Power Quality Analysis of Wind Farms interconnected in Jeju System during HVDC Overhaul

HVDC Overhaul 기간 중 제주계통에 연계된 풍력발전의 전력품질 분석

  • Published : 2008.11.01

Abstract

Power system of Jeju is interconnected to the mainland using HVDC and that is also interconnected to three wind farms. It will be difficult to control of Jeju power system if HVDC is disconnected or HVDC is overhauled under large scale wind farms interconnected. We measured and analysed the power quality of two substation and two wind farms to assess that wind farms have an effect on Jeju system during the HVDC overhaul last May. We concentrated on the power quality like frequency, voltage variation, voltage harmonics, current harmonics, flicker. We can found that the frequency of Jeju system is very unstable during overhaul, so the frequency of Jeju system can be variated easily by wind farm's rapid output power variation. There are some benefits and weak points in power quality between two wind farms because each wind farm is consist of different wind turbines.

Keywords

References

  1. Global Wind Energy Council, 'Global Wind 2007 Hepor', 2008 5
  2. 황교익, '제주계통 단독운전 시 주파수 안정도 유지를 위한 풍력발전 운전용량 산정 방법에 관한 연구', 대한전기학회 논문집, 56권 2호 pp. 233-239, 2007
  3. 산업자원부, '풍력발전단지가 연계된 계통의 과도상태 해석 및 연계 허용용량에 관한 연구', 최종보고서, 2005.10
  4. IEC, 'IEC 61400-21', 2001
  5. 김건훈, '제주 월령 시범단지 풍력발전시스템 성능시험 및 결과의 고찰', 한국에너지공학회지, 제1권 제1호, pp. 10-16, 2001
  6. Roger C. Dugan, 'Electrical Power System Quality 2nd Edition', McGraw-Hill, 2002
  7. 한국전력공사 배전처, '분산형전원 배전계통 연계기술 해설서', 2006
  8. 김영환, '제주시역 풍력발전기에 의한 전력계통운영 영향분석', 대한전기학회 하계학술대회,A권, pp.127-129, 2007
  9. 김영환, "제주시역 풍력발전기에 의한 전력계통운영 영향분석", 대한전기학회 하계학술대회, A권, pp.127-129, 2007
  10. S. Muller, 'Doubly fed induction generator systems for wind turbines', IEEE Ind. Applicat Mag., pp 26-33, May/June 2002
  11. M. G. Simoes, 'Renewable Energy Systems(Design and Analysis with Induction Generators', CRC, 2007
  12. T. Ackermann, 'Wind Power in Power Systems', John Wiley & Sons, 2005