• Title/Summary/Keyword: Landscape Construction Cost

Search Result 70, Processing Time 0.031 seconds

Basic Train of Thoughts for the Construction of Low Cost Scenery Spots

  • Duanmu, Shan
    • Journal of the Korean Institute of Landscape Architecture International Edition
    • /
    • no.1
    • /
    • pp.213-218
    • /
    • 2001
  • To many developing countries like China, the practical way to constant development of city construction is low consuming. The basic methods of low-cunsuming landscape construction: 1) Low building consumption: Decreasing construction quantity. Using low-costing material. Designing low-consuming landscape. Reusing of building material. 2) Low energy consumption: Decreasing water consumption. Consuming and enrichment of earth fertilizer. Decreasing electrical consumption. 3) Low maintenance: Adapting natural material. Using local plants. Special design to decrease maintaining. Because of many reasons, China has not yet adapting Low-consuming Landscape Construction.

  • PDF

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

A Study on the Software Development to Automate the Calculation for the Landscape Architecture Construction Cost Estimation. (조경 공사 내역서 계산 자동화를 위한 소프트웨어 개발에 관한 연구)

  • 이규석;황국웅
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.2
    • /
    • pp.106-118
    • /
    • 1992
  • The landscape architecture construction cost estimation includes the repeated calculation and updating. Thus, it is time-consuming, and one of the jobs which needs to be automated first. In Korea, the IBM compatible personal computer(PC) is the most widely used one in the landscape architecture firms. However, the software for landscape architecture construction cost estimation is not being used in the PC environment. Therefore, the purpose of this study is to develop the software which can be used to automate the calculation for the landscape architecture construction cost estimation, and runs in the IBM compatible personal computers(PC). The clipper '88 summer is one of the DBMS software packages, and it has many commands and functions and functions which reduces program lines and makes the programing efficient, especially in the programing work whose total source code lines do not exceed over 10,000 lines. So, it was used in this study. The software developed in the this study was tested using the real data, and it was found that it can be efficiently used in the following jobs. They are: (1) to calculate exactly and rapidly. (2) to use resources repeatedly. (3) to print out the results. (4) to store data files for the future use. The software, as discussed in this paper, reduces the time and efforts to be spent in the calculation for the landscape architecture construction cost estimation compared with the traditional approach using the pocket calculator.

  • PDF

Analysis of the Investment Suitability relative to the Landscape Elements Construction Costs within the Residents' Value Recognition in the Apartment - Focused on a Public Institutional Apartment Complex near the Capital Area - (아파트 단지 조경요소별 입주민의 가치인지도 대비 공사비 측정의 상대적 적정성 분석 - 공공기관 시행 수도권 분양아파트를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.6
    • /
    • pp.177-187
    • /
    • 2016
  • This study started with the question, "Is the cost of landscape construction work in residential areas measured by public enterprises, 'in response to the needs of consumers?" The study analyzed whether the landscape construction expenditure is being introduced at an appropriate ratio according to the value the residents have regarding landscape elements. Following this, research was conducted for the purpose of providing basic data for improving the efficiency of formulating apartment landscape construction costs in the future. This research proceeded based on a questionnaire survey of residents of apartments, and the content of the questionnaire used frequency analysis and descriptive statistics research methods. To take a look at a comparative analysis of value recognition, in particular, a comparative analysis was performed based on the actual input cost based on the ratio of landscape elements by layer. Conclusions were found as follows: First, the degree of interest in the apartment landscape of the tenants was high, and the value of the landscape was high but realistic satisfaction appeared comparatively low. Second, the awareness of residents' values regarding landscape elements appeared to give "plantings" more value than "facilities". Thirdly, as a result of a mutual comparison between the values recognized by the resident regarding landscape elements and the construction input fee, depending on the landscape elements, it appeared that there is a difference in the ratio of up to 52 times from 1.25. Fourth, the fact that there is a difference in the relative proportion of value recognition and inputting construction cost indicates that it is not possible to respond to the needs of tenants during the construction cost development process. It also shows that the utility of inputting construction costs is low. Therefore, a macro-level examination such as reflecting the existing inflation rate is necessary to develop the efficient landscape construction cost of apartment such as the awareness of the value of the residents regarding landscape elements, out of the customary construction cost formulation method based on the microscopic dimensions of the consumer side.

