• Title/Summary/Keyword: Life-cycle cost

Search Result 1,050, Processing Time 0.04 seconds

Economic and Environmental Assessment of a Renewable Stand-Alone Energy Supply System Using Multi-objective Optimization (다목적 최적화 기법을 이용한 신재생에너지 기반 자립 에너지공급 시스템 설계 및 평가)

  • Lee, Dohyun;Han, Seulki;Kim, Jiyong
    • Korean Chemical Engineering Research
    • /
    • v.55 no.3
    • /
    • pp.332-340
    • /
    • 2017
  • This study aims to propose a new optimization-based approach for design and analysis of the stand-alone hybrid energy supply system using renewable energy sources (RES). In the energy supply system, we include multiple energy production technologies such as Photovoltaics (PV), Wind turbine, and fossil-fuel-based AC generator along with different types of energy storage and conversion technologies such as battery and inverter. We then select six different regions of Korea to represent various characteristics of different RES potentials and demand profiles. We finally designed and analyzed the optimal RES stand-alone energy supply system in the selected regions using multiobjective optimization (MOOP) technique, which includes two objective functions: the minimum cost and the minimum $CO_2$ emission. In addition, we discussed the feasibility and expecting benefits of the systems by comparing to conventional systems of Korea. As a result, the region of the highest RES potential showed the possibility to remarkably reduce $CO_2$ emissions compared to the conventional system. Besides, the levelized cost of electricity (LCOE) of the RES-based energy system is identified to be slightly higher than conventional energy system: 0.35 and 0.46 $/kWh, respectively. However, the total life-cycle emission of $CO_2$ ($LCE_{CO2}$) can be reduced up to 470 g$CO_2$/kWh from 490 g$CO_2$/kWh of the conventional systems.

A Study on the Importance and order of priority of the Major control item for DMSMS by using AHP analysis (AHP 분석을 통한 부품단종 주요관리항목 중요도 및 우선순위에 관한 연구)

  • Moon, Jayoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.10
    • /
    • pp.48-54
    • /
    • 2020
  • DMSMS (Diminishing Manufacturing Sources and Material Shortage) is increased by developing the scientific technique and downsizing the military part market. DMSMS affects the increase in total life cycle costs and serviceability. Therefore, advance control for parts is important to reduce the cost, and a database is needed to share information on the DMSMS. A task needs to be performed continuously by setting the major control item to management more efficiently. The purpose of this study was to deduce the major control item for the DMSMS management system. Thus, the pre-control item basis of the DAPA (Defense Acquisition Program Administration) Manual and the SD-22 Manual were first selected, and the results of the survey were analyzed by AHP (Analytic Hierarchy Process) method. Fifteen of the detailed items were stratified into three criteria (Impact, Probability, and cost of the DMSMS), and each weight for the items was calculated using a nine-point scale survey. The AHP survey was executed with 25 specialists in the DMSMS management field, and the score of consistency ratio over 0.1 was excluded. The model explained the results and suggested future directions for development.

Technical Value Model and Evaluation for Smart In-vehicle Network (스마트 차량내(內) 네트워크 기술가치 모델 및 평가)

  • Kim, Byung-Woon
    • Journal of Korea Technology Innovation Society
    • /
    • v.20 no.2
    • /
    • pp.368-386
    • /
    • 2017
  • The purpose of this study is to present the technology value model based on profit approach and IITP practical guide for Ethernet network technology, which is the core technology of autonomous vehicles and connected cars in the hyper-connected industry. In-vehicle network, Ethernet technology, Ethernet port count, port pricing, and application data for technology assessment are sources of global market research organizations. The data on the company's COGS (Cost of Goods Sold), operating capital requirement, capital expenditure, and income statement data are used by the Bank of Korea's Business Analysis Report. According to the results of the study, the product market size was estimated to be US $470.3 billion and the technology market size was $52.1 billion over the seven years of economic life cycle of technology. The market value of the technology was estimated to be $260 million reflecting the possibility of entry into the market. In the case of the corporate management analysis report, the average value of the IITP and the top 25% were $0.7 million and $40.2 million, respectively. -27.8 million, and -73.6 million dollars respectively. This implies that government support for policy support is needed when conducting corporate R&D with high cost-to-sales ratio. The results of this study can be used as a reference for the evaluation of technology demand based ICT R&D technology in the industrial internet market in the fourth industrial revolution era.

