• Title/Summary/Keyword: Land based load

Search Result 149, Processing Time 0.026 seconds

Analysis of Characteristics of NPS Runoff and Pollution Contribution Rate in Songya-stream Watershed (송야천 유역의 비점오염물질 유출 특성 및 오염기여율 분석)

  • Kang Taeseong;Yu Nayeong;Shin Minhwan;Lim Kyoungjae;Park Minji;Park Baekyung;Kim Jonggun
    • Journal of Korean Society on Water Environment
    • /
    • v.39 no.4
    • /
    • pp.316-328
    • /
    • 2023
  • In this study, the characteristics of nonpoint pollutant outflow and contribution rate of pollution in Songya-stream mainstream and tributaries were analyzed. Further, water pollution management and improvement measures for pollution-oriented rivers were proposed. An on-site investigation was conducted to determine the inflow of major pollutants into the basin, and it was found that pollutants generated from agricultural land and livestock facilities flowed into the river, resulting in a high concentration of turbid water. Based on the analysis results of the pollution load data calculated through actual measurement monitoring (flow and water quality) and the occurrence and emission load data calculated using the national pollution source survey data, the S3 and S6 were selected as the concerned pollution tributaries in the Songya-stream basin. Results of cluster analysis using Pearson correlation coefficient evaluation and Density based spatial clustering of applications with noise (DBSCAN) technique showed that the S3 and S6 were most consistent with the C2 cluster (a cluster of Songya-stream mainstream owned area) corresponding to the mainstream of Songya-stream. The analysis results of the major pollutants in the concerned pollution tributaries showed that livestock and land pollutants were the major pollutants. Consequently, optimal management techniques such as fertilizer management, water gate management in paddy, vegetated filter strip and livestock manure public treatment were proposed to reduce livestock and land pollutants.

Quantitative Assessment of Nonpoint Source Load in Nakdong River Basin

  • Kwon, Heon-Gak;Lee, Jae-Woon;Yi, Youn-Jeong;Cheon, Se-Uk
    • Journal of Environmental Science International
    • /
    • v.23 no.1
    • /
    • pp.7-23
    • /
    • 2014
  • This study estimates unit for the nonpoint source(NPS), classified according to the existing Level-1(large scale) land cover map, by monitoring the measurement results from each Level-2(medium scale) land cover map, and verifies the applicability by comparison with previously calculated units using the Level-1 land cover map. The NPS pollutant loading for a basin is evaluated by applying the NPS pollutant unit to Dongcheon basin using the Level-2 land cover map. In addition, the BASINS/HSPF(Better Assessment Science Integrating point & Non-point Sources/Hydrological Simulation Program-Fortran) model is used to evaluate the reliability of the NPS pollutant loading computation by comparing the loading during precipitation in the Dongcheon basin. The NPS pollutant unit for the Level-2 land cover map is computed based on precipitation measured by the Sangju observatory in the Nakdong River basin. Finally, the feasibility of the NPS pollutant loading computation using a BASINS/HSPF model is evaluated by comparing and analyzing the NPS pollutant loading when estimated unit using the Level-2 land cover map and simulated using the BASINS/HSPF models.

Planning for Construction and Expanding of Distribution Substation Considering Contingency (상정사고를 고려한 배전용 변전소 신,증설 계획 수립)

  • Choi, Sang-Bong;Kim, Dae-Kyeong;Jeong, Seong-Hwan
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.50 no.7
    • /
    • pp.303-308
    • /
    • 2001
  • This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of substation bank system. In this paper, firstly, proper sphere of supply area by each district which could be standardized with respect to its supply capacity is established under assumption of long term load forecasting. Secondly, goal of utilization ratio based on configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents. Finally, it is set up for optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio. To verify proposed algorithm, at first, after adopting a part of Kangnam area in Seoul as area for testing, it is divided into several regions for this area according to power branches of power utility. Secondly, by deriving correlation factor between load demand and economic indicators in these region respectively, the regional load forecasting was performed with economic growth and city plan scenario. Finally, based on the predicted load demand by region and land use data which is identified from air-photographic, the load demand by district was predicted. Also, planning for substation considering contingency is formulated to expand taking into account computing utilization factor which is based on configuration of substation bank respectively.

  • PDF

Modeling the Resident Characteristics of Land-Based Pollutant Inflow to Suyeong Bay (수영만으로 유입되는 육상기인 오염물질의 체류특성 모델링)

  • Jung, Woo-Sung;Hong, Sok-Jin;Lee, Won-Chan;Kim, Hyung-Chul;Kim, Jin-ho;Kim, Dong-Myung
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.1
    • /
    • pp.45-57
    • /
    • 2019
  • The resident characteristics of land-based pollutants were analyzed to manage the pollution sources affecting Suyeong Bay. These characteristics were analyzed using a hydrodynamic model and particle tracking model. Pollutants were represented by particles, and the amount of particles and pollutants was represented proportional. The resident characteristics were analyzed by comparing the amount of pollutant load, resident pollutants, and the ratio of resident pollutants remaining in the bay relative to the incoming load for each the of pollution sources. The order of the pollution sources was as follows, according to the amount of resident pollutants at Suyeong Bay. the Suyeong WasteWater Treatment Plant(WWTP), Nambu WWTP, Suyeong river and so on. The amount of resident pollutants was smaller for small load farther away from the interior of bay. Nambu WWTP had the greatest load among the pollution sources, but it showed the smallest ratio of pollutants remaining in the bay relative to incoming load among the pollution points. The result indicates that pollutants affect sea areas differently according to the characteristics each area and the topographic characteristics of pollution sources.

