Journal of the Korean Institute of Landscape Architecture
/
v.38
no.4
/
pp.54-63
/
2010
The recently-introduced Special Use Permit system is an exceptional approval system for private park developers to develop unexecuted urban park sites into urban parks with the implementation of profit-generating businesses within the boundary of preserving the original function of the park under an agreement with local authorities. This thesis studies the application of this system. This is a feasibility study of cases that have contributed to the acceptance of intended park sites by developing some parts of park sites as public housing, focused on unexecuted urban park areas for the long term in Suwon City based on the Special Use Permit, and creating other sites as park area. First, it has been judged that realization of business is possible at 300 percents of the floor area ratio in case of flatland neighborhood park which has high appraised land values. It is judged that realization of business is possible within a 10 percents size of private land at 200 percents of the floor area ratio in case of woodland and waterside neighborhood parks that have low appraised land values on the outskirts of the city. Second, through working expenses combining compensation and money for park construction, a balance of business profit can be understood within about 50 percents of total expenditures. Because the public contribution ratio by the Special Use Permit can be presumed as about 50 percents of total expenditures, it implies that windfall profits by the Special Use Permit can be adequately collected.
Purpose: The purpose is to establish a safe facility environment from abnormal voltages such as lightning by developing a smart land resistance measuring device that can acquire real-time land resistance data using Arduino. Method: This paper studied design models and application cases by developing a land resistance acquisition and analysis system with Arduino and a power line communication (PLC) system. Some sites in the wind power generation complex in Gyeongsangnam-do were selected as test beds, and real-time land resistance data applied with new technologies were obtained. The electrode arrangement adopted a smart electrode arrangement using a combination of a Wenner four electrode arrangement and a Schlumberger electrode arrangement. Result: First, the characteristic of this technology is that the depth of smart multi-electrodes is organized differently to reduce the error range of the acquired data even in the stratigraphic structure with specificity between floors. Second, IT convergence technology was applied to enable real-time transmission and reception of information on land resistance data acquired from smart ground electrodes through the Internet of Things. Finally, it is possible to establish a regular management system and analyze big data accumulated in the server to check the trend of changes in various elements, and to model the optimal ground algorithm and ground system design for the IT convergence environment. Conclusion: This technology will reduce surge damage caused by lightning on urban infrastructure underlying the 4th industrial era and design an optimized ground system model to protect the safety and life of users. It is also expected to secure intellectual property rights of pure domestic technology to create jobs and revitalize our industry, which has been stagnant as a pandemic in the post-COVID-19 era.
Journal of the Korean Institute of Landscape Architecture
/
v.24
no.1
/
pp.42-54
/
1996
Many of urban parks which have been designated for urban planning regulation are not well developed because the priority of investment is inferior to that of other public facilities. Park development is an urgent urban policy and it is hard to decide priority among parks. Therefore, it is necessary to evaluate the priority of park development. Thus the Analytic Hierarchy Process has been introduced because it is suitable for achieving objectivity by collecting the professional opinions. The goals of park development are evaluated by AHP method and the priorities among goals are conservation of natural environment, satisfying the residents' residents' needs, population density, regional pollution, land acquisition cost, ratio of greeneries and facilities within park areas. Priority of park development is decided by the standardization of each individual inventory data and considering of the professional opinions. Among the multi-attribute judgement methods, AHP method may be the most widely used. Despite the critical evaluations of the AHP, such as limitation of the nine-point scale and the rank reversal problem, application of AHP to decide the priority of park development is suitable for actual circumstances.
The Japanese economy has been unstable since 1990. Economic instability and changes in working conditions have made the acquisition of housing and the improvement in housing standards difficult. Unstable working and habitation conditions have also spread, and the Nagoya Metropolitan Area is recognized as a traction community in the Japanese economy. This study employed existing statistics and helpline consultations in 2013 to clarify the state of housing poverty in the Nagoya Metropolitan Area. Moreover, it clarified the conditions for improvement in the housing standards for the low-income households, a regional gap, and reasons for the deteriorating housing levels of low-income households by investigating the "Housing and Land Survey." Furthermore, it clarified housing difficulties that do not appear in existing statistics by investigating the examples of "toll-free call consultations" in 2013.
