• Title/Summary/Keyword: Landing Task

Search Result 24, Processing Time 0.021 seconds

Strategies for Driving and Egress for the Vehicle of a Humanoid Robot in the DRC Finals 2015 (DRC Finals 2015 에서 휴머노이드 로봇의 자동차 운전과 하차에 관한 전략)

  • Ahn, DongHyun;Shin, JuSeong;Jun, Youngbum;Sohn, Kiwon;Jang, Giho;Oh, Paul;Cho, Baek-Kyu
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.22 no.11
    • /
    • pp.912-918
    • /
    • 2016
  • This paper presents various strategies for humanoid vehicle driving and egress tasks. For driving, a tele-operating system that controls a robot based on a human operator's commands is built. In addition, an autonomous assistant module is developed for the operator. Normal position control can result in severe damage to robots when they egress from vehicles. To prevent this problem, another approach that mixes various joint control techniques is adopted in this study. Additionally, a footplate is newly designed and attached to the vehicle floor for the ground landing phase of the egress task. The attached plate enables the robot to step down onto the ground in a safe manner. For stable locomotion, a balance controller is designed for the humanoid. For the design of the controller, the robot is modeled using an inverted pendulum that consists of a spring and a damper. Then, a state feedback controller (with pole placement and a state observer) is built based on the simplified model. Many approaches that are presented in this paper were successfully applied to a full-sized humanoid, DRC-HUBO+, in the DARPA Robotics Challenge Finals, which were held in the United States in 2015.

Safe arm posture when using vertical rescue sack (수직 강하식 구조대 사용 시 안전한 팔 자세)

  • Jeon, Jai-In;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.1
    • /
    • pp.1-6
    • /
    • 2020
  • This study is about the safe arm posture in case of emergency escape using the vertical dive rescue sack at the fire site. The experimental results are as follows. First, the arms extended upward contact with the endothelium and narrowing part of the rescue sack minimized the scratches did not occur. Second, the bent position with both arms open was subject to light abrasions of on the elbows due to friction between the elbows and the scapula and the endothelium. Third, in the posture where both arms were gathered in the chest, the body passed through the narrowing part and friction between the bag's narrowing part, All subjects had light abrasions on their elbows. Fourth, because the arms are lowered, the legs are extended to the width of the shoulders when descending, so that the back of the hand has friction with the narrowing part of the bag and the endothelial skin. Finally, posture with both arms below the front increased the volume of the front of the body, resulting in a slight back injury. As a future research task, it is necessary to study the proper posture of legs and the posture of landing on the ground.

The Construction Direction of the ROK NAVY for the Protection of Marine Sovereignty (국가의 해양주권 수호를 위한 한국해군의 전력건설 방향)

