• Title/Summary/Keyword: Landscape Architecture Construction Project Management

Search Result 45, Processing Time 0.026 seconds

Jeju Shinyang Fishing Port Remodeling Plan Utilizing Marine Tourism Resources (해양관광자원을 활용한 제주 신양항 리모델링 계획)

  • Kim, Yelim;Sung, Jong-Sang
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.2
    • /
    • pp.52-69
    • /
    • 2016
  • The fishing port was once the foothold of production as well as the stronghold of communities but with the declining of the fishing industry, ports became abandoned space. Jeju Special Self-Governing Province has continued its effort to vitalize marine tourism since 2010. Shinyang Port in particular is designated as a Prearranged Marina Port Development Zone, and planning for the Jeju Ocean Marina City project is underway. Nevertheless, fishing port remodeling projects implemented on Jeju so far have focused only on civil engineering such as renovating old facilities. In addition, most Marina Port Development Projects have been irrelevant to local communities. Leading projects by the local government mostly suffer from a lack of funding, which results in the renovation of old facilities and improper maintenance, while private sector investment projects do not lead to benefit sharing with the community. Shinyang Port, also renovated in 2008, ended up with outer breakwater extension construction that neither solved the fundamental problem of the site nor gave benefits to residents. To arrange a way to solve problems for civil engineering focused development project, improper maintenance, and benefit sharing with community, first, this study proposes a development plan that connects with the outlying areas near the ports. The plan reflects existing topography, Jeju traditional stonewalls, narrow paths on the master plan and programs by reading the regional context. In this way, this paper suggests a space development plan reflecting the local landscape and characteristic factors. Second, it satisfies various needs by using existing and new Marine Tourism Resources. Third, it examines sustainable operation and management measures through residents' participation. The proposal is significant in two key ways: it is a fresh attempt at connecting the fishing port with its outlying areas from a landscape perspective; and it considers environmental, social, economic issues, and suggests participation for local communities. Thus, the model can be used in future fishing-port remodeling plans for revitalizing unused space, including invaluable traditional landscapes, and for boosting the marine-leisure industry.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

A Study on Current Status and Improvement Plans of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업의 추진 현황과 개선 과제)

  • Cho, Dong-Gil;Kim, Sang-Wook
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.63-72
    • /
    • 2010
  • This study was conducted to investigate the current status and the improvement plans of the ecosystem conservation fund return projects. In 2007, there was a reformation of the ecosystem conservation fund system but the fund return projects were not vitalized up until now. In this study, 35 of ongoing and finished fund return projects were investigated on their types, sites, costs, local governments, and time required to return the fund. Through the on-site survey of 9 finished projects (4 biotope, 2 corridor and 3 natural conservation facility projects), construction and management conditions were investigated. The main findings are as follows: Among the five fund return types, 17 cases were biotope restoration projects, 4 cases were ecological corridor projects, and 1 case was a nature replacement project. In the case of project sites, there were 14 cases near schools and public facilities, 8 cases near rivers or streams, and 2 cases near ponds or wetlands. For the construction costs, there were 19 cases (65% of all the projects) that cost less than 300 million won. In terms of the involvement of the local government, most of the fund return projects were concentrated in Gyeonggi province and Ulsan city, and there were some local governments outside of these regions that did not carry out any return projects at all. Lastly, in the case of fund return time required, 35% of the fund returns were completed within 5 months, but the overall average fund return time was 9.8 months. In respond to the above study results, the improvement plans to encourage fund return projects are as follows: To diversify return types and sites, piloting and modeling projects for the representative types and sites should be preceded. To emerge from customary small-scaled projects, incentives to encourage large-scale and ecological networking projects should be considered. In addition, in order to write up business plans for the fund return projects, long-term investigations of at least 2 seasons from spring to fall are necessary. Finally, for the continuous management and maintenance of the ecological fund return sites, easier way for the citizens to actively participate in the projects should be incorporated.

