• Title/Summary/Keyword: Life-cycle cost

Search Result 1,050, Processing Time 0.028 seconds

Estimation and Adjustment Model Considering Time Value of Money for Long-Term Maintenance Cost of Apartment House (시간적 가치를 고려한 공동주택 장기수선충당금 산정 및 조정 모델)

  • Koo, Seonkeun;Kim, Jonghyeob;Jun, Inyeong;Kim, Yeongjin;Yoon, Yousang;Hyun, Changtaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.12-21
    • /
    • 2017
  • From 1960, the government decided to build apartment houses on a large scale in order to resolve the rising housing problems. However, the maintenance issues that have arisen from the deterioration of housing has not received adequate attention. The policy focuses only on the supply of housing. By passing new laws, the durable period during which buildings allowed reconstruction was increased, and long term maintenance plans were treated as important issues. The government was then obligated to establish certain long term maintenance plans and costs by legislating a Housing Act and requiring it be adjusted every three years. However, when planning long-term repair costs, doing so without considering the time value of money would become a problem. In addition, if differences between the planned repair costs and actual costs occur, it becomes necessary to adjust the long-term repair costs but, as of yet, the criteria to adjust such things does not exist. For these reasons, if there is lack of money to execute large-scale repair work, a building is unlikely to respond to deterioration of housing; on the other hand, an unnecessary reserve or pool of money can lead to conflict among residents. Therefore, this paper will propose estimation and adjustment models considering the time value of money for long term maintenance costs of apartment houses.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

A Study on The Billing System of Late Movers in MMORPG (MMORPG 개발 후발업체의 과금방식에 관한 연구)

  • Lee, Nam-Jae;Seol, Nam-O;Lee, Kwang-Jae
    • Journal of Korea Game Society
    • /
    • v.5 no.2
    • /
    • pp.19-27
    • /
    • 2005
  • The core price policy of on-line game marketing are FPP(Fixed Pre Paid model and PPU(Pay Per Use) model. These two models have been a on-line game company's billing system and a fundamental of MMORPG in Korea. However, they took root billing system only for first movers recently. In now, the market share of several first movers is exceeding 80%, late movers witch have same billing system cannot take part in pair competition. Even though in MMORPG, many games of late movers were favorably noticed by a lot of gamers during Evaluation. Test, a lot of companies are bankrupt before make business. Late Movers declare free game first thing, they maintain their existence and win over customers in on-line game market. And next, they guarantee item selling, give multiple experience value and game money, at last, induce their customers to pay service. As it makes trouble between pay user and free user, and it linked up with the collapse of game contents balance that designed for FPP billing system, And then meet unexpected result which reduction of game life cycle. In this Paper, we classified several contents services based on game contents, and suggested contents premium services which adopted low cost strategy lead to micro payment. we hope it will apply to late movers' new billing system in MMORPG.

  • PDF

Status of Economics Analysis Using LCC in Turn-Key Project : Focus on Landscape Architecture (설계시공일괄발주(턴키) 설계에서 LCC를 활용한 경제성 분석 실태: 조경분야를 중심으로)

  • Yoon, Yong-Han;Kim, Jeong-Ho
    • Journal of Environmental Policy
    • /
    • v.10 no.4
    • /
    • pp.39-59
    • /
    • 2011
  • In this article, I would like to analyze the conditions in applying the LCC method for each construction type by selecting 10 apartment complexes among the Turn-key projects which have been ongoing for the last 5 years. In addition, this article will identify the problems to the application of double landscape architecture and suggest improvement measures. Among the 10 case targets, a total of 151 LCC analyses were conducted, and the average application ratio placing for each construction type was shown in the following order: architecture (34.4%)> electricity (21.2%)>machine (18.5%)>civil engineering (13.2%)>landscape architecture (12.6%). As numbers show, landscape architecture was the lowest. The ratio of LCC reduction amount was shown in the following order: machine (32.1%)> architecture (23.9%)>electricity (23.4%)>civil engineering (17.5%)>landscape architecture (3.1%). The field of landscape architecture had a reduction amount that was about 5 to 6 times lower than civil engineering which had a similar number of LCC analysis cases. The total LCC analysis items of landscape architecture was 19, including 15 double packing material, 1 building covering, 1 grass planting, 1 planting infrastructure, and 1 facility. The following measures were suggested to promote LCC analysis in landscape architecture: first, set an analysis item that considers the construction expense ratio of landscape architecture; second, legal regulation of landscape architecture and expansion of its application; third, prepare VE/LCC standards which are suitable for landscape architecture.