Priority Analysis of Project Stage-wise Risk Factors : Focusing on New Product Development Projects in ICT Industry (프로젝트 단계별 리스크 요인들의 우선순위 분석 : ICT(정보통신기술)산업 분야의 신제품 개발 프로젝트를 중심으로)

  • Jang, Heeseok;Choi, Sungyong;Lee, Minho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.72-82
    • /
    • 2018
  • In this paper, we identify risk factors that are likely to occur during the lifecycle of a new product development (NPD) project from the literatures, and identify the three objectives or three constraints that will ultimately be achieved for project success in the ICT industry : performance (scope/quality), schedule (time), and cost. Firstly, we interviewed the project experts to classify the risk factors according that the final project objectives are changeable based on scope/quality, time and cost budget constraints. Secondly, the survey for pairwise comparisons between the risk factors was asked to the project managers and members who had ever actually participated in the NPD projects of ICT industry to determine the priority ranks on relative importance using AHP (Analytic Hierarchy Process). The risk factors negatively affecting the goals of projects were analyzed by using the AHP respectively in four project stages during the life cycle of the project. The comparison of risk factors within each stage is a different approach unlike the literatures which have covered project's overall risk assessment. There is an advantage that risk management can be effectively performed with priorities according to each stage from the start to the end of the project. In other words, it is necessary to identify what risk factors will occur in each stage, and to have ideas at each stage with the priorities so that they can be mitigated and eliminated before actual occurrence. As a result, risks on scope & quality changes were found to be the most important considerations for initiative stage of NPD projects in the ICT industry, whereas in the final stage, risks on schedule (time) changes were the most important priorities. Among the ICT industry product categories, 'communication and broadcasting devices' and 'IT and communication based devices' generally have a high priority in terms of risks on scope & quality changes when initiating the project. At the closing stage of the project, however, considering that schedule (time) changeable risk is getting higher, these products tend to target at B2B market rather than B2C because the new products must be delivered and launched in time as customer firm required.

Development of Optimal Facility Management (FM) Process Using Spatial-data-based Mean Time Between Failure (MTBF) Analysis (공간정보 기반 MTBF 분석을 활용한 최적의 FM 프로세스 개발)

  • Yoon, Jonghan;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.43-51
    • /
    • 2018
  • Facility Management (FM) phase in building lifecycle management is the most crucial phase concerning building value and life cycle cost management. Nevertheless, systematic and rational FM process is not yet constructed, leading to failure of facility value and cost management from accurate and proactive FM. This is because there has been minimal approach regarding construction of optimal FM process based on rational FM data analysis. The purpose of this study is to provide optimal FM process with quantitative FM data analysis method using spatial data. This study investigated existing FM data structure and derive the limitation of it from both expert interview and practical FM material analysis. As a solution for this limitation, this study provided optimal FM process with MTBF (Mean Time Between Failure), which is quantitative FM data analysis method. The effect of the provided process was validated with a case study. It is expected that this process allows rational and objective FM data analysis, resulting in accurate and proactive FM. And it is expected that it can be used as a useful basic data for developing an effective system for the FM process.

Additional CSP calculation method considering Human Error (휴먼에러를 고려한 추가 CSP 산정 방안)

  • Baek, Sung-Il;Ha, Yun-chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.1
    • /
    • pp.759-767
    • /
    • 2021
  • Most weapons systems that are Force Integration are expensive equipment that reflects the latest technology, and the operation and maintenance cost is increasing continuously. Factors that efficiently operate and maintain these weapon systems include maintenance plans, economic costs, and repair part requirements. Among them, predicting the repair parts requirements during the life cycle in advance is an important way to increase operation and maintenance cost efficiency and operating availability. The start of requirement analysis for repair parts is a calculation of the CSP (CSP: Concurrent Spare parts, CSP hereafter) that is distributed when the weapon system is deployed. The CSP is an essential component of achieving the operating availability during this period because the weapon system aims to successfully perform a given operation mission without resupply for an initial set period. In the present study, the CSP calculation method was analyzed, reflecting the failure rate and operating time of items, but the analyzed CSP was aimed at preparing for technical failure, but in the initial operating environment, it is limited in coping with unexpected failures caused by human error. The failure is not included in the scope of free maintenance and is a serious factor in making the weapon system inoperable during the initial operation period. To prevent the inoperable status of a weapon system, CSP that considers human error is required in the initial operating environment, and the calculation criteria and measures are proposed.

Synthesis and Electrochemical Performance of Ni-rich NCM Cathode Materials for Lithium-Ion Batteries (리튬이온전지 양극활물질 Ni-rich NCM의 합성과 전기화학적 특성)

  • Kim, Soo Yeon;Choi, Seung-Hyun;Lee, Eun Joo;Kim, Jeom-Soo
    • Journal of the Korean Electrochemical Society
    • /
    • v.20 no.4
    • /
    • pp.67-74
    • /
    • 2017
  • Layered Ni-rich NCM cathode materials $Li[Ni_xCo_{(1-x)/2}Mn_{(1-x)/2}]O_2$ ($x{\geq}0.6$) have advantages of high energy density and cost competitive over $LiCoO_2$. The discharge capacity of NCM increases proportionally to the Ni contents. However, there is a problem that it is difficult to realize the stable electrochemical performance due to cation mixing. In this study, synthesis conditions for the layered Ni-rich NCMs are investigated to achieve deliver the ones having good electrochemical performances. Synthesis parameters are atmosphere, lithium source, synthesis time, synthesis temperature and Li/M (M=transition metal) ratio. The degree of cation mixing gets worse as the Ni content is increased from $Li[Ni_{0.6}Co_{0.2}Mn_{0.2}]O_2$ (NCM6) to $Li[Ni_{0.8}Co_{0.1}Mn_{0.1}]O_2$ (NCM8). It is confirmed that higher level of cation mixing affects negatively on the electrochemical performance of NCMs. Optimum synthesis conditions are explored for NCMx (x=6, 7, 8) in order to reduce the cation mixing. Under optimized conditions for three representative NCMx, a high initial discharge capacity and a good cycle life are obtained for $180mAh{\cdot}g^{-1}$, 96.2% (50 cycle) in NCM6, $187mAh{\cdot}g^{-1}$, 94.7% (50 cycle) in NCM7, and $201mAh{\cdot}g^{-1}$, 92.7% (50 cycle) in NCM8, respectively.

Effectiveness Analysis and Application of Phosphorescent Pavement Markings for Improving Visibility (축광노면표시 시인성 개선에 따른 경제성 분석 및 적용방안)

  • Yi, Yongju;Lee, Kyujin;Kim, Sangtae;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.5
    • /
    • pp.815-825
    • /
    • 2017
  • Visibility of lane marking is impaired at night or in the rain, which thereby threatens traffic safety. Recently, various studies and technologies have been developed to improve lane marking visibility, such as the extension of lane marking life expectancy (up to 1.5 times), improvement of lane marking equipment productivity, improvement of lane marking visibility by applying phosphorescent material mixed paint. Cost-benefit analysis was performed with considering various benefit items that can be expected. About 45% of traffic accidents would be prevented by improving lane marking visibility. Additionally, accident reduction benefit and traffic congestion reduction benefit were calculated as much as 246 billion KRW per year and 12 billion KRW per year, respectively, by reducing repaint cycle due to enhanced durability. 45 billion KRW per year is expected to reduced with improved lane detection performance of autonomous vehicle. Meanwhile, total increased cost when introducing phosphorescent material mixed paint to 91,195km of nationwide road is identified as 1922 billion KRW per year. However, economic feasibility could not be secured with 0.16 of cost-benefit ratio when applied to the road network as a whole. In case of "Accident Hot Spot" analyzing section window (400m), one or more fatality or two or more injured (one or more injured in case of less than 2 lanes per direction) per year were caused by pavement marking related accident, economic feasibility was secured. In detail, 3.91 of cost-benefit ratio is estimated with comparison of the installation cost for 5,697 of accident hot spot and accident reduction benefit. Some limitations and future research agenda have also been discussed.

