• Title/Summary/Keyword: Large-scale wind power

Search Result 140, Processing Time 0.136 seconds

Probabilistic Load Flow for Power Systems with Wind Power Considering the Multi-time Scale Dispatching Strategy

  • Qin, Chao;Yu, Yixin;Zeng, Yuan
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1494-1503
    • /
    • 2018
  • This paper proposes a novel probabilistic load flow model for power systems integrated with large-scale wind power, which considers the multi-time scale dispatching features. The ramp limitations of the units and the steady-state security constraints of the network have been comprehensively considered for the entire duration of the study period; thus, the coupling of the system operation states at different time sections has been taken into account. For each time section, the automatic generation control (AGC) strategy is considered, and all variations associated with the wind power and loads are compensated by all AGC units. Cumulants and the Gram-Charlier expansion are used to solve the proposed model. The effectiveness of the proposed method is validated using the modified IEEE RTS 24-bus system and the modified IEEE 118-bus system.

Design of a Small-Scale Motor-Generator System for a Large Wind Turbine (대형 풍력발전기용 소형 모터-발전기 시스템 설계)

  • Lim, Chae Wook
    • The KSFM Journal of Fluid Machinery
    • /
    • v.20 no.1
    • /
    • pp.48-52
    • /
    • 2017
  • Small-scale motor-generator sets have been used in laboratories for verification of real large wind turbines whose rated power are more than 1 MW. In this paper, a result of designing a small-scale motor-generator system, which is composed of motor, gear box, flywheel, and generator, is presented in the aspect of speed response. Design objective is to make a small-scale motor-generator system have the same time constant and optimal tip speed ratio region as a real MW wind turbine. A small-scale 3.5 kW motor-generator system for emulating response of a 2 MW wind turbine is considered and designed.

Measurement and Analysis of Wind Energy Potential in Kokunsando of Saemankeum (새만금 고군산군도의 풍자원 측정 및 분석)

  • Shim, Ae-Ri;Choi, Yeon-Sung;Lee, Jang-Ho
    • New & Renewable Energy
    • /
    • v.7 no.2
    • /
    • pp.51-58
    • /
    • 2011
  • Saemankeum is well known for its high speed wind, and it is known that the blueprint of a future city around Saemankeum, including new industrial complex, has been planned. As a result, large-scale offshore wind farm, on the basis of the measurement of wind resource for a long time, can be considered, so that generated electricity can be used to meet the energy demand near the wind farm. Wind speed in Kokunsando of Saemankeum is measured and analyzed with its statistical distribution and wind directions. The probability of wind power resource over Kokunsando of Saemangeum is reviewed with the measured data in one island of Kokunsando. According to measured data, the shape and scale factor of Weibull distribution of wind speed are obtained, and then power density is analyzed as well. Through this study, it is clear that the Saemangeum area has a fluent and abundant wind power source to develop the wind farm in Korea.

A Study of a Novel Wind Turbine Concept with Power Split Gearbox

  • Liu, Qian;Appunn, Rudiger;Hameyer, Kay
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.2 no.4
    • /
    • pp.478-485
    • /
    • 2013
  • This paper focuses on the design and control of a new concept for wind turbines with a planetary gearbox to realize a power split. This concept, where the generated wind power is split into two parts, is to increase the utilization of the wind power and may be particularly suitable for large scale off-shore wind turbines. In order to reduce the cost of the power electronic devices, a synchronous generator, which is driven by the planetary gear, is directly connected to the power grid without electronic converter. A servo drive, which functions as the control actuator, is connected to the power grid by a power electronic converter. With small scale power electronic device, the current harmonics can also be reduced. The speed of the main shaft is controlled to track the optimal tip speed ratio. Meanwhile the speed of the synchronous generator is controlled to stay at the synchronous speed. The minimum rated power of the servo motor and the converter, is studied and discussed in this paper. Different variants of the wind turbine with a planetary gear are also compared. The controller for optimal tip speed ratio and synchronous speed tracking is given.

Power Quality Analysis of Wind Farms interconnected in Jeju System during HVDC Overhaul (HVDC Overhaul 기간 중 제주계통에 연계된 풍력발전의 전력품질 분석)

  • Chae, Woo-Kyu;Yoon, Gi-Gab;Cho, Seong-Soo;Jung, Won-Wook
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.11
    • /
    • pp.1946-1953
    • /
    • 2008
  • Power system of Jeju is interconnected to the mainland using HVDC and that is also interconnected to three wind farms. It will be difficult to control of Jeju power system if HVDC is disconnected or HVDC is overhauled under large scale wind farms interconnected. We measured and analysed the power quality of two substation and two wind farms to assess that wind farms have an effect on Jeju system during the HVDC overhaul last May. We concentrated on the power quality like frequency, voltage variation, voltage harmonics, current harmonics, flicker. We can found that the frequency of Jeju system is very unstable during overhaul, so the frequency of Jeju system can be variated easily by wind farm's rapid output power variation. There are some benefits and weak points in power quality between two wind farms because each wind farm is consist of different wind turbines.