  • PDF

Correction of Latent Errors in Pavement Deterioration Data using Statistical Methods (통계기법을 활용한 포장파손자료의 잠재오차 보정)

  • Han, Daeseok;Do, Myungsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.587-598
    • /
    • 2012
  • Successful implementation of infrastructure asset management system can be started with rich and reliable data. However, measurement errors in the data have always existed in the real world caused for many unknown reasons. It disturbs maintenance activities of agencies, and makes negative effects to reliability of research results on forecasting deterioration process and life cycle cost. Above all, it makes a contradiction that road agencies cannot believe their inspection data surveyed by their hands. It is particularly serious in the road pavement management field. Although road agencies are well recognized the fact, inspecting without measurement error would be a great challenge. Considering the facts, this paper aimed to suggest statistical error processing methods to correct latent error included in pavement surface inspection data. As alternatives, this paper suggested two methods based on probability distribution to consider structure of error and reliability of the data. The suggested methods were empirically tested by using pavement inspection data from Korean National Highway. As the result, this paper confirmed that conventional error processing that just removes only visible errors is not enough to cover uncertainty in pavement deterioration process. The suggested methods would be useful for improving reliability of analysis results required for road infrastructure asset management.

Traffic Demand Forecasting Method for LCCA of Pavement Section (도로포장의 생애주기비용 분석을 위한 장기 교통수요 추정)

  • Do, Myungsik;Kim, Yoonsik;Lee, Sang Hyuk;Han, Daeseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2057-2067
    • /
    • 2013
  • Traffic demand forecasting for pavement management in the present can be estimated using the past trends or subjective judgement of experts instead of objective methods. Also future road plans and local development plans of a target region, for example new road constructions and detour plans cannot be considered for the estimate of future traffic demands. This study, which is the fundamental research for developing objective and accurate decision-making support system of maintenance management for the national highway, proposed the methodology to predict future traffic demands according to 4-step traffic forecasting method using EMME in order to examine significance of future traffic demands affecting pavement deterioration trends and compare existing traffic demand forecasting methods. For the case study, this study conducted the comparison of traffic demand forecasting methods targeting Daejeon Regional Construction and Management Administration. Therefore, this study figured out that the differences of traffic demands and the level of agent costs as well as user costs between existing traffic demand forecasting methods and proposed traffic demand forecasting method with considering future road plans and local development plan.

A Study on Establishing Facility and Asset Information from Construction Phase (유지보수 및 자산관리를 위한 시공단계 정보 활용에 관한 연구)

  • Bae Young-Min;Kwahk Kil-Jong;Kim Soo-Jung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.529-532
    • /
    • 2003
  • Efficiency and efficient management on maintenance/repair/operation (MRO) phase is getting important with advance in technologies and complex functionalities of building and facility. Using software systems as well as advanced hardware systems in MRO area is spreading along with this trend to take advantage of information technology. Information of building and facility for MRO phase is derived from engineering/procurement/construction (EPC) phase. But most current commercial software systems in EPC and MRO are focusing on their own phase, which arise lack of consistency of information from EPC to MRO phase. But, the information system now used at the MRO phase stop flowing the building and the facilities information and then newly create. Moreover, from all asset management point of view, asset particulars such as the structures and equipments are different the value fluctuation. In order to reflect these information rationally, the construction costs are correctly distributed and the initial price of the asset particulars have to be estimated. In this study, develop the information model which can apply the cost information at the EPC phase to the MRO phase.