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

Estimation of Pollutant Delivery Load in Hydraulic and Hydrologic Aspects for Water Quality Modeling (수질모델링을 위한 유달부하량의 수리·수문학적 산정)

  • Kim, Sang dan;Song, Mee Young;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.6 no.3
    • /
    • pp.47-54
    • /
    • 2004
  • A hydraulically and hydrologically based estimation method of pollutant delivery load for water quality modeling is proposed. The proposed method works on grid basis and routes overland flows from one cell to the next following the maximum downslope directions. The method is able to consider spatially-varied data of source pollutant, topography, land slopes, soil characteristics, land use and aspects, which can be extracted from geographic information systems (GIS) and from digital elevation models (DEMs). Because of this feature, the proposed method can be expected to be used for evaluating the impacts of various practices on watershed management for water quality.

  • PDF

Development of Program for prediction of Mid-long term Load density in region and district respectively. (지역별,관리구별 중장기 부하밀도 예측 프로그램의 개발)

  • Choi, Sang-Bong;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Bae, Jeong-Hyo;Ha, Tae-Hyun;Lee, Hyun-Goo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.307-309
    • /
    • 2000
  • This paper presents development of program for mid-tong term load forecasting in region and district respectively. In this program, at first, the region is classified by KEPCO branch which can be analyzed in light of curl·elation between load characteristics and economic indicator and then, prediction for load density in each region was performed by scenario of economic, population and city plan. Secondly, prediction for load density in each district is performed by methodology which is based on land use method. Finally efficiency for prediction work in each KEPCO branch could be identified by applying the developed program to the Seoul city in real.

  • PDF

Comparative Analysis of Land Use Change Model at Gapcheon Watershed (갑천 유역을 대상으로 토지이용예측모델 비교 분석)

  • Kwon, PilJu;Ryu, Jichul;Lee, Dong Jun;Han, Jeongho;Sung, Yunsoo;Lim, Kyoung Jae;Kim, Ki-Sung
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.6
    • /
    • pp.552-561
    • /
    • 2016
  • For the prediction of hydrologic phenomenon, predicting future land use change is a very important task. This study aimed to compare and analyze the two land use change models, CLUE-S and SLEUTH3-R. The analysis of two models were performed based on the MSR value such that the model with more reliable MSR value can be recommended as an appropriate land use change prediction model. The model performance was examined by applying to the Gapcheon A watershed. Land use map of the study area of 2007 obtained from the Ministry of Environment was compared with the predicted land use map obtained from each of the two models. The result from both models showed somewhat similar results. The MSR value obtained from CLUE-S was 0.564, while that from SLEUTH3-R was 0.586. However, when land use map of 2010 was compared with predicted land use map obtained from the two models in same manner, the MSR value obtained from CLUE-S' was 0.500 while that from SLEUTH3-R was decreased to 0.397, an approximately 32.3% decrease from previous value of 2007. Moreover, SLEUTH3-R showed more sensitivity in conversion of urban areas, as compared to other land use types. Therefore, for the prediction of future land use change, CLUE-S model is more reliable than SLEUTH3-R.

Study on the Limit Slenderness of a Double Outrigger System (이중 아웃리거 구조 시스템의 한계 세장비에 대한 연구)

  • Yang, Jae-Kwang;Kang, Ho-Geun;Park, Sung-soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.11-18
    • /
    • 2018
  • Due to the recent overpopulation of urban cities, land shortage and soaring land prices have caused an increase in the demand for high-rise buildings. To build buildings on a limited land, the size of the building is important. Displacement control by horizontal loads in a skyscraper is critical to securing stability and usability of structures. Several systems have been proposed for efficient horizontal displacement control, and so far the study continues. Among them, the Outrigger System is a representative of the typical horizontal load resistance system. Although studies have been conducted so far to locate the optimal position of the outrigger, studies of the slenderness ratio of the buildings are still insufficient. Based on the Outrigger-Optimized Position equation, this study induces the calculation of the displacement of the outrigger installation building according to the slenderness ratio.

Analysis on the Seismic Load Reduction Effect of a Ground by Considering Pile Strength (말뚝 강성을 고려한 지반의 지진하중 저감 효과에 관한 해석 연구)

  • Kim, Sang-Yeon;Park, Jong-Bae;Park, Yong-Boo;Kim, Dong-Soo;Lee, Sei-Hyun
    • Land and Housing Review
    • /
    • v.3 no.4
    • /
    • pp.451-456
    • /
    • 2012
  • In this study, a numerical analysis to evaluate the reduction of seismic load due to pile group was performed and compared the peak ground acceleration(PGA) measured at free-field and foundation. The special attention was given to the amplification of seismic acceleration on the foundation due to the pile effects. The analysis considering pile effects was carried out for 4, 8 and 12 piles with same condition by PLAXIS 2D Dynamics. Based on the analysis results, it is found that the overall reduction in seismic load due to foundation and reduction rates are similar irrespective of pile numbers. This study gives a possibility for effective design of piled foundation by reducing seismic load about 20~25%.