Journal of the Korean Institute of Landscape Architecture International Edition
/
no.1
/
pp.213-218
/
2001
To many developing countries like China, the practical way to constant development of city construction is low consuming. The basic methods of low-cunsuming landscape construction: 1) Low building consumption: Decreasing construction quantity. Using low-costing material. Designing low-consuming landscape. Reusing of building material. 2) Low energy consumption: Decreasing water consumption. Consuming and enrichment of earth fertilizer. Decreasing electrical consumption. 3) Low maintenance: Adapting natural material. Using local plants. Special design to decrease maintaining. Because of many reasons, China has not yet adapting Low-consuming Landscape Construction.
Journal of the Korean Institute of Landscape Architecture
/
v.40
no.2
/
pp.97-111
/
2012
This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.
Journal of the Korean Institute of Landscape Architecture
/
v.20
no.2
/
pp.106-118
/
1992
The landscape architecture construction cost estimation includes the repeated calculation and updating. Thus, it is time-consuming, and one of the jobs which needs to be automated first. In Korea, the IBM compatible personal computer(PC) is the most widely used one in the landscape architecture firms. However, the software for landscape architecture construction cost estimation is not being used in the PC environment. Therefore, the purpose of this study is to develop the software which can be used to automate the calculation for the landscape architecture construction cost estimation, and runs in the IBM compatible personal computers(PC). The clipper '88 summer is one of the DBMS software packages, and it has many commands and functions and functions which reduces program lines and makes the programing efficient, especially in the programing work whose total source code lines do not exceed over 10,000 lines. So, it was used in this study. The software developed in the this study was tested using the real data, and it was found that it can be efficiently used in the following jobs. They are: (1) to calculate exactly and rapidly. (2) to use resources repeatedly. (3) to print out the results. (4) to store data files for the future use. The software, as discussed in this paper, reduces the time and efforts to be spent in the calculation for the landscape architecture construction cost estimation compared with the traditional approach using the pocket calculator.
Journal of the Korean Institute of Landscape Architecture
/
v.44
no.6
/
pp.177-187
/
2016
This study started with the question, "Is the cost of landscape construction work in residential areas measured by public enterprises, 'in response to the needs of consumers?" The study analyzed whether the landscape construction expenditure is being introduced at an appropriate ratio according to the value the residents have regarding landscape elements. Following this, research was conducted for the purpose of providing basic data for improving the efficiency of formulating apartment landscape construction costs in the future. This research proceeded based on a questionnaire survey of residents of apartments, and the content of the questionnaire used frequency analysis and descriptive statistics research methods. To take a look at a comparative analysis of value recognition, in particular, a comparative analysis was performed based on the actual input cost based on the ratio of landscape elements by layer. Conclusions were found as follows: First, the degree of interest in the apartment landscape of the tenants was high, and the value of the landscape was high but realistic satisfaction appeared comparatively low. Second, the awareness of residents' values regarding landscape elements appeared to give "plantings" more value than "facilities". Thirdly, as a result of a mutual comparison between the values recognized by the resident regarding landscape elements and the construction input fee, depending on the landscape elements, it appeared that there is a difference in the ratio of up to 52 times from 1.25. Fourth, the fact that there is a difference in the relative proportion of value recognition and inputting construction cost indicates that it is not possible to respond to the needs of tenants during the construction cost development process. It also shows that the utility of inputting construction costs is low. Therefore, a macro-level examination such as reflecting the existing inflation rate is necessary to develop the efficient landscape construction cost of apartment such as the awareness of the value of the residents regarding landscape elements, out of the customary construction cost formulation method based on the microscopic dimensions of the consumer side.
Journal of the Korean Institute of Landscape Architecture
/
v.31
no.5
/
pp.139-145
/
2003
This study aims to review the research trends of landscape construction and materials, and to discover the research characteristics in Korea. The research scope was limited to the 905 articles lin the Journal of Korean Institute of Landscape Architecture between 1973 and 2003. The results of the research were as follows. The number of articles concerning landscape materials and construction were few(5.8%), compared to other research fields. The articles were categorized by sequences of the structures, the construction and management, the development of engineering and the development of materials. The articles concerning construction and construction management were categorized into 3 types of quality management; construction and materials, the cost estimation and the work classification and processes. The soils was studied together with plants suited to such soil characteristics as layer, structure, and composition.
Journal of the Korean Institute of Landscape Architecture
/
v.40
no.1
/
pp.81-91
/
2012
The purpose of this study was to analyze judicial precedents related on landscape construction defects(JPLCD) and suggested the improvement plan for dealing with it. The results are as the following: 1. Landscape construction defects litigations have been increased so far since 2000 and the duration of original trial was approximately 603 days, while appeal trials took up to 550 days. Therefore, the analysis revealed that settlement of disputes were lengthy and wasteful to consumers and constructors. 2. Judgement's cost accepted by the judge was only 53.6% of appraisal's cost appraised by appraiser, therefore it revealed appraiser overestimated the repair cost of landscape construction defects. 3. According to work classification categorized by Landscape Construction Standard Specification(2008) of the Korean Institute of Landscape Architecture, landscape planting amounted to 75% of JPLCD and plaintiff(consumers)'s prevailing rate of it reached 77% to be a serious burden to constructors. 4. According to JPLCD categorized by the type of dispute, defects caused by consumer's negligence for maintenance amounted to 29% and defendant(constructors)'s prevailing rate of it reached 64% to be the main responsibility of consumers. Further study will be required to make the judge standard of landscape construction defects through legal and technical research.
Journal of the Korean Institute of Landscape Architecture
/
v.43
no.6
/
pp.150-159
/
2015
This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.
Journal of the Korean Institute of Landscape Architecture
/
v.25
no.1
/
pp.82-99
/
1997
The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.
Journal of the Korean Institute of Landscape Architecture
/
v.33
no.2
s.109
/
pp.111-121
/
2005
The Seoul Housing Corporation pronounced an alternative design competition and a bidding for Eunpyeong New Town in December of 2004. At first many construction companies were interested in the first New Town Project. But at last a few companies had proposed the alternative design and construction cost. This project needed a conjunction of design ideas and technology know-hows. And the client wanted the brand power of construction company. Ultimately the Corporation hoped that the first New Town Project will end up with high quality successfully. This competition had started with the original construction drawings. Then it needed some alternative ideas and the lowest cost. There were two drawings of non changeable part and changeable part. Non changeable parts are structure like housing unit plan, underground parking lots. Changeable parts are outdoor layout, interior design and building facade. So we tried all ideas of landscape technology and design principles within limited guidelines. The author applied new technology like tilted rooftop greening and sustained container greening on high-rise apartment house. This green technology will be the first trial in Seoul and in the world as well. Daewoo Corporation have accumulated greening technology through the researches by national funding since 2002. Through this New Town Project the green technology will go forward step by step.
Journal of the Korean Institute of Landscape Architecture
/
v.50
no.4
/
pp.20-36
/
2022
This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.