand and opening shops are accellerating the improvement of tourism and restaurant industry. In this perspective, improvement factors of restaurant industry are as follows : the increase of pst time, the increase of disposable income, the increase of woman's having jobs and double income, requirement of people about health food, the increase of nuclear family, and the change of viewpoint among people. This restaurant industry is service industry, and it sells invisible service except the aspect of selling menu. In addition, in terms of menu, price reduction strategy should be done by cost reduction and restructuring. The ultimate purpose of marketing is to increase sales and to do this we should increase the number of customers in shops. That means we should create new customers and try to attract customers who used to be regular in the shops. Therefore, the demonstration of management ability and positive reaction is really needed. So the most important things in marketing are as follows: proper strategy for double consumption, increasing the number of customers through new specific menu, menu life cycle according to menu item, menu development by considering customer, making recipe, enhancement of product quality and cost reduction by customer's opinion. We should concentrate on national menu first, and try to develop menu for international market. It is absolutely needed that we set up the menu product strategy through menu marketing with various products and constant study related to menu marketing is to be done.

  • PDF