DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • 국제초고층학회논문집
    • /
    • 제3권4호
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

업무 정보전달관계를 이용한 대형복합건설사업의 정보흐름 색시스템 개발 (Development of the Retrieval System of Information Flow for a Large-scale and Complex Construction Project using Information Transfer Relationship on Business Process)

  • 신진호;이현수;박문서;유정호
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.84-93
    • /
    • 2012
  • 대형복합건설사업에서 생성되는 정보들은 장기간의 사업주기를 걸치며 다양한 사업주체간에 이동하며 변환 및 발전된다. 그래서 지연 등 사업수행에 문제가 발생하였을 때, 문제의 원인은 해당 업무가 아니라 그 업무와 관련된 이전 업무일 경우 정보흐름을 거슬러 올라가며 문제의 원인을 분석해야 한다. 그러나 복잡한 사업주체 및 업무들의 관계 때문에 사업에서 생성되는 정보들이 어떻게 흘러가는지에 대해 기존의 키워드검색방법으로는 이러한 정보흐름을 도출하기에는 적합하지 않다. 이에 본 연구에서는 대형복합건설사업의 정보흐름을 분석하기 위한 관계기반 정보검색기능을 구축하고 이를 사례 정보시스템에 적용하였다. 우선 기존 정보검색시스템의 활용동향과 대형복합건설사업의 특성을 분석하여 정보전달관계 검색시스템의 필요성을 도출하였고, 이에 적합한 시스템 구축 방법론 및 업무 간 관계 추론 알고리즘을 정립하였다. 그리고 구축한 시스템을 사례시스템인 도시재생사업의 업무정보시스템에 적용하여 그 활용방안을 제시하였다. 본 연구에서 제시한 정보흐름검색은 업무를 담당하는 주체 및 총괄 관리자가 사업 전체를 원활히 진행시키기 위한 주요 업무 도출 등에 이용할 수 있으며, 추가연구의 도구로서도 활용될 것으로 기대된다.

Resource and Sequence Optimization Using Constraint Programming in Construction Projects

  • Kim, Junyoung;Park, Moonseo;Ahn, Changbum;Jung, Minhyuk;Joo, Seonu;Yoon, Inseok
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-615
    • /
    • 2022
  • Construction projects are large-scale projects that require extensive construction costs and resources. Especially, scheduling is considered as one of the essential issues for project success. However, the schedule and resource management are challenging to conduct in high-tech construction projects including complex design of MEP and architectural finishing which has to be constructed within a limited workspace and duration. In order to deal with such a problem, this study suggests resource and sequence optimization using constraint programming in construction projects. The optimization model consists of two modules. The first module is the data structure of the schedule model, which consists of parameters for optimization such as labor, task, workspace, and the work interference rate. The second module is the optimization module, which is for optimizing resources and sequences based on Constraint Programming (CP) methodology. For model validation, actual data of plumbing works were collected from a construction project using a five-minute rate (FMR) method. By comparing actual data and optimized results, this study shows the possibility of reducing the duration of plumbing works in construction projects. This study shows decreased overall project duration by eliminating work interference by optimizing resources and sequences within limited workspaces.

  • PDF

AHP 기법을 응용한 건설업 협력업체 평가모형 개발에 관한 연구 (Subcontractor Evaluation Model for construction Industry Using AHP)

  • 김성수;이영훈
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.135-150
    • /
    • 2000
  • Korean construction companies are recently facing stiff competition in free market economy, and construction projects tend to be complex and large-scale. Such an environment demands that construction companies ensure specialized subcontractors. This paper suggested a subcontractor evaluation model for selection of competent subcontractors which are equipped with operational, technical and productive ability. For designing a subcontractor model, AHP method as a group decision-marking method is applied in assigning weighting indices of evaluation elements. To verify this method, actual data collected in one of construction companies are analysed statistically.

  • PDF

Safety Management System Prototype Based on BIM with RTLS

  • Kwang-pyo Lee;Hyunsoo Lee;Moonseo Park ;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.890-896
    • /
    • 2009
  • In past projects, the main goal has been to enhance efficiency by reducing cost and time. However, considering the current condition of safety management in many construction companies, it can be confirmed that safety management has not been a top priority for a long time. Current safety management, which is based on safety standards and rules, is very ineffective and only emphasizes management after an incident. As well, although fewer accidents occur compared to the past, because construction projects are increasingly large in scale and complex, these accidents tend to be more serious and involve greater monetary loss. Furthermore, as the severity of these accidents increases, so does the possibility of fatalities. Therefore, improving safety management is essential. This study proposes an effective program for safety management, focusing on the processes to connect studies and systems, and the basic techniques required for program development. To realize this program, technical tools are suggested, including systems such as BIM (Building Information Modeling); additionally, the coordination of other systems such as an RTLS, a server, and an alarm system is proposed.

  • PDF

Thermal and Electrical Energy Mix Optimization(EMO) Method for Real Large-scaled Residential Town Plan

  • Kang, Cha-Nyeong;Cho, Soo-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권1호
    • /
    • pp.513-520
    • /
    • 2018
  • Since Paris Climate Change Conference in 2015, many policies to reduce the emission of greenhouse gas have been accelerating, which are mainly related to renewable energy resources and micro-grid. Presently, the technology development and demonstration projects are mostly focused on diversifying the power resources by adding wind turbine, photo-voltaic and battery storage system in the island-type small micro-grid. It is expected that the large-scaled micro-grid projects based on the regional district and town/complex city, e.g. the block type micro-grid project in Daegu national industrial complex will proceed in the near future. In this case, the economic cost or the carbon emission can be optimized by the efficient operation of energy mix and the appropriate construction of electric and heat supplying facilities such as cogeneration, renewable energy resources, BESS, thermal storage and the existing heat and electricity supplying networks. However, when planning a large residential town or city, the concrete plan of the energy infrastructure has not been established until the construction plan stage and provided by the individual energy suppliers of water, heat, electricity and gas. So, it is difficult to build the efficient energy portfolio considering the characteristics of town or city. This paper introduces an energy mix optimization(EMO) method to determine the optimal capacity of thermal and electric resources which can be applied in the design stage of the real large-scaled residential town or city, and examines the feasibility of the proposed method by applying the real heat and electricity demand data of large-scale residential towns with thousands of households and by comparing the result of HOMER simulation developed by National Renewable Energy Laboratory(NREL).

Lessons learned from Multinational Parties Involved Program Management Consortiums in Korea

  • KO, Ok-Yeol
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.32-36
    • /
    • 2015
  • This study explores the issue of program management consortia involving multinational participants. The aim of this research was to leverage advantages in program management (PM) skills and PM model improvement in product line construction in mega scale construction programs, typically funded by public funds. Such ventures involve multinational parties using dedicated partnering based on a program management consortium (PMC) to reduce confrontation between parties in complex circumstances, allowing an open and non-adversarial approach to project management. This research also seeks to implement an ongoing feedback program of best practices and lessons learned to minimize the repetition of mistakes and to reduce costs in sequenced construction. Recently, the Korean government has planned to undertake three large new projects: the Korean Peninsula major river maintenance, the reclamation of Se-Mangum, and the Science/Business City. This paper starts by providing a framework for the cost-reduction strategy for the United States Forces Korea (USFK) Relocation Program, which will be funded with public funds and a private fund investment (PFI) that combines programs executed by two governments as owners and multinational stakeholders, joined in the PMC. The establishment of project-oriented consortia is an innovative and non-adversarial approach to massive international construction projects. Such projects have used various tools effectively and skillfully. This experience may offer an opportunity to practice new and advanced program management delivery methods, and it is expected that Korea will gain a competitive advantage in the international construction market.

  • PDF

건설 리프트의 적정 대수 산정에 관한 연구 (A Study on the Estimation of Proper Numbers of Construction Lifts)

  • 김선국;한갑규
    • 한국건축시공학회지
    • /
    • 제8권3호
    • /
    • pp.119-125
    • /
    • 2008
  • The volume of material and number of workers mobilized has been on the rise in line with the domestic projects getting higher, larger and complex currently. Particularly for the project in downtown, delivering the resources in timely manner is very crucial in carrying out the overall project as scheduled. Inappropriate lifting plan often causes inefficiency over the entire project, resulting in increase in schedule and cost. Despite of such importance of lifting plan for architectural work, lifting plans at the most of domestic projects, except a few cases for large scale high-rise buildings, have been heavily dependent on engineer's personal experience and intuition alone. To deal with such problems, the study was intended to develop and suggest a systematic and objective process for determining the lift, categorizing the lifting equipment into the two types, one for workers and another for material.