Research Trends concerning Landscape Materials and Construction in the Journal of the Korean Institute of Landscape Architecture (한국조경학회지 게재논문 조경소재.시공 분야의 연구경향)

  • 조세환
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.31 no.5
    • /
    • pp.139-145
    • /
    • 2003
  • This study aims to review the research trends of landscape construction and materials, and to discover the research characteristics in Korea. The research scope was limited to the 905 articles lin the Journal of Korean Institute of Landscape Architecture between 1973 and 2003. The results of the research were as follows. The number of articles concerning landscape materials and construction were few(5.8%), compared to other research fields. The articles were categorized by sequences of the structures, the construction and management, the development of engineering and the development of materials. The articles concerning construction and construction management were categorized into 3 types of quality management; construction and materials, the cost estimation and the work classification and processes. The soils was studied together with plants suited to such soil characteristics as layer, structure, and composition.

A Study on the Improvement of Defect Management through Judicial Precedents of Landscape Construction Defect (조경공사 하자판례 분석을 통한 하자처리 개선방안 연구)

  • Jung, Myeung-Muk;Lee, Sang-Suk
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.1
    • /
    • pp.81-91
    • /
    • 2012
  • The purpose of this study was to analyze judicial precedents related on landscape construction defects(JPLCD) and suggested the improvement plan for dealing with it. The results are as the following: 1. Landscape construction defects litigations have been increased so far since 2000 and the duration of original trial was approximately 603 days, while appeal trials took up to 550 days. Therefore, the analysis revealed that settlement of disputes were lengthy and wasteful to consumers and constructors. 2. Judgement's cost accepted by the judge was only 53.6% of appraisal's cost appraised by appraiser, therefore it revealed appraiser overestimated the repair cost of landscape construction defects. 3. According to work classification categorized by Landscape Construction Standard Specification(2008) of the Korean Institute of Landscape Architecture, landscape planting amounted to 75% of JPLCD and plaintiff(consumers)'s prevailing rate of it reached 77% to be a serious burden to constructors. 4. According to JPLCD categorized by the type of dispute, defects caused by consumer's negligence for maintenance amounted to 29% and defendant(constructors)'s prevailing rate of it reached 64% to be the main responsibility of consumers. Further study will be required to make the judge standard of landscape construction defects through legal and technical research.

Characteristic Analysis of the Changes of Landscape Architecture Construction Costs in Time-series - Focused on the Cases of Works of Public Institution's at Capital Area - (아파트단지 조경 공사비의 공종별 경년변화 특성 분석 - 공공기관 시행의 수도권 아파트단지를 중심으로 -)

  • Park, Sang-Jin;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.43 no.6
    • /
    • pp.150-159
    • /
    • 2015
  • This study was conducted for the purpose of presenting basic data for calculating a more reasonable landscaping project cost in the future through the construction cost calculation ratio of scenic planting and facilities and their time series trend analysis targeting 'J' corporation, a representative Korean public institution that creates apartment complexes. This study targeted scenic planting and the facility construction costs of 37 apartment complexes in the capital area from 2004 to 2012, using statistical analysis methods such as technical analysis, correlation analysis, and regression analysis to analyze the characteristics of the time series change. The conclusion was drawn as follows. First, breaking down the cost of overall landscaping projects to scenic planting and facility construction, the ratio of the average cost of scenic planting to that of facility construction showed 56.1% to 43.9% from 2004 to 2012. Second, the costs of planting construction and facility construction both showed a fluctuation range of about ${\pm}3%$, implying relatively steady costs considering the inflation rate. Third, the landscape construction cost for each type of construction resulted in a fluctuation range from minimum ${\pm}3%$(exercise facility) to maximum ${\pm}5%$(packing facility), reflecting that among the landscaping projects, the facility construction costs tended to show relatively large fluctuations in accordance with the change of time series. Fourth, the comprehensive indication of the ratio of landscaping project costs by time series and landscaping construction type implies that the regional characteristics and positional condition of the apartment complexes were not reflected sufficiently. Fifth, the high level of correlation of landscaping construction types and landscaping construction elements imply that the entire construction costs were controlled through partial adjustment of cost components within the overall frame of construction cost. These results reveal the problems of standardized landscaping cost irrespective of user satisfaction or environmental traits such as the conditions of the apartment complexes.

