A Leakage Prevention Case of Primary 2-Arch Tunnel due to Heat Insulated Drainage

단열처리 유도배수에 의한 기존 2-Arch 터널의 누수방지 사례

  • Published : 2007.02.22

Abstract

This case was successfully constructed as a leakage prevention case of primary 2-arch tunnel located in Anyang, Gyungkido. The leakage of primary 2-arch tunnel was observed at middle wall of tunnel and girder of tunnel. Such a leakage of primary 2-arch tunnel generally occurred due to the damage of the waterproof membrane constructed on the middle wall during the blasting works of right and left tunnel after construction of the middle wall. As the leakage, icicles hanged from girder of tunnel in the winter. In such phenomenon, the risk of the traffic accident in the tunnel was high. In this case, leakage prevention works were successfully constructed using the heat insulated drainage.