• Title/Summary/Keyword: Leakage risk

Search Result 424, Processing Time 0.027 seconds

Evaluation on Electric Shock Risk due to the Electric Potential Distribution in Bathtub (욕조에서의 전위분포 해석을 통한 전격재해 위험성 평가)

  • Kim, Chong-Min;Kim, Han-Sang;Kim, Sung-Chul;Kim, Doo-Hyun
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.1 s.79
    • /
    • pp.40-46
    • /
    • 2007
  • It is evaluated that electric shock risk in bath so that we made and designed a bathtub which is the same size in real public bath. And then, we did an experiment, provided of electric leakage in various conditions, so we measured how to form an electric potential and knew the electric potential is formed variously under exposed conductor in bath. Also, we made certain that electric shock risk is down if we insert an insulated pipe in bathtub pipe which is prevent from being formed the electric field sharply. The results show that the increased shock risk and safe distance are estimated by the bathtub of limited width and depth, and the voltage simulated on the basis of Flux 3D concept is compared with the measured value.

A Leakage Prevention Case of Primary 2-Arch Tunnel due to Heat Insulated Drainage (단열처리 유도배수에 의한 기존 2-Arch 터널의 누수방지 사례)

  • Kang, In-Kyu;Ryu, Jeong-Soo;Kim, Tae-Soo
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.561-564
    • /
    • 2007
  • This case was successfully constructed as a leakage prevention case of primary 2-arch tunnel located in Anyang, Gyungkido. The leakage of primary 2-arch tunnel was observed at middle wall of tunnel and girder of tunnel. Such a leakage of primary 2-arch tunnel generally occurred due to the damage of the waterproof membrane constructed on the middle wall during the blasting works of right and left tunnel after construction of the middle wall. As the leakage, icicles hanged from girder of tunnel in the winter. In such phenomenon, the risk of the traffic accident in the tunnel was high. In this case, leakage prevention works were successfully constructed using the heat insulated drainage.

  • PDF

Risk Assessment on Anastomotic Leakage after Rectal Cancer Surgery: An Analysis of 753 Patients

  • Yang, Liu;Huang, Xin-En;Zhou, Jian-Nong
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.14 no.7
    • /
    • pp.4447-4453
    • /
    • 2013
  • Purpose: To investigate the risk factors for anastomotic leakage (AL) after anterior resection for rectal cancer with a double stapling technique. Patients and Methods: Between January 2004 and December 2011, 753 consecutive patients in Jiangsu Cancer Hospital and Research Institute diagnosed with rectal cancer and undergoing anterior resection with a double stapling technique were recruited. All patients experienced a total mesorectal excision (TME) operation. Additionally, decrease of postoperative tumor supplied group of factors (TSGF), which have not been reported before, was proposed as a new indicator for AL. Univariate and multivariate analysis were performed to determine risk factors for AL. Results: AL was detected in 57 (7.6%) of 753 patients with rectal cancer. The diagnosis of anastomotic leakage was confirmed between the 6th and 12th postoperative day (POD; mean 8th POD). After univariate analysis and multivariate analysis, age (p<0.001), gender (p=0.002), level of anastomosis (p<0.001), preoperative body mass index (BMI) (p=0.001) and reduction of TSGF in 5th POD was less than 10 ${\mu}/ml$ (p<0.001) were selected as 5 independent risk factors for AL. It was also indicated that a temporary defunctioning transverse ileostomy (p=0.04) would decrease the occurrence of AL. Conclusion: AL after anterior resection for rectal carcinoma is related to elderly status, low level site of the tumor (below the peritoneal reflection), being male, preoperative BMI and the decrease of TSGF in $5^{th}$ POD is less than 10 ${\mu}/ml$. Preventive ileostomy is advisable after TME for low rectal tumors to prevent AL.

Analysis of the Impact of Fire and Explosion Accidents due to LNG Leaks in the LNG Re-gasification Process (LNG 재기화 공정에서 LNG 누출에 따른 화재 및 폭발사고의 피해영향 분석)

  • Lee, Yoon-Ho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.6
    • /
    • pp.825-833
    • /
    • 2018
  • In this study, one calculated the range of damage to the combustion characteristics according to the composition of LNG and the size of leaking holes, and analyzed the damage effect in case of leakage accidents caused by pipe damage in the re-gasification process for the LNG supply system. In order to confirm the combustion characteristics according to LNG composition, there was no significant difference in the result of risk analysis by LNG-producing areas. However, the higher the methane content of the components, the lower the risk of flash fire, hazardous areas of overpressure due to explosion, and thermal radiation damage caused by jet fire. In addition, one investigated the effect of leakage, holes, and ruptures on the risk range and explosions according to the size of the pipe-leakage hole. Also, the influence of overpressure and the range of damage from radiant heat could be predicted. One confirmed the effect of LNG composition and pipe-leakage size on fire and explosion.

Analysis of Risk Assessment Factors for Gas leakage and Dispersion in Underground Power Plant (지하복합발전플랜트 내의 가스 누출 및 확산에 의한 위험성 평가 인자 분석)

  • Choi, Jinwook;Li, Longnan;Park, Jaeyong;Sung, Kunhyuk;Lee, Seonghyuk;Kim, Daejoong
    • Journal of ILASS-Korea
    • /
    • v.20 no.2
    • /
    • pp.101-106
    • /
    • 2015
  • Gas leakage and dispersion in the underground LNG power plant can lead to serious fire and explosion accident. In this study, computational fluid dynamics simulation was applied to model the dynamic process of gas leakage and dispersion phenomena in a closed space. To analyze the risk assessment factor, such as the flammable volume ratio, transient simulations were carried out for different scenarios. The simulation results visualized the gas distribution with time in the closed space. The flammable volume ratio was introduced for quantitative analysis the fire/explosion probability.