A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction - (실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로-)

  • 박원규;김두하;안동만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.1
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

A Landscape Design Proposal for Eunpyeong New Town, Seoul (서울 은평 뉴타운 1지구 조경설계)

  • Kim Soon-Boon;Chin Yang-Gyo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.33 no.2 s.109
    • /
    • pp.111-121
    • /
    • 2005
  • The Seoul Housing Corporation pronounced an alternative design competition and a bidding for Eunpyeong New Town in December of 2004. At first many construction companies were interested in the first New Town Project. But at last a few companies had proposed the alternative design and construction cost. This project needed a conjunction of design ideas and technology know-hows. And the client wanted the brand power of construction company. Ultimately the Corporation hoped that the first New Town Project will end up with high quality successfully. This competition had started with the original construction drawings. Then it needed some alternative ideas and the lowest cost. There were two drawings of non changeable part and changeable part. Non changeable parts are structure like housing unit plan, underground parking lots. Changeable parts are outdoor layout, interior design and building facade. So we tried all ideas of landscape technology and design principles within limited guidelines. The author applied new technology like tilted rooftop greening and sustained container greening on high-rise apartment house. This green technology will be the first trial in Seoul and in the world as well. Daewoo Corporation have accumulated greening technology through the researches by national funding since 2002. Through this New Town Project the green technology will go forward step by step.

A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees (도시 가로수 관리 품셈 개선에 관한 연구)

  • Do, Yoon-Taek;Han, Bong-Ho;Park, Seok-Cheol
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.50 no.4
    • /
    • pp.20-36
    • /
    • 2022
  • This study aims to provide basic data for high-quality street tree management by setting reasonable management items and appropriate unit prices by reviewing the adequacy of current street tree management. Currently, street tree management items, except for street tree pruning, use general landscape tree quantity per unit for the street tree management quantity per unit. KEPCO (Korea Electric Power Corporation) applied pruning items from standard electric production infrastructure and carried out the activities at an average unit price of 51% lower for heavy pruning and 39% lower for light pruning than the standard estimate. This was judged to be a level that could not maintain or increase the quality of street tree management. It was determined that an appropriate standard unit price for street tree management was necessary. To improve the quantity per unit for the proper management of street trees, it was necessary to review costs in the field. However, due to the absence of data on actual construction costs in the domestic landscape field, detailed items of the US RSMeans Building Construction Cost Data (RSMeans) were reviewed, and the actual construction costs were calculated by applying personal domestic expenses. As a result, the standard of the estimated unit showed a good ratio of 107% for heavy pruning of street tree pruning compared to the actual construction cost, but light pruning was underestimated with a 59% ratio. Shrub pruning was 82%, weeding was 92%, tree fertilization was 87%, and windbreak wall installation was 91% under-engineered. In addition, it was also confirmed that the watering by sprinkler trucks and chemical spraying were over-designed compared to the actual construction cost at the rates of 118% and 124%, respectively. Due to the specificity of the street trees, the increase in personal expenses and the input cost of equipment, such as road safety controls, were judged to be the main cause of the underestimation of items. Therefore, it is necessary to add items related to street trees and general landscape trees to the landscape maintenance items of the standard of the estimated unit.