EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구 (A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project)

  • 조성;조용;백준홍
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.591-596
    • /
    • 2008
  • 건설 공사에서 발주방식은 프로젝트의 성패에 많은 영향을 준다. 이 논문은 대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구를 목적을 갖는다. 본 연구의 연구절차는 다음과 같다. 대형공사 발주 및 발주방식에 대한 이론적 고찰 실시하였고, 다음 국내 외 발주제도 방식을 조사하여 분석하였고, 이에 따른 대형공사의 발주 실태 및 문제점을 도출하였다. 이에 따라 대형공사의 경우 프로젝트의 특징 및 목적을 잘 반영하지 못한다는 문제점 등이 분석되었고, 분석된 문제점을 보안하기 위해서 기술제안형 입찰방식을 도입하기 위해서 현재 재정된 기술제안형 입찰 방식의 개념 및 절차에 대한 분석을 하였고, 이를 통하여 결과적으로 대형건설공사에 효율적으로 적용하기 위해서 기술제안서 작성 및 평가 반영을 위한 비가격 요소와 가격 요소로 분류하고 각 요소별 항목을 제시하였다.

  • PDF

프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구 (A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects)

  • 유준혁;김옥규
    • 한국건축시공학회지
    • /
    • 제21권4호
    • /
    • pp.347-359
    • /
    • 2021
  • 최근 건설공사는 초대형화로 단일 공사규모가 복잡해지고 천문학적인 공사비가 소요되는 프로그램 관리 형태의 성격을 지니는 사업이 등장하고 있다. 특히, 대규모 건설사업과 같이 프로그램 수준에서 관리가 절대적으로 필요한 사업은 계획된 일정 및 비용에 대한 전제적인 관리가 필요하다. 하지만 국내의 경우 구체적인 공사지연에 관한 관리기준이 부재한 현실이다. 이에 본 연구에서는 대규모, 장기간 진행되는 프로그램 수준의 대규모 건설사업을 성공적으로 수행하고 공정지연 및 부진사업을 사전에 방지하기 위한 지연관리지수(Delay Management Index, DMI)를 개발하였다. 이를 통해 대규모 복합건설 프로젝트를 대상으로 사례연구를 수행하였으며, 프로그램 수준 건설사업을 위한 지연예방체계를 구축하였다.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안 (Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects)

  • 이상돈
    • 환경영향평가
    • /
    • 제13권4호
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

3D/BIM Applications to Large-scale Complex Building Projects in Japan

  • Yamazaki, Yusuke;Tabuchi, Tou;Kataoka, Makoto;Shimazaki, Dai
    • 국제초고층학회논문집
    • /
    • 제3권4호
    • /
    • pp.311-323
    • /
    • 2014
  • This paper introduces recent applications of three-dimensional building/construction data modeling (3D) and building information modeling (BIM) to large-scale complex building construction projects in Japan. Recently, BIM has been utilized as a tool in construction process innovation through planning, design, engineering, procurement and construction to establish a front-loading-type design building system. Firstly, the background and introduction processes of 3D and BIM are described to clarify their purposes and scopes of applications. Secondly, 3D and BIM applications for typical large-scale complex building construction projects to improve planning and management efficiency in building construction are presented. Finally, future directions and further research issues with 3D and BIM applications are proposed.

건설공사 금액별 안전관리자 선임수 산정식 도출에 관한 연구 (Formulation to Produce Safety Engineers by Project Amount Assigned to Construction Site)

  • 손기상;갈원모;최재남
    • 한국안전학회지
    • /
    • 제24권3호
    • /
    • pp.25-31
    • /
    • 2009
  • Safety engineers should be reasonably assigned to construction sites in order to prevent accidents specially for large-scaled projects. More engineering-oriented safety engineers should be assigned to those large-scaled projects because accident causes are found to be due to more technical aspects rather than general safety problems. more experienced engineers should be assigned to larger scaled projects for covering more technical aspects. This one is analyzed by the existing accident results. This study is to find out some formulae to calculate how many safety engineers should be assigned to construction sites, by amounts, by project kinds, by project scales, by engineer grades. So that construction contractor can assign them to their site economically.

대규모 개발사업에서의 PFV 구성에 관한 연구 (A Study on the composition of PFV(project financing vehicle) used in large-scale development project)

  • 김은성;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.159-163
    • /
    • 2008
  • The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.

  • PDF

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF