• 제목/요약/키워드: Land development project

검색결과 464건 처리시간 0.023초

A Study of Estimation of Carbon Effects per Unit Area by Park & Green Type in Development Project Area (개발사업지구의 공원 · 녹지 유형별 탄소효과 원단위 산정에 관한 기초연구)

  • Kang, Myung-Soo;Kim, Jong-Rim;Kim, Nam-Jung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • 제16권5호
    • /
    • pp.71-81
    • /
    • 2013
  • This study is aimed to provide basic data for the estimation of carbon effects in development project areas such as Happy Housing Project which includes redevelopment and reconstruction projects by inducing the basic unit of carbon effects and strategic planning and management to enhance carbon effects. According to the analysis, in urban parks, carbon uptake and carbon storage by the unit area of living area parks were $7.614kg/m^2$ and $18.5203kg/m^2$ respectively while carbon uptake and carbon storage by the unit area of theme parks were $1.2261kg/m^2$ and $2.831kg/m^2$ each. In facility greens, carbon uptake and carbon storage were $0.5683kg/m^2$ and $0.6636kg/m^2$ respectively while they were $10.77kg/m^2$ and $13.69kg/m^2$ individually in other urban planning facilities. In other greens, on the contrary, carbon uptake and carbon storage were $0.45kg/m^2$ and $1.02kg/m^2$ respectively. In site landscape, carbon uptake and carbon storage by the unit area of apartment landscape were $3.7394kg/m^2$ and $9.2292kg/m^2$ each.

Land Development Project Area Underground Facility Management A Plan Using GIS (GIS를 활용한 택지개발사업지구 지하시설물 관리방안)

  • 김감래;이재기;임건혁
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 한국측량학회 2003년도 추계학술발표회 논문집
    • /
    • pp.329-334
    • /
    • 2003
  • The aim of this study is propriety review for underground facility surveying on development area of land for housing and efficient management. Because of integration information administration system construction of the nation and development of information technology, construction of Urban information system(UIS) to manage systematically city space is increasingly necessary We manage systematically attribute information for each lot in the development area of land lot housing that it Is connected with NGIS in order to drive gradual computerization of underground facilities and arrange the base of facility management. Review arrangement methods on development area of land for housing makes it to check safety accident of urban and to leading base of urban information. Thus, this study draw the most suitable way through analysis of driving methods and expectation effect from above facts.

  • PDF

Strategies for Acceleration of Damaged Area Restoration Project in the Development Restriction Zone

  • Park, Seong Yong;Jung, Sung Ae;Lee, Sang Jo;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • 제22권6호
    • /
    • pp.641-651
    • /
    • 2019
  • The purpose of this study is to derive institutional improvement methods for promoting the Damaged Area Restoration Project in greenbelts. The current status of greenbelts in Gyeonggi-do, where greenbelts are extensively distributed was analyzed, and the relevant laws and regulations were reviewed to suggest measures to promote the restoration project. The area of damaged areas within greenbelts in Gyeonggi-do was 6,121,024 m2, accounting for about 0.52% of the total area of greenbelts, and more than 80% was found to be located in Namyangju (55.49%), Hanam (16.48%), and Siheung (8.68%). Various measures to improve the policy were examined as follows: reducing the minimum size of the restoration project area; adjusting baseline of recognizing range of damaged areas; introducing the right of claim for land sale; allowing long-term unexecuted urban parks to be replaced as alternative sites for parks and green spaces; simplifying administrative procedures; and allowing public participation. All of them are expected to promote the restoration project within greenbelts. In results, when the minimum size of area for the restoration project was reduced from 10,000 m2 into 5,000 m2, 3,000 m2 and 2,000 m2, the ratio of the number of combinable lots to the total number of lots increased from 4.4% to 18.8%, 38.8%, and 55.9% respectively in Namyangju. Morever, when the recognizable ranges of the restoration project were extended to the structures obtaining building permit as of March 30, 2016 and obtaining use approvals before December, 2017, the number of applicable lots increased by 5.1% and 9.2% respectively.

A Case Study on the Successful Old-Town u-City Construction by an Effective Financing (효과적인 재원조달을 통한 구도시 u-City 구축사례연구)

  • Park, Kwang-Ho;Kim, Myung-Dong;Kim, Yun-Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • 제35권3호
    • /
    • pp.192-203
    • /
    • 2012
  • As a leading nation of ubiquitous technology, South Korea has been promoting u-City pilot projects throughout the country. According to 'Fundamental Construction Law of u-City,' u-City projects are classified into old-town and new-town types. However, most projects have focused only on the new-town type. Pushing forward large-scale land development projects, Korea Land and Housing Corporation (LH Co.) under Ministry of Land Transport and Maritime Affairs (MLTM) has gained a development profit out of the u-City infrastructure and then donated the infrastructure to a local government without making any plan for operations. In the process of u-City pilot projects, old-towns have been relatively ignored and various of unexpected problems have emerged. Building the u-City of an old-town is not easy due to many constraints such as huge initial investment, long validity and verification procedures, lack of useful services for citizens, lack of professional outsourcing methods for business promotion, high operating costs of the integrated control center, inadequate law related, insufficient institutional requirements and so on. This paper introduces a case study on u-City development for an old-town, Ansan City, as a private investment project. The case will help boost u-City projects for old-towns by solving their problems and providing an effective operational mechanism. As the first BTL (Build-Transfer-Lease) project for constructing u-City, 'Broadband Information Network Development Project' of Ansan City will provide a reference model of expanding u-City projects for other cities.

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • International conference on construction engineering and project management
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

A Case Study on the Housing Development by Using the Space of Retarding Basin - Focused on the Tetsugakudo Kouen Collective Housing Development Project - (유수지 공간을 활용한 주거지개발 사례연구 -일본 철학당 공원(테츠가쿠도 코우엔) 주거단지 사례를 중심으로-)

  • Baek, Seung-Kwan;Kim, Young-Hoon
    • KIEAE Journal
    • /
    • 제15권1호
    • /
    • pp.129-137
    • /
    • 2015
  • The purpose of this study is to analyze the Tetsugakudo Kouen Collective Housing Development Project in Japan. Project implemented cooperatively by the Tokyo Metropolitan Government in charge of river management, Shinjuku and Nakano-ku responsible for park management, and the UR, a housing project developer. This project set a significant precedent for three-dimensional river use by realizing the three-dimensional integrated development of a flood control reservoir, a park, and collective housing. The major effectiveness of this project can be summarized into four points. 1) The costs borne by individual project developers were significantly reduced by realizing a high degree of application and multipurpose use of the land through a joint project. 2) This project, which was designed to accommodate rainfall of 30 to 40mm per hour, is expected to contribute to reducing flood damage and generating significant investment effects, in terms of asset value in downstream areas, thereby increasing flood control security. 3) Local disaster prevention function were enhanced by providing an evacuation site in the case of an earthquake. 4) The living environment was improved by adding the function of a park.

Analysis of National Land Expansion Effect of Saemangeum Integrated Tidal Land Reclamation Project (새만금 간척종합개발사업(干拓綜合開發事業)의 국토확장효과(國土擴張效果) 분석(分析))

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • 제27권2호
    • /
    • pp.141-157
    • /
    • 2000
  • This study is aimed at identifying the socio-economic value of the total area of 23,500ha of paddy field which will be reclaimed in year 2003. In Korea, tidal land reclamation projects has been carried out not only for paddy field expansion to meet national food security but also for national land expansion to cope with the shortage of land supply in implementing urbanization and industrialization. As of end of 1999, 75,738ha of tidal land reclamation, 48.3%, out of 156,666ha has been carried out in Korea. In spite of continuous implementation of tidal land reclamation, 48.3%, out of 156,666ha has been carried out in Korea. In spite of continuous implementation of tidal land reclamation projects, the appraisal of the national land expansion value has not been made even though the severe competitiveness of land use in economic development. Agricultural land about 20,000 - 30,000ha per year has been converted to urban and industrial land and the converted areas have been produced higher added value than that of the farm land. Accordingly, farm land expansion equivalent to the converted area have to be reclaimed to cope with the food shortage and security in the future. In relation to the study, demand and supply of rice, the staple food of Korean, has been projected up to year 2025. The study results are as follows: 1. Under the assumption of continuing the present tendencies of rice consumption, population increase, farming practices and farm land conversion, paddy area requirement to meet self sufficiency of rice were forecasted as 136,950ha in 2015, 193,460ha in 2020 and 218,482ha in 2025 respectively. 2. The average converted price of paddy per pyeong in Kimje city, Puna Gun and Gunsan city was estimated at 241,150won and average farm land price was amounted to 63,760won. The differential rent was estimated at 177,400won per pyeong which was used as a criteria for valuation of national land expansion effect of the tidal land reclaimed by Saemangeum project. The total land rent of 23,250ha expanded by tidal land reclamation was amounted to 12,361 billion won. Annual expected value of the expanded national land was estimated at 988.9 billion won considering 8% of annual discount rate in Korea. 3. Tidal land resource for paddy area development is limited comparing with the future requirement of paddy area to cope with self sufficiency of rice consumption. Accordingly farm land conversion to urban and industrial land should be regulated and protected in the sense of sustainable development in the future.

  • PDF

A Study on the Factors Affecting Land Prices Caused by the Development of Industrial Complex (산업단지 개발에 따른 지가형성요인에 관한 연구)

  • Kim, Young-Joon;Sung, Joo-Han;Kim, Hong-Bae
    • Journal of Cadastre & Land InformatiX
    • /
    • 제47권1호
    • /
    • pp.143-160
    • /
    • 2017
  • Since officially assessed land price system was introduced, it has functioned as the criterion for establishing and implementing real estate policies. However, there is a controversial issue about the adequacy of the officially assessed land price system. The problem is that it is difficult to establish a statistical model due to too many land characteristics. Also, local economy, macroeconomic environments and development plans are not reflected in the land price evaluation model. Considering longitudinal and cross-sectional variables, a two-way error component panel model was used in this study. This analysis model includes variables reflecting land characteristics, macroeconomic volatility, and development project. The Paju LCD Industrial Complex was selected as a analysis area and an empirical analysis was performed. According to the analysis, the number of significant land characteristic variables were 14(31%) under 5% significance level. Macroeconomic volatility has had an influence on the land price and year variable reflecting development project has consistently been significant since the industrial complex was designated. Therefore, this study suggests that the land price evaluation model should be improved by simplifying land characteristic variables and including macroeconomic and regional economic variables.

Multi-dimensional Utilization of a Railway Facility Site and the Need for Institutional Support: The Multi-dimensional Project of the Gyeongbu Line (철도시설 부지 입체적 활용 및 제도적 지원의 필요성 - 경부선 철도 입체화 사업을 대상으로 -)

  • Shin, Eun ho;Kim, Jong gu;Kang, Youn won;Keum, Yun geon;Kwon, Young soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • 제42권6호
    • /
    • pp.879-885
    • /
    • 2022
  • Of increasing global popularity is the multi-dimensional use and development of cities to address land use and urban issues caused by high urban density and challenging topography. In Korea, the city of Busan has a large proportion of mountainous areas, and the Gyeongbu Line that runs through the city's center has been interrupting this urban area for over 117 years. Because a lack of usable land is hindering the development of the city, introducing a multi-dimensional approach to urban development is seen as important. Accordingly, the Gyeongbu Line underground project is attempting to solve the problem of disconnection of Busan's city center and increase the amount of usable land for varied multi-dimensional use. In this study, by conducting a preference survey among those who live near the underground project sites of the Gyeongbu Line stations in Busan, the planned use of each available land arearesulting from the multi-dimensional development of railroadsand railway stations was investigated. However, in order to further the results of the survey, legal and institutional support is needed. There are limits to the multi-dimensional use of land, such as the lack of interconnection between individual laws and the lack of specific guidelines for multi-dimensional development.

A Study on the Social and Economic Aspects of Environmental Impact Assessment in Small Scale Rural Development Projects (소규모 농촌개발사업의 사회.경제 부문 환경영향평가 방안 연구)

  • Hong, Chan-Sun;Im, Sang-Bong
    • Journal of Korean Society of Rural Planning
    • /
    • 제9권4호
    • /
    • pp.9-18
    • /
    • 2003
  • The objectives of the study are to improve techniques for social impact assessment and to suggest their measuring methods to apply in small scale rural development projects. Population, residence, industries, and traffic volumes were selected to measure the social and economic impact assessment of Seongeup agricultural water development project in Jeju Province. Existing data gathering methods were used to estimate the changes of population and traffic volumes. Interview schedule for villagers was applied to estimate the residents' satisfaction to living environments. Interview schedule for experts was applied to estimate agricultural productivity and land price. The results of social and economic impact assessment show that there will be considerable changes in living environments, agricultural productivity, and land price. On the contrary, the project will make little impacts on the changes of population, em-ployment, and traffic volumes.