• Title/Summary/Keyword: Life Design Management Engineering

Search Result 484, Processing Time 0.029 seconds

Design of Accelerated Life Test Plans for the Lognormal Failure Distribution under Intermittent Inspection (대수정규분포와 간헐적 검사하에서 가속수명시험방식의 설계)

  • Seo, Sun-Keun;Cho, Ho-Sung
    • Journal of Korean Society for Quality Management
    • /
    • v.24 no.2
    • /
    • pp.25-43
    • /
    • 1996
  • This paper presents the optimal and practical constant-stress accelerated life test plans for the lognormal lifetime distribution tinder assumptions of intermittent inspection and Type-I censoring. In an optimal plan, the low stress level and the proportions of test units allocated at each stress are determined under given inspection scheme and number of inspections such that the asymptotic variance of the maximum likelihood estimator of a certain quantile at use condition is minimized. Although the practical plan adopts the same design criterion, it involves three rather than two overstress levels in order to compromise the practical deficiencies of the optimal plan. Computational experiments are conducted to choose an allocation plan and a inspection scheme of the practical plan and to compare with test plans over a range of parameter values.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

Maintenance Effect Quantification Mode by Response Surface Method (Response Surface 방법에 의한 보수보강 정량화 모델)

  • Park Seung-Hyuc;Kim Sung-Hoon;Lim Jong-Kwon;Park Kyung-Hoon;Kong Jung-Sik
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.557-564
    • /
    • 2006
  • Life-cycle performance and maintaining cost predictions are required for the effective management for bridges. In Korea, the importance of management of bridges has been recognized over the past two decades, resulting in the development of databases and various bridge management support tools by both government and private sectors. However, none of these tools has truly included the expected features of the bridge management system (EMS) for the next generation such as the quantification of the effects of maintenance interventions on bridge condition and safety. In this paper, a novel quantification process to simulate the life-cycle performance of steel box bridges has been developed. The process is based on the Response Surface method. Various performance-related variables aloe investigated to identify a set of significant design variables to construct the response surfaces.

  • PDF

Sustainable concrete mix design for a target strength and service life

  • Tapali, Julia G.;Demis, Sotiris;Papadakis, Vagelis G.
    • Computers and Concrete
    • /
    • v.12 no.6
    • /
    • pp.755-774
    • /
    • 2013
  • Considering the well known environmental issues of cement manufacturing (direct and indirect levels of $CO_2$ emissions), clinker replacement by supplementary cementing materials (SCM) can be a very promising first step in reducing considerably the associated emissions. However, such a reduction is possible up to a particular level of SCM utilization, influenced by the rate of its pozzolanic reaction. In this study a (4-step) structured methodology is proposed in order to be able to further adjust the concrete mix design of a particular SCM, in achieving additional reduction of the associated levels of $CO_2$ emissions and being at the same time accepted from a derived concrete strength and service life point of view. On this note, the aim of this study is twofold. To evaluate the environmental contribution of each concrete component and to provide the best possible mix design configuration, balanced between the principles of sustainability (low environmental cost) and durability (accepted concrete strength and service life ). It is shown that such a balance can be achieved, by utilising SCM by-products in the concrete mix, reducing in this way the fixed environmental emissions without compromising the long-term safety and durability of the structure.

Efficient Management Design for Swimming Exercise Treatment

  • Kim, Kyung-Hun;Kyung, Tae-Won;Kim, Won-Hyun;Shin, Chung-Sick;Song, Young-Jae;Lee, Moo-Yeol;Lee, Hyun-Woo;Cho, Yong-Chan
    • The Korean Journal of Physiology and Pharmacology
    • /
    • v.13 no.6
    • /
    • pp.497-502
    • /
    • 2009
  • Exercise-mediated physical treatment has attracted much recent interest. In particular, swimming is a representative exercise treatment method recommended for patients experiencing muscular and cardiovascular diseases. The present study sought to design a swimming-based exercise treatment management system. A survey questionnaire was completed by participants to assess the prevalence of muscular and cardiovascular diseases among adult males and females participating in swimming programs at sport centers in metropolitan regions of country. Using the Fuzzy Analytic Hierarchy Process (AHP) technique, weighted values of indices were determined, to maximize participant clarity. A patient management system model was devised using information technology. The favorable results are evidence of the validity of this approach. Additionally, the swimming-based exercise management system can be supplemented together with analyses of weighted values considering connectivity between established indices.

