Recently, the rapid industrialization and urbanization of the country due to a high economic growth, require optimization, usage and the expansion of underground space. Therefore the consturction of large and deep basements takes place in braced excavated area where their earth retaining structures cause many problems such as settlement and damages of nearby buildings and underground utilities. this study deals with the influence distance of settlement and the amount for settlement based on the measurement which were obtained at five excavation construction sites. Maximum ground surface settlement, (0.28∼0.3)(%)H utilizing depth, is similar to the measurement and the value by Clough's method. It was found that the settlement and the influence distance of settlement calculated by Clough's method were rational.
Kim, Ki Jae;Lee, Sung Jin;Jang, Seung Yup;Hwang, Sung Ho
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.4
/
pp.715-722
/
2016
Most of the domestic railroad tracks are ballast track and repetitive maintenance is required in this track. Therefore, it is necessary to optimize maintenance process for maintenance cost reduction and more effective maintenance. For this, it is important to develop a reasonable settlement progressive model of ballast layer. However, the behavior of ballast is different to that of soils, since ballast is composed of large coarse gravel. Thus, in this study, we carried out numerical analysis by using the discrete element method (PFC 2D) for better understanding of ballast settlement and development of reasonable settlement progressive model. And, we evaluated the settlement of ballast according to particles shape, porosity and loading conditions.
This study investigated settlement and scouring characteristics of artificial reef reinforced with various reinforcement types to reduce settlement and scouring. Three reinforcement types were prepared: geogrid, geogrid-bamboo mat (GBM) and seaweed-pile mat (SPM). Various laboratory tests such as bearing capacity test, large size settlement test, two-dimensional flow scour test were performed according to different soil types (sand, silt, clay). Laboratory test results indicated that bearing capacity of seabed with a reinforced artificial reef increased and its settlement and scour depth reduced for all reinforcement types. Especially, reinforcement effect tends to be greater in clay soft ground rather than sand and silt grounds.
Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
Structural Engineering and Mechanics
/
v.84
no.5
/
pp.699-706
/
2022
Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.
Micropiles consisting of steel bars and grouts are commonly used in underpinning methods to reinforce supports or to suppress the subsidence of existing structures. Recently, applications in the field of geotechnical engineering have expanded. Despite the increasing use of micropiles are used, the PHC or steel pile formula is still applied for the settlement amount of micropiles. Compared with field test results, the amount of micropile subsidence obtained from the existing method may result in a very large error in the displacement of the micropile. Therefore, it is difficult to utilize micropiles effectively. Hence, to solve this problem, this study evaluated the behaviors and support characteristics of micropiles through field compression and tensile tests, and proposed a method for predicting the amounts of their subsidence. To confirm the appropriateness of the proposed method, field test results and the results obtained using the proposed method were compared. It was found that the settlement amounts of the micropiles as predicted through the existing method were significantly overestimated (error ≈ 50-80%) relative to the field test results, whereas the settlement errors of the piles predicted through the proposed method decreased (error ≈6-32%). Thus, it is possible to reduce the previously overestimated amount of settlement, and the modified method of this study allows more efficient design than the conventional method.
Kim, Dae-Sang;Park, Seong-Yong;Song, Jong-Woo;Kim, Soo-Il
Proceedings of the KSR Conference
/
2007.11a
/
pp.505-510
/
2007
Concrete track will be constructed in Gyungbu High Speed Railway II(GHSR II) stage construction site from Daegu to Busan. Concrete track is supported by substructure consisting of the original ground and embankment and does not allow the settlement of track because of its structural type. The embankment is composed of rock and soil mixture and settlement is feasible. So management of settlement of embankment is key point in successful construction of the concrete track. Compaction management of mixed fill materials is important in minimizing the settlement of embankment. In this study, in order to assess the compaction characteristics of mixed fill materials, large laboratory compaction tests were conducted. Mixed fill materials were obtained from two construction sites in GHSR II construction site. Modeled mixed fill materials having different rock type, fine content, maximum particle diameter, and moisture contents were prepared. From the test results, compaction characteristics of mixed fill materials were analysed.
In the construction of mountain tunnels, reaction forces of the legs of steel arch supports against the ground are often expected to support the ground being excavated. In these cases, a stress concentration occurs in the ground directly under the support legs. If the bearing capacity of the ground is insufficient or displacement is not effectively constrained, the local failure of the ground under the support legs or settlement of the tunnel supports due to large deformation could result. It is therefore necessary to reinforce the support legs to reduce settlement. As a means of reducing settlement, wing-ribbed steel arch supports are well used. In this study, with the aim of finding a way to quickly reduce the settlement of steel arch support legs, effectiveness of a new type of wing ribs to reinforce steel arch supports was investigated through laboratory testing.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2005.10a
/
pp.349-354
/
2005
In this study, settlement characteristics of 23 CFRD was investigated from monitoring data and the method to estimate the crest settlements considering internal settlement during constructions was proposed. Moreover, crest settlement smaller than 20cm and deflection of face slab smaller than 20cm are not considered to be critical to the stability of large dam whose height is over 40m. Therefore, we assigned the region as safe zone that can be used as a guideline of maintenance of dam. These estimated data can be used in the design, construction and long-term maintenance in domestic CFRD hereafter.
Mohamed, Fathi M.O.;Vanapalli, Sai K.;Saatcioglu, Murat
Geomechanics and Engineering
/
v.5
no.4
/
pp.343-362
/
2013
Simple relationships are proposed in this paper by modifying the Schmertmann's equation for settlement estimations of footings (i.e., $B/L{\approx}1$) carrying vertical loads in saturated and unsaturated sandy soils. The modified method is developed using model plate load tests (PLTs) and cone penetration tests (CPTs) results conducted in saturated and unsaturated sand in a controlled laboratory environment. Seven in-situ large-scale footings tested under both saturated and unsaturated conditions in sands were used to validate the proposed technique. The results of the study are encouraging as they provide reliable estimates of the settlement of shallow footings in both saturated and unsaturated sands using the conventional CPT results.
There are many large-scale coastal region landfill and land development by loading to use territory efficiently, this regions are mostly soft clay ground. Constructing structures and road on the soft ground bring about engineering problems like ground shear fracture and a big amount of consolidation by bearing capacity. Improvement of soft soil is required to secure soil strength and settlement control. In improvement of soft soil, predict for the amount of settlement based on field surveyed reports are important element for estimating pre-loading banking height and the final point of consolidation. In this study, there is calculating theoretical settlement by analyzing field surveyed report and ground investigation to improvement of soft soil with pre-loading and vertical drain method. And present settlement prediction method reflect soil characteristics in Gimpo Hangang site by analysing prediction settlement and observational settlement during compaction using hyperbolic, ${\sqrt{s}}$, Asaoka method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.