Development of Unmanned Remote Monitoring System for MW Class Wind Turbines (대형 풍력터빈을 위한 무인 원격감시시스템 개발)

  • Park, Joon-Young;Kim, Beom-Joo;Lee, Jae-Kyung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.17 no.5
    • /
    • pp.412-418
    • /
    • 2011
  • The scale of wind turbines has continuously increased over the last decade. Especially, the rapid growth of the rotor diameter has brought about the increase of the tower height and the load on the rotor blade, as can be seen in the case of a 5MW class wind turbine with 126m rotor diameter. This trend means the increasing possibility of system failure. In addition to that, it is impossible for human operators to stay and manage all the turbines in the case of a large-scale wind farm. For these reasons, the operation and maintenance technology is getting more importance. In this paper, we present an unmanned remote monitoring system for MW class wind turbines and its application to YeungHeung wind test bed.

Design of Fuzzy Logic based MPPT(Maximum Power Point Tracking) Algorithm for Urban Wind Turbine System (도시형 풍력발전 시스템을 위한 퍼지로직 기반 MPPT 알고리즘 개발)

  • Youk, Yui-Su;Kim, Sung-Ho;Lee, Jang-Ho;Jang, Mi-Hye
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.20 no.1
    • /
    • pp.21-29
    • /
    • 2010
  • Generally, wind industry has been oriented to large power systems which require large windy areas and often need to overcome environment restrictions. However, small-scale wind turbines are closer to the consumers and have a large market potential, and much more efforts are required to become economically attractive. In this paper, a prototype of a small-scale urban wind generation system for battery charging application is described and a fuzzy logic based MPPT(Maximum Power Point Tracking) algorithm which can be effectively applied to urban wind turbine system is proposed. Through Matlab based simulation studies and actual implementation using DSP of the proposed algorithm, the feasibility of the proposed scheme is verified.

The comparison of the economic feasibility of small scale decentralized power supply systems in Korea (국내 주택용 전기사용자의 분산전원 설치 경제성 비교)

  • Han, Youri;Kim, Kilsin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.139.2-139.2
    • /
    • 2011
  • Compared with a traditional power system of electricity providers, distributed power systems consist of power suppliers which are small and demand-oriented. Each small power supplier tends to utilizes renewable energy sources such as solar and wind power. It is because that home renewable energy systems do not need a large scale infrastructure which is required for traditional power plants. In this work we study an economic feasibility of such a renewable energy source. We describe how renewable power generation works and what it brings in terms of economic benefits. Also, we analyze limitations by the current policy and their possible solutions.

  • PDF

Technical Trend of Radar Radio Interference Reduction Relating to Construction of the Offshore Wind Farm (해상 풍력발전단지 조성에 따른 레이더 전파간섭 저감 기술동향)

  • Kim, Young-Dal;Jeong, Yun-Mi;Lee, Dae-Dong
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.27 no.4
    • /
    • pp.250-256
    • /
    • 2014
  • The wind power generation is an eco-friendly clean energy that produces almost zero $CO_2$ emission, and has a good economic feasibility. As for the location, the installation of large turbines and construction of large-scale wind farm is easier on the offshore than on the land. In Korea, it is inevitable to generate offshore wind power through the offshore wind farm, and the radio interference of larger wind power generators and offshore wind power farm to broadcasting, communication and radars is becoming a core issue for constructing the offshore wind farm. In this study, the wind power generation status and rotor blade technology trend were presented, along with the technical trend of radar radio interference reduction relating to construction of the offshore wind farm.

Numerical Analysis with CFD Model for Site Designation in Urban Mountain Area (도심지 산악지형의 풍력발전 입지선정을 위한 전산유동해석 수치모의)

  • Lee, Hwa-Woon;Park, Soon-Young;Lee, Soon-Hwan;Kim, Dong-Hyuk
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.498-500
    • /
    • 2009
  • When we urgently need to develop and supply an alternative energy, wind power is growing with much interest because it has relative low cost for generating power and small area for wind turbine. To estimate the wind power resource, it is necessary to make an observation first. Although the large wind farm and resources are near coast and mountain area, the wind energy in urban area has the strong thing of direct access to power generator. In this study, we estimate the probability of wind energy in urban mountain area using A2C (Atmospheric to CFD) model, which is used for horizontally urban scale phenomena. In the steady state results, the site C is most suitable for wind power in the point of the only wind speed. But, estimating the TKE and vertical wind shear, the site B is showing the better results than the site C.

  • PDF