Reduction Method of the Rick caused by Propellant Leakage at Liquid Rocket Test Facility (추진제 누출로 인한 위험을 감소시키는 방법)

  • Lee Jung-Ho;Bershadskiy V.A.;Kim Sang-Hern;Kang Sun-Il;Yu Byung-Il;Oh Seung-Hyub
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • v.y2005m4
    • /
    • pp.23-26
    • /
    • 2005
  • The method of decreasing the ecological risk for the LRE(Liquid Rocket Engine) test is developed, working on the cryogenic oxidizer and the high-boiling fuel(Kerosene). This Method is based on the study that contains a technical solution method and an accident occurrence range for decreasing of accident probability and damage. This paper contains schematic on the all risk circumstance bring to accident, block-diagram for an accident growth process in case of the propellant leakage, evaluation method of safety distance from test stand to residential area. It will be used to alternative method for the risk reduction of complex technical systems.

  • PDF

Electric Shock Risk Assessment of the Human Body and Potential Distribution Analysis by FLUX3D in a Public Bathtub (공중욕조에서의 FLUX3D에 의한 전위분포 해석 및 인체의 전격위험성 평가)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Lee, Jong-Ho;Kim, Han-Sang;Kim, Chong-Min
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.2 s.80
    • /
    • pp.41-46
    • /
    • 2007
  • This paper considers the electrical shock risk of the human body due to underwater leakage current in such places of public baths. Many submerged electric facilities in a public bath may create a severe electric shock hazard for the human body, since wet body in an accidentally energized bathtub can result in low electrical resistance through the human body for leakage or fault currents. Therefore a major consideration, in the context of electrical safety underwater, is the shock risk to the bather as a result of electric current flowing through the water in bathtub. To assess the electric shock risk and to analyze the potential distribution in a bathtub, 2 different situation cases are set up, then experimental and simulation methods are adopted. The validity of 2 cases of simulation and experiment data in a bathtub for electric distribution underwater are compared and analyzed. Also electric shock risk assessment underwater in a real public bathtub by simulation program package, Flux 3D, was conducted herein, and the results are presented and discussed.

A Study on the Risk Reduction Method for Liquid Rocket Test Facility (액체로켓 시험설비에서의 위험감소 방법)

  • Lee Jung-Ho;Kim Yong-Wook;Bershadskiy V. A.;Kang Sun-Il;Cho Sang-Yeon;Oh Seung-Hyub
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.9 no.3
    • /
    • pp.120-126
    • /
    • 2005
  • The method of decreasing the ecological risk for the LRE(Liquid Rocket Engine) test is developed, working on the cryogenic oxidizer and the high-boiling fuel(Kerosene). This Method is based on the study that contains a technical solution method and an accident occurrence range for decreasing of accident probability and damage. This paper contains schematic on the all risk circumstance bring to accident, block-diagram for an accident growth process in case of the propellant leakage, technical solution method and risk reduction evaluation method. It will be used to alternative method for the risk reduction of complex technical systems.

Development of Leakage Detector for Electric Equipment Failure in Fountain (분수대에서의 전기설비 고장에 대한 누전 감지 장치 개발)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Park, Jong-Young
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.35-40
    • /
    • 2018
  • This research aimed to develop an leakage detector of analyzing the electric potential generated from the electric leakage of electric equipment of the fountain. To accomplish this goal, the potential gradient was analyzed against path 1 ~ path 4; this was done by taking the lighting of a fountain as the electric leakage point based on code analyses in Korea and other countries. Lighting 1 was taken as the electric leakage point, and the earthing point was set against lightings(2~3). It appeared that the allowable touch voltage against the 1 type(under 2.5 V) exceeded 60.0%. Therefore, the lighting of fountain turned out to be the most dangerous point, and electric shock could be formed by the electric leakage of electric equipment in underwater as well as by the lighting. An leakage detector was developed based on this risk; this detector is capable of analyzing the electric potential of a electric equipments of the fountain in underwater. Then, a verification test was carried out. This leakage detector can be used to measure electric potential in various submerged areas such as swimming pools, flooded spaces, and fountains.

Chyle Leakage after Esophageal Cancer Surgery

  • Yang, Young Ho;Park, Seong Yong;Kim, Dae Joon
    • Journal of Chest Surgery
    • /
    • v.53 no.4
    • /
    • pp.191-199
    • /
    • 2020
  • Surgeons recommend dissecting lymph nodes in the thorax, abdomen, and neck during surgery for esophageal cancer because of the possibility of metastasis to the lymph nodes in those areas through the lymphatic plexus of the esophageal submucosal layer. Extensive lymph node dissection is essential for accurate staging and is thought to improve survival. However, it can result in several complications, including chyle leakage, which refers to continuous lymphatic fluid leakage and can occur in the thorax, abdomen, and neck. Malnutrition, fluid imbalance, and immune compromise may result from chyle leakage, which can be potentially life-threatening if it persists. Therefore, various treatment methods, including conservative treatment, pharmacological treatment such as octreotide infusion, and interventions such as thoracic duct embolization and surgical thoracic duct ligation, have been applied. In this article, the risk factors, diagnosis, and treatment methods of chyle leakage after esophagectomy are reviewed.