Development of Process Analytical Technology (PAT) for Total Quality Innovation on Pharmaceutical Processes (의약품 제조공정에서의 전사적 품질혁신을 위한 공정분석기술 개발)

  • Shin, Sang-Mun;Park, Kyung-Jin;Choi, Yong-Sun;Lee, Sang-Kil;Choi, Guang-Jin;Kwon, Byung-Soo;Cho, Byung-Rae
    • Journal of Pharmaceutical Investigation
    • /
    • v.37 no.6
    • /
    • pp.329-338
    • /
    • 2007
  • The quality assurance issue of drug products is more important than the general product because it is highly related to the human health and life. In this reason, the regulatory guide lines have continuously been intensified all around the world. In order to achieve effective quality assurance and real-time product release (RTPR) of drug products, process analytical technology (PAT), which can analyze and control a manufacturing process, has been proposed from the United States. With the PAT process, we can obtain significant process features of materials, quality characteristics and product capabilities from a raw material to the final product in the real-time procedure. PAT can also be utilized to process validation using information system that can analyze the risk of drug products through out an entire product life-cycle. In this paper, we first offered a new concept for the off-line process design methods to prepare the improved quality assurance restrictions and a real-time control method by establishing an information system. We also introduced an automatic inspection system by obtaining surrogate variables based on drug product formulations. Finally, we proposed an advanced PAT concept using validation and feedback principles through out the entire life-cycle of drug product manufacturing processes.

A Process Model for the Systematic Development of Safety-Critical Systems (안전중시 시스템을 위한 체계적인 설계 프로세스에 관한 연구)

  • Yoon, Jae-Han;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.3
    • /
    • pp.19-26
    • /
    • 2009
  • It is becoming more and more important to develop safety-critical systems with special attention. Examples of the safety-critical systems include the mass transportation systems such as high speed trains, airplanes, ships and so forth. Safety critical issues can also exist in the development of atomic power plants that are attracting a great deal of attention recently as oil prices are sky-rocketing. Note that the safety-critical systems are in general large-scale and very complex for which case the effects of adopting the systems engineering (SE) approach has been quite phenomenal. Furthermore, safety-critical requirements should necessarily be realized in the design phase and be effectively maintained thereafter. In light of these comments, we have considered our approach to developing safety-critical systems to be based on the method combining the systems engineering and safety management processes. To do so, we have developed a design environment by constructing a whole life cycle model in two steps. In the first step, the integrated process model was developed by integrating the SE (ISO/IEC 15283) and systems safety (e.g., hazard analysis) activities and implemented in a computer-aided SE tool environment. The model was represented by three hierarchical levels: the life-cycle level, the process level, and the activity level. As a result, one can see from the model when and how the required SE and safety processes have to be carried out concurrently and iterately. Finally, the design environment was verified by the computer simulation.

A Study on the Application of Supply Chain Management in Curtain Wall Engineering (커튼월 공사에서의 공급사슬관리 적용에 관한 연구)

  • Park Sang-Woo;Park Sang-Jun;Kwon Won;Kim Chang-Duk;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.301-304
    • /
    • 2004
  • The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

  • PDF

Life Estimation of Organic Light Emission Diode by Accelerated Test (유기발광(有機發光) 다이오드의 가속(加速) 수명(壽命) 시험(試驗)에 관한 연구(硏究))

  • Choi, Young-Tei;Cho, Jai-Rip
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2010.04a
    • /
    • pp.262-268
    • /
    • 2010
  • Organic light emitting diode is developed fast from 1963 after discovering electric light emitting phenomenon. First PMOLED(passive matrix OLED) product is manufactured and AMOLED(active matrix OLED) using TFT(thin film ransistor) is now in the center. PMOLED is mainly mounted at sub display. but AMOLED is mounted at main display. Also AMOLED expand the market to PMP(portable multimedia players), navigation and TV. Even thought OLED's market is opening to many applications, OLED is worried about lifetime until now. That's appeared in market in a very short time and is not known well about result of OLED's lifetime and reliability test. And there is no standard ssessment method and not enough study to standardization the method. A study's purpose is reduce the time for life test by accelerated current and it can do production possible design by accelerated life model in design phase. It's must be add to process variables and design variables(like ratio of light emitting, organic material structure, condition of aging, etc) to make the best use of supplied accelerated lifetime model in this paper. In terms of lifetime it needs each criterion of applications because of image sticking. In conclusion, it's possible to discover new defect because there is not much time to be opened in market and develop a method of manufacturing process & materials, so we need to study on the subject of this paper continuously.

  • PDF