• Title/Summary/Keyword: Landscape Problems

Search Result 617, Processing Time 0.026 seconds

A Study on Landscape Destruction and Intrusion at National Park in Japan (일본 국립공원에 있어서 경관파괴 및 침해에 관한 연구)

  • 배중남
    • Korean Journal of Environment and Ecology
    • /
    • v.11 no.3
    • /
    • pp.316-325
    • /
    • 1997
  • The purpose of this study was to understand landscape edstruction and intrusion problems in national parks in Japan. Literature survey focused on the related journals was attempted for classifying landscape problems in period, cause, regional base. In period base, landscape problems in national parks can be classified into four representative time periods(1960~1967, 1968~1975, 1976~1985 and 1990's). Eight categories, such as dam construction, forest practices, visitor impacts, park planning, and others, were also found as the major causes on landscape destruction. In addition, the survey results showed that these problems have been more concentrated in KANTO(FUJI-HAKONE-IZU, NIKKO National Park) and CHUBU region(CHUBUSANKAKU National Park) than other regions in Japan. This seemed to be caused by increased visitor numbers, development of tourist facilities, forest practices and so on.

  • PDF

A Study on the Landscape Impact Simulation for Development Projects in Natural Landscape (자연경관 내 개발사업에 대한 경관영향예측 시뮬레이션)

  • Shin, Min-Ji;Shin, Ji-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.3
    • /
    • pp.59-66
    • /
    • 2019
  • This study saw developed to build a landscape monitoring methodology by simulation of landscape effect prediction. A Visual landscape planning and management system has been introduced and implemented by each ministry so as to solve the problems of visual landscape destruction due to recognition on the value of natural landscape of beautiful territory and various development projects. At present, this system emphasizes the importance of the visual and perceptual aspect of the landscape however, there is a lack of techniques required for comprehensively predicting, evaluating, and managing it. Furthermore, sustainable landscape management after the completion of development projects has been inadequately carried out, as the focus has been only on consultation in the planning process of the development project in institutional performance. The viewpoint for judging the change in the visual landscape of the development plan and development project should be selected as the effective point where the development project is expected to result in a remarkable landscape change. As for the method of selecting effective viewpoints, the main viewpoints are selected by analyzing the visible area of the target viewpoint. When selecting the viewpoint centered on the viewpoint target, it was judged that it is possible to reduce the procedure of selecting and checking the existing preliminary viewpoints and widening the effective visible range. The proposed visual landscape monitoring is expected to be able to solve the existing institutional problems, and to be used when the implementers and authors of the development projects review the effects on the landscape.

A Study on the Analysis of the Importance of Natural Landscape by the Development Project (개발사업에 의한 자연경관 영향 저감방안 중요도 분석에 관한 연구)

  • Shin, Min-Ji;Shin, Ji-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.2
    • /
    • pp.99-117
    • /
    • 2019
  • Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.

A Study on Improvements of Landscape Impact Assessment - EIA and PER in Priority - (경관영향평가제도의 개선에 관한 연구 - 사전환경성검토와 환경영향평가를 중심으로 -)

  • Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.4
    • /
    • pp.68-80
    • /
    • 2005
  • This study intends to analysis problems and propose of EIA(Environmental Impact Assessment) and PER(Pre-Environmental Review) especially on division of landscape impacts. The problems of EIA and PER are first, on analysis of existing conditions side, insufficiency of the list of landscape elements and their descriptions and presentations, and the number of viewpoints and each validity second, on estimation of landscape impacts, the methods and techniques of estimation and simulation, and the process of impact estimation, third, on suggestion of reduction plans, reduction devices covering impacts, the lack of influence reduction forecasting devices, the deficiency of execution power of reduction plans, finally, the systematic connection of impact estimation with existing conditions analysis and reduction plans. Therefore, on each step from existing condition analysis to reduction plan suggestion, the solutions to each problem are proposed.

A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project - (도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 -)

  • Shin Dong-Hoon;Lee Kyoo-Seock
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.4
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

A Study on the Improvement of the Rural Landscape Planning in Rural Village Development Projects (농촌마을종합개발사업에서 경관형성계획의 개선방안에 관한 연구)

  • Kim, Choong-Sik;Yu, Joo-Eun
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.3
    • /
    • pp.11-22
    • /
    • 2009
  • The purpose of this study is to analyze the present condition of the landscape plans(LPs) established in the Rural Village Development Projects(RVDPs) and to propose the ways to improve the LP. Toward this end, the legal system related to rural landscape and the RVDP were examined. Also, the current condition of the LPs was diagnosed through making researches on the RVDP and LP of the 10 regions. The results of examining the legal system showed that the suitable types of the LPs is 'the Specific Landscape Plan' in Rural Area. Of the development projects that have been in operation, RVDP was found to have been equipped with the system. Because the LPs can be established and the contents of formation and readjustment of rural landscape elements were broadly dealt with in RVDP. And the RVDPs consisted mostly of scenery facilities, rural village sightseeing, and income-growth. The results of examining the plan establishment procedures showed that the LPs were set up as subordinate plans of the RVDP, so structural problems such as the positions of the plans, inadequacy in the procedures of approval and collecting opinions were identified. Such problems were pointed out as the cause of the LP to deal with the contents of the basic designs of the RVDP. The schemes to resolve the problems are to give equal positions to the LPs and to the basic plans of the RVDP. When the results of this study are reflected on the policies, the LP will effectively carry out the functions of formation and management of continued scenery preservation of rural villages.

Evaluation of the Landscape Context of Zhaoxing Dong Village, Guizhou Province, China (중국 구이저우성(貴州) 자오싱(肇兴) 촌락(侗寨) 경관문맥 평가)

  • Ye, De Hui;Park, Jae Chul;Peng, Yu Yuan
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.22 no.3
    • /
    • pp.1-8
    • /
    • 2020
  • This paper takes Zhaoxing Dong village in Guizhou Province as the research object. The purpose is to study the continuity of landscape context in Dong Village. The research process includes specification on the evaluation system of Dong village landscape context by AHP method, and use of the questionnaire survey method in sequence, according to the specific situation of Zhaoxing Dong village, and this study develops a specific questionnaire that modifies the evaluation system suited to reflect specific problems. Through the analysis of the specific questionnaire and recycling in Zhaoxing Dong village, this study found that Zhaoxing Dong village as a whole is over commercialized due to the vigorous development of tourism service industry. As a result, whether it is experts, foreign tourists or local villagers, the rating of the village landscape is low. There are three problems in the village landscape context: historical continuity, invisible cultural heritage and contradiction in protection and development. The results of this paper provides a future direction for the protection and inheritance of Zhaoxing Dong village.

A Case Study on Rural Landscape Management based on the Resident Participation in Osaka Prefecture, Japan (지역 주민 주체의 농촌지역 경관관리 사례 연구 - 일본 오사카부를 중심으로 -)

  • Park, Jin-Wook;Lee, Yoo-Jick
    • Journal of Korean Society of Rural Planning
    • /
    • v.23 no.1
    • /
    • pp.165-174
    • /
    • 2017
  • Four requirements for the operating and supporting system for sustainable landscape management will be discussed through this paper. The requirements are based on multiple case studies on the structure and the process of development of three organizations that have been contributing to the sustainable rural landscape management in Japan since 1989. The first requirement is that the residents should recognize regional problems and voluntarily organize a group which can properly deal with the problems. Secondly, members of the organization should have a solid grasp of the goal of their activities (or founding principal of the organization) and share it among themselves. Founding principal should include the history of natural circulation system in the area, cultural features and a future plan in association with human resources. Thirdly, the administration of the organization should be separated from the founder, the residents. The administration, such as business promotion, becomes more effective when consigned to a separate entity, not to the residents. Lastly, the interaction among separate entities is crucial to promote diverse activities for the local landscape management. The administrators and experts need to cooperate to draw a precise conclusion regarding the way of interaction. These requirements drawn from the Japanese case studies should be localized to the Korean circumstances for further adoption.

A Study on Landscape Restoration of the Namhan-Sansung Village (남한산성 마을경관의 복원방향에 관한 연구)

  • Kim, Duk-Sam
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.6 s.119
    • /
    • pp.101-110
    • /
    • 2007
  • This study is a base research for the restoration of village landscape of the Namhan-Sansung. The Namhan-Sansung has been recognized as a top destination for dining places. However, there have been increasing concerns about the village landscape and its rich historic and cultural heritages transformed into dining places. The village landscape of Namhan-Sansung should be reconstructed as a setting for education and loaming of Korean history and culture forgotten for a long time. The landscape also should be a space where resolute resistance and spirit of Korean people and a futuristic village space where environment friendly community environment harmonizes with daily lives. Restoration efforts of village landscape of the Namhan-Sansung can get to start from exploring the prototype of the village. In order to restore the prototype, it is important to review potential elements and setbacks. Based on the prototype of the Namhan-Sansung village, transitions of village landscape were reviewed and directions of restoration were proposed. Also, an improvement plan was proposed after reviewing problems in system and planning.

Tendencies in Question Development on the Professional Landscape Architect Qualification Examination - Centered on Recognition of Test-Takers for Sample Questions from Previous Professional Landscape Architect Tests - (조경기술사 시험의 출제경향 - 현행 기출문제에 대한 수험생의 인식정도를 중심으로 -)

  • Kang, Hyun-Goo;Kim, Hak-Beom
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.38 no.5
    • /
    • pp.42-52
    • /
    • 2010
  • This research analyzed the overall issues pertaining to the questions that appear in the professional landscape architect screening system to assess 1he recognition of test-takers when it comes to the test questions in terms of the question objectivity, appropriateness, difficulty level and so forth The purpose of this is to present a set of recommendations so that the screening system can he improved and the professional landscape architect screening system consolidate its position. This in turn can help the professional landscape architect qualification process consolidate its position and improve the status of the landscape area in the industrial field. The research of this study was conducted for the all-round development of Landscape Architecture. The research method was divided into two stages, and a group of experts was leveraged to study subjects that are tested and subjects allocated. A survey was conducted of candidates and certification holders to assess the questions that appear in the test in terms of their level, objectivity, difficulty level, tendency of questions and so forth. Firstly, the study demonstrated that the subjects tested in the professional landscape architect test are different from the testing subjects that are suggested in the enforcement ordinance of the National Technical Professional Law. In addition, o1her problems include the overvaluation of a subject for testing, a lack of objectivity in testing, and difficulty level adjustment of questions. One main reason for many of these kinds of problems is that the questions appeared without thorough review and there is a lack of management concerning the members of the commtittee that develops the question. Accordingly, to make up for these problems, a viable screening system such as the reorganization of subjects that are tested, assigning suitable subjects, securing of question objectivity, and difficulty level of developed questions are necessary.