  • Shin, In-Kyun
    • Strategy21
    • /
    • s.30
    • /
    • pp.99-142
    • /
    • 2012
  • Withe increased North Korea's security threats, the South Korean navy has been faced with deteriorating security environment. While North Korea has increased asymmetric forces in the maritime and underwater with the development of nuclear weapons, and China and Japan have made a large investment in the buildup of naval forces, the power of the Pacific fleet of the US, a key ally is expected to be weakened. The biggest threat comes from China's intervention in case of full-scale war with North Korea, but low-density conflict issues are also serious problems. North Korea has violated the Armistice Agreement 2,660 times since the end of Korean War, among which the number of marine provocations reaches 1,430 times, and the tension over the NLL issue has been intensifying. With tension mounting between Korea and Japan over the Dokdo issue and conflict escalating with China over Ieo do Islet, the US Navy has confronted situation where it cannot fully concentrate on the security of the Korean peninsula, which leads to need for strengthening of South Korea's naval forces. Let's look at naval forces of neighboring countries. North Korea is threatening South Korean navy with its increased asymmetric forces, including submarines. China has achieved the remarkable development of naval forces since the promotion of 3-step plan to strengthen naval power from 1989, and it now retains highly modernized naval forces. Japan makes an investment in the construction of stat of the art warship every year. Since Japan's warship boasts of its advanced performance, Japan's Maritime Self Defense Force is evaluated the second most powerful behind the US Navy on the assumption that submarine power is not included in the naval forces. In this situation, naval power construction of South Korean navy should be done in phases, focusing on the followings; First, military strength to repel the energy warship quickly without any damage in case of battle with North Korea needs to be secured. Second, it is necessary to develop abilities to discourage the use of nuclear weapons of North Korea and attack its nuclear facilities in case of emergency. Third, construction of military power to suppress armed provocations from China and Japan is required. Based on the above naval power construction methods, the direction of power construction is suggested as follows. The sea fleet needs to build up its war potential to defeat the naval forces of North Korea quickly and participate in anti-submarine operations in response to North Korea's provocations. The task fleet should be composed of 3 task flotilla and retain the power to support the sea fleet and suppress the occurrence of maritime disputes with neighboring countries. In addition, it is necessary to expand submarine power, a high value power asset in preparation for establishment of submarine headquarters in 2015, develop anti-submarine helicopter and load SLAM-ER missile onto P-3C patrol aircraft. In case of maine corps, division class military force should be able to conduct landing operations. It takes more than 10 years to construct a new warship. Accordingly, it is necessary to establish plans for naval power construction carefully in consideration of reality and future. For the naval forces to safeguard maritime sovereignty and contribute to national security, the acquisition of a huge budget and buildup of military power is required. In this regard, enhancement of naval power can be achieved only through national, political and military understanding and agreement. It is necessary to let the nation know that modern naval forces with improved weapon system can serve as comprehensive armed forces to secure the command of the sea, perform defense of territory and territorial sky and attack the enemy's strategic facilities and budget inputted in the naval forces is the essential source for early end of the war and minimization of damage to the people. If the naval power construction is not realized, we can be faced with a national disgrace of usurpation of national sovereignty of 100 years ago. Accordingly, the strengthening of naval forces must be realized.

  • PDF

A Study on Legal and Regulatory Improvement Direction of Aeronautical Obstacle Management System for Aviation Safety (항공안전을 위한 장애물 제한표면 관리시스템의 법·제도적 개선방향에 관한 소고)

  • Park, Dam-Yong
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.31 no.2
    • /
    • pp.145-176
    • /
    • 2016
  • Aviation safety can be secured through regulations and policies of various areas and thorough execution of them on the field. Recently, for aviation safety management Korea is making efforts to prevent aviation accidents by taking various measures: such as selecting and promoting major strategic goals for each sector; establishing National Aviation Safety Program, including the Second Basic Plan for Aviation Policy; and improving aviation related legislations. Obstacle limitation surface is to be established and publicly notified to ensure safe take-off and landing as well as aviation safety during the circling of aircraft around airports. This study intends to review current aviation obstacle management system which was designed to make sure that buildings and structures do not exceed the height of obstacle limitation surface and identify its operating problems based on my field experience. Also, in this study, I would like to propose ways to improve the system in legal and regulatory aspects. Nowadays, due to the request of residents in the vicinity of airports, discussions and studies on aviational review are being actively carried out. Also, related ordinance and specific procedures will be established soon. However, in addition to this, I would like to propose the ways to improve shortcomings of current system caused by the lack of regulations and legislations for obstacle management. In order to execute obstacle limitation surface regulation, there has to be limits on constructing new buildings, causing real restriction for the residents living in the vicinity of airports on exercising their property rights. In this sense, it is regarded as a sensitive issue since a number of related civil complaints are filed and swift but accurate decision making is required. According to Aviation Act, currently airport operators are handling this task under the cooperation with local governments. Thus, administrative activities of local governments that have the authority to give permits for installation of buildings and structures are critically important. The law requires to carry out precise surveying of vast area and to report the outcome to the government every five years. However, there can be many problems, such as changes in the number of obstacles due to the error in the survey, or failure to apply for consultation with local governments on the exercise of construction permission. However, there is neither standards for allowable errors, preventive measures, nor penalty for the violation of appropriate procedures. As such, only follow-up measures can be taken. Nevertheless, once construction of a building is completed violating the obstacle limitation surface, practically it is difficult to take any measures, including the elimination of the building, because the owner of the building would have been following legal process for the construction by getting permit from the government. In order to address this problem, I believe penalty provision for the violation of Aviation Act needs to be added. Also, it is required to apply the same standards of allowable error stipulated in Building Act to precise surveying in the aviation field. Hence, I would like to propose the ways to improve current system in an effective manner.