Embryo Recovery by Direct Embryo Collection (DEC) in Korean Native Cattle (Hanwoo) (Direct Embryo Collection(DEC)에 의한 한우의 수정란 채란)

  • Yoo, Han-Jun;Lee, Yong-Seung;Park, Joung-Jun;Kim, Ki-Won;Park, Choon-Keun
    • Journal of Embryo Transfer
    • /
    • v.26 no.3
    • /
    • pp.153-158
    • /
    • 2011
  • This study was performed in order to simplify the operation and minimize stress of donor and be readily available in the field with low cost and high quality embryos using the Direct Embryo Collection (DEC). Donors, at random stages of the estrous cycle, received a CIDR. 7 days later, 200 mg FSH was treated with 40, 30, 20, 10 mg FSH levels in declining doses twice daily by intramuscular injection for 4 days. On the 3rd day administration of FSH, 25 mg $PGF_2{\alpha}$ was administered and CIDR was withdrawn. After FSH injections were complete, donors were artificially inseminated twice at 12 hr intervals. The donor cattle received 250 ${\mu}g$ GnRH at time of 1 st insemination and embryos were recovered 8 days after the 1st insemination. Embryo collection from superovulated donors was performed to flushing by non-surgical methods of 3-way, 2-way and DEC (l-way). The average number of recovered embryos were 11.25${\pm}$0.63, 12.5${\pm}$0.65 and 11.75${\pm}$0.48 from operations of 3-way, 2-way and DEC methods, respectively. There were no significant differences among the embryo collection methods. Also, The average number of transferable embryos were 6.25${\pm}$0.48, 7.25${\pm}$0.48 and 7.25${\pm}$0.63 from each embryo collection procedures. The number of transferable embryos was no differences among the 3-way, 2-way and DEC methods, respectively. Meanwhile, the ratio of transferable embryos for all recovered embryos from DEC methods was higher as 61.7 % than 55.6 %, 58 % from methods of 3-way, 2-way. And the flushing solution required for recovering embryos by DEC method was significantly lower as 0.28${\pm}$0.32 1 than 1.8${\pm}$0.12 1, 1.75${\pm}$0.10 1 from 3-way, 2-way methods (p<0.05). Also, the time required for recovering embryos by DEC methods was significantly lower as 27${\pm}$2 min than 51${\pm}$3, 45${\pm}$2 min, respectively (p<0.05). In conclusion, these results suggest that DEC method for embryo collection may be effectively used for production of in vivo embryos using less flushing solution and, it might be effectively available in the field compared to conventional embryo recovery methods using 3-way or 2-way balloon catheter.

Strategy for Development of HSE Management Framework for Offshore CCS Project in Korea (국내 해양 CCS 사업의 HSE 관리 프레임워크 구축 전략)

  • Noh, Hyonjeong;Kang, Kwangu;Kang, Seong-Gil;Lee, Jong-Gap
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.20 no.1
    • /
    • pp.26-36
    • /
    • 2017
  • Korea is preparing an offshore carbon capture, transport and storage (CCS) demonstration project which is recognized as one of important $CO_2$ reduction technologies to mitigate climate change. The offshore CCS project aims to transport, inject and store large amount of $CO_2$ into offshore geologic formation, and has a potential risk of leakage which might cause disastrous damage to human health, environment and property. Therefore, in order to ensure the safety of the offshore CCS project, a strict HSE (health, safety and environment) management plan and its implementation are required throughout the project life cycle. However, there are no HSE domestic laws or regulations applicable to CCS projects, and the related research is insufficient in Korea. For the derivation of the essential and urgent requirement in HSE management framework applicable to the offshore CCS project in Korea, we analysed the HSE management methodologies and foreign CCS HSE management guidelines and cases. First, this paper has analyzed ISO 31000, a generalized risk management principles. Second, we have investigated the HSE management practices of CCS projects in Norway and UK. Based on the analyses, we suggested the necessity of developing the HSE Philosophy and the HSE management process through the whole life cycle. Application of HSE management in early phase of an offshore CCS project will promote systematic and successful project implementation in a cost-effective and safe way.