  • PDF

Economic Evaluation of ATES Heat Pump System (ATES 열펌프 시스템의 경제성 평가)

  • Kim, Namtae;Choi, Jong Min
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.199-199
    • /
    • 2011
  • ATES(Aquifer Thermal Energy Storage) 열펌프 시스템은 기존의 다양한 열원 적용 시스템 대비 효율이 우수한 것으로 알려져 유럽과 미국에서 건물 냉난방 시스템으로 적용되고 있다. 특히, ATES 시스템은 기존의 냉난방 시스템 대비 경제성이 우수한 것으로 알려져 있으나 국내에서는 이에 대한 연구 결과는 전무한 실정이다. 본 연구에서는 ATES 열펌프 시스템의 실증 성능 결과를 분석하였으며, LNG 보일러와 에어컨을 사용하는 기존의 냉난방 시스템을 비교시스템으로 ATES 열펌프 시스템의 경제성 평가를 수행하였다. ATES 시스템의 연간 실증 성능 실험결과 ATES 시스템은 외기온도와 무관하게 연중 안정적인 성능을 나타내었다. 경제성 평가시에 생애주기법(Life Cycle Cost)을 적용하여 ATES 열펌프 시스템의 설치 및 운전에 필요한 총 소요비용을 산정하고, 이 결과를 바탕으로 투자회수기간법을 통해 ATES 시스템의 투자회수 기간을 산정하였다. 생애주기법 적용 시에 현재가치법을 사용하였으며, 현재가치법은 수명주기에 발생하는 모든 투자비용과 절감액을 일정한 시점을 기준으로 등가환산하는 방법을 의미한다. 현재가치법에 사용되는 현재가치는 초기비용과 현재가치계수의 곱으로 나타나는데, 여기에서 현재가치계수는 임의의 이자율로 일정기간 동안 정기적인 할부금액이 적립될 때의 현재금액을 구하기 위해 사용하는 계수를 의미한다. 전기와 LNG는 각각 2009년 7월의 (주)한국전력공사와 (주)한국가스공사의 고시요금을 적용하였다. 본 시스템은 실증 설비용량인 20RT를 대상 건물로 가정하였고, 초기투자비는 크게 공사비와 냉난방 설비 구입비로 구성되어 있으며, 기본적인 물가지표는 (사)한국물가정보(KPI)의 고시 데이터를 참조하였다. 각 시스템의 초기투자비는 ATES 시스템이 비교대상 기존 냉난방 시스템 대비 5.7배 높게 나타났다. 일일 8시간 사용기준으로 계절별 전력요금을 고려한 연간운전 비용은 ATES 시스템이 기존 시스템 대비 냉난방 시에 각각 77%와 16%를 나타내어 운전비용이 연간 절감되었고, 난방 운전 시 절감 비율이 냉방시보다 크게 나타났다. 두 시스템에 대한 생애주기비용을 산정하기 위하여 에어컨과 보일러의 기존시스템과 ATES 시스템의 가용연수를 모두 20년으로 설정하였고, 유지보수 비용은 초기투자비용의 2%로 설정하고, 할인율은 은행 예금이자를 기준으로 5%로 설정하였다. 전기와 LNG의 요금 상승률은 (사)한국물가정보를 바탕으로 각각 2%와 8%로 가정하였다. 이러한 조건에서 생애주기법을 이용한 경제성평가는 ATES 시스템의 경우 생애운전비용이 초기투자비용보다 작게 나타났으며, 기존 냉난방 시스템은 생애운전비용이 초기투자비용에 비하여 높게 나타났다. 본 연구 대상 ATES 열펌프 시스템의 실증 성능 데이터와 기존 문헌으로부터 얻은 냉난방 시스템의 성능 결과를 이용하여 생애주기 비용을 적용한 결과 ATES 시스템의 기존 시스템 대비 투자회수 기간은 6.62년으로 나타났다. 특히, 본 연구에서는 ATES 시스템이 국내 최초로 적용됨에 따라 스크린 등의 부품을 다소 고가의 제품으로 시스템에 적용하였으므로 ATES 시스템의 신뢰성과 안정성이 확보되면 초기 투자비 감소가 가능할 것으로 예상되며, 기존 시스템 대비 투자회수 기간은 더욱 감소될 수 있을 것으로 예상된다.

  • PDF

Population-Based Intervention for Liver Fluke Prevention and Control in Meuang Yang District, Nakhon Ratchasima Province, Thailand

  • Kompor, Pontip;Karn, Rattikarn Muang;Norkaew, Jun;Kujapun, Jirawoot;Photipim, Mali;Ponphimai, Sukanya;Chavengkun, Wasugree;Paew, Somkiat Phong;Kaewpitoon, Soraya;Rujirakul, Ratana;Wakhuwathapong, Parichart;Phatisena, Tanida;Eaksanti, Thawatchai;Joosiri, Apinya;Polsripradistdist, Poowadol;Padchasuwan, Natnapa;Kaewpitoon, Natthawut
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.2
    • /
    • pp.685-689
    • /
    • 2016
  • Opisthorchiasis is still a major health problem in rural communities of Thailand. Infection is associated with cholangiocarcinoma (CCA), which is found frequently in Thailand, particularly in the northeastern. Therefore, this study aimed to evaluate the effectiveness of health intervention in the population at risk for opisthorchiasis and CCA. A quasi-experimental study was conducted in Meuang Yang district, Nakhon Ratchasima province, northeastern Thailand, between June and October 2015. Participants were completed health intervention comprising 4 stations; 1, VDO clip of moving adult worm of liver fluke; 2, poster of life cycle of liver fluke; 3, microscopy with adult and egg liver fluke; and 4, brochure with the knowledge of liver fluke containing infection, signs, symptoms, related disease, diagnosis, treatment, prevention, and control. Pre-and-post-test questionnaires were utilized to collect data from all participants. Students paired t-tests were used to analyze differences between before and after participation in the health intervention. Knowledge (mean difference=-7.48, t=-51.241, 95% CI, -7.77, -7.19, p-value =0.001), attitude (mean difference=-9.07, t=-9.818, 95% CI=-10.9, -7.24, p-value=0.001), and practice (mean difference=-2.04, t=-2.688, 95% CI=-3.55, -0.53, p-value=0.008), changed between before and after time points with statistical significance. Community rules were concluded regarding: (1) cooked cyprinoid fish consumption; (2) stop under cooked cyprinoid fish by household cooker; (3) cooked food consumption; (4) hygienic defecation; (5) corrected knowledge campaign close to each household; (6) organizing a village food safety club; (7) and annual health check including stool examination featuring monitoring by village health volunteers and local public health officers. The results indicates that the present health intervention program was effective and easy to understand, with low cost and taking only a short time. Therefore, this program may useful for further work at community and provincial levels for liver fluke prevention and control.

The Road Subsidence Status and Safety Improvement Plans (도로함몰 실태와 안전관리 개선 방안)

  • Bae, Yoon-Shin;Kim, Kyoon-Tai;Lee, Sang-Yum
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.545-552
    • /
    • 2017
  • Ground subsidence can result in the formation of sinkholes, potholes, settlement of structures, and road subsidence. Road subsidence is described as the sudden collapse of the road surface into subsurface cavities caused by the loss of bearing capacity in the ground, such as the dissolution of limestone by fluid flow in the surface causing the formation of voids leading to subsidence at the surface. Road subsidence occurs about 665 times annually, and this incidence has been increasing until 2013. Damaged underground facilities, management negligence, and lowering of the ground water table have been the causes of road subsidence in Seoul. Seoul metropolitan government announced special management counter plans to relieve the anxieties and make the roads safe for passing. Construction sites, such as excavation works, need to be managed properly because they have strong potential to induce road subsidence. The aim of this study was to identify the main causes of road subsidence and suggest management plans. First, life cycle cost analysis revealed the daytime construction to be more appropriate than nighttime. In addition, by analyzing the limitations of using sand as a backfill material, it is proposed to use a flowable backfill material instead of sand. Finally, to reduce the blind spots, which is a problem in surveying the road pavement conditions of local governments, the road to be managed is divided into several zones, and a specialized agency is selected for each zone and a method of surveying the blind spots through collaboration is suggested.