A Study of Characteristics of Seeding Plants through Improvements of Dredge Vegetation-Base -Focus on Site 14 in Nakdong-gang- (준설토 파종식물의 생육경향 및 관리방안 연구 -낙동강 14공구 중심으로-)

  • Kim, Nam Choon;Ann, Phil Gyun;Nam, Sang Jun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.1
    • /
    • pp.141-154
    • /
    • 2012
  • This study was launched to verify the effective composition of plant species and its management program most suited for the dredged soiled area near Nakdong River Site 14. The improvement methods of planting base and the composition of plants such as silver grass, reed, and some colonies in aesthetic effect were studied. To search the management methods to decrease the confining pressure risen from the burried seeds which would consequently harm the previously seeded plants, experimental construction process was measured on the site. The purpose of this experiment was to figure out which part of the improvement on the plant base has the most significant effect for the revegetation of infertile, dredged soil, to verify the easily seeded, developing plants among seeded plants, and finally, to find the restoration model using plants near the dredged soil around riverside. 8 seeded plants and 23 invaded species were appeared which among the emerged plants, development of Aster yomena MAKINO, Lotus corniculatus var. japonica Regel, Trifolium repens L, and Dianthus longicalyx Miq were proved to be brought up well. Difference risen from the seed composition were not noticeable until 150day since the germination was proceeded mainly by Aster yomena MAKINO. The experimental plot with dredging sand+organic fertilizer method of construction and dredging sand+soil conditioner method showed most development while the effect of the plot with only the soil base of dredging sand stayed low. Another important method for the management of infertile, dredged soil base would be the removal of disturbing species which the experiment showed the tied relationship between the removal of disturbing species and development of seeding plants. Although this study was carried out focused on the Nakdong River Project, the study suggests the general management program that the removal of disturbing species such as Humulus japonicus Sieboid & Zucc. and Pueraria lobata (Willd.) Ohwi in times around rainy season(60days after seedling) would be effective for the easy growth of revegetation plants.

Study of the Value of National Cultural Heritage in the Gaetaesa Temple Site, Nonsan and the Establishment of an Integrated Maintenance Plan (논산 개태사지의 국가문화재적 가치 및 종합정비방안 수립에 관한 연구)

  • Seo, Jung-young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.2
    • /
    • pp.76-87
    • /
    • 2019
  • This study aims to analyze the status of the Gaetaesa Temple Site in Nonsan and the value of national cultural heritage associated with it, to work towards gaining the acceptance criteria to become state-designated cultural property and to propose a plan for comprehensive maintenance, a plan for the promotion of the project and a plan for the management and operation. The Gaetaesa Temple Site in Nonsan has unprecedented advancements, and the condition of the remains are relatively good. It would be necessary to conduct digging/excavation surveys continuously in the future and ensure the dignity of the Gaetaesa Temple Site in Nonsan as a cultural asset. In addition, the Gaetaesa Temple Site has excellent historical and cultural values as treasure-class cultural heritage. Most temples had treasures taken out of them, so it is necessary to designate this site as a state-designated cultural property instead of a municipality-designated cultural heritage site, and to manage it systematically. Accordingly, this study investigated the history and historical facts about the Gaetaesa Temple Site in Nonsan through the analysis of literature, including old documents, old maps, related academic papers and books, and referred to the results of digging/excavation surveys, conducted up to six times since the first excavation survey conducted in 1986, in order to understand the status of the remains, ruins and the building sites excavated at the Gaetaesa Temple Site in Nonsan. In addition, this study analyzed the values of the Gaetaesa Temple Site in Nonsan, dividing them into the remains, relics and ruins, and set up the scope of the Gaetaesa Temple Site in Nonsan, the cultural property area (designated and protected areas) and the acceptance criteria for the construction work in the historical and cultural environment preservation area. This study proposed a plan for the comprehensive maintenance of the Gaetaesa Temple Site in Nonsan, a plan for the promotion of the project and a plan for the management and operation. It is necessary to carry out ongoing excavation investigations and to reflect the opinions of the residents for the purchase of land, to supplement the comprehensive maintenance plan, business promotion and management plans, and step-by-step business plans should be established in detail.