This study used to the satellite photograph and drew up a flood inundation map. To past used digital map and showed reflect the inundation map and change of the city was difficult. The acquisition of the satellite photograph is easy from internet Site of Korea and is updated quickly. So, used the satellite photograph from flood inundation drawing up of existing and reflected the change of the city. Drawing up method of the inundation map in compliance with the research which sees the reflection of the land use which is actual is possible. Results of HEC-RAS with depth and an inundation location to be show easily. But there is to a combination method of the satellite photographs and GIS data and more objective and the subject the development of the technique which has reached fixed quantity must be researched continuously judges.
The wave power plant is a generating system to convert the wave energy resources to electric energy. ´CHUJEON A´, which is a prototype of wave power plant developed by KORDI(Korea Ocean Research and Development Institute), has been launched for its performance test. A wound rotor induction machine is adopted as a generator for the power plant to acquire constant frequency and voltage over wide range of rotor speed. Because the generator of ´CHUJEON A´ has no connection to the power grid line on land, all of the processes to generate and consume the electricity have to be conducted on the floating plant. This paper deals with the design and implementation of the unmanned control system for ´CHUJEON A´. The system includes generator control system, power conversion and charging system, data acquisition and wireless communication system ...
Kim, Choon-Sik;Yoon, Soo-Ho;Shin, Seung-Mok;Hur Chul;Kim, Sang-Bong
제어로봇시스템학회:학술대회논문집
/
2001.10a
/
pp.150.1-150
/
2001
This paper introduces a real time inspecting and monitoring system by using wireless communication and image processing technique. The communication system is developed by using 80c196kc microprocessor and it has data acquisition function for several kinds of sensors such as pluviometer, temperature, tension meter, elinometer and so on. The image processing method adopts Lalacian of Gaussian operator and least square method to extract line features for the captured images and uses a relaxation matching algorithm based in global structure constraint satisfaction to distinguish the matching error for those features. When the algorithm is processed, motion parameters of displacement area and its direction are computed. Once movement is recognized ...
Geophysical survey for unconformity-type uranium deposit applied to this study area in Athabaska Basin, Canada were carried out airborne TEM and magnetic, resistivity-induced polarization (DC-IP), puser seismic reflection and well-logging method. The results of airborne survey interpreted the lithological boundary, geological structures, and conductors. Also, these results decided to main targets for ground DC-IP survey. The Low resistivity and the high chargeability slices of 3D modeling interpreted from DC-IP survey response for conductors related to hydrothermal alteration zones and fault-controlled graphitic zones occurring at the unconformity-type uranium deposit, and they confirmed by diamond drilling. Seismic results interpreted to lake bottom surface, alluvium layer and intra-sandstone faults. We suggest the resonable field data acquisition of DC-IP method on the land or the lake in Athabaska Basin.
Journal of information and communication convergence engineering
/
v.11
no.4
/
pp.253-257
/
2013
Mobile computers can process large amounts of data at high speeds, and it is feasible and easy to implement a remote monitoring system utilizing mobile computers. Because of their portability and convenience, these computers have been employed in various research areas to develop such monitoring systems. Existing monitoring system is a bit difficult to real time monitoring the scattered offshore facilities. So this paper compensate the existing system by using mobile computers such as a tablet PC-based monitoring system. Also, the scattered offshore facilities can be monitored in real-time through the tablet PC. The developed monitoring system is a fully Internet-based monitoring platform that enables one to monitor and control remote oceanic applications at any time and any place where it is possible to access the Internet. It can be applied to many oceanic applications as well as the unmanned systems and remote monitoring systems on land.
The Korean government has been working to reduce national logistics costs since the early 1990s. One of the major plans instituted by the government was to build five complex freight terminals using ICDs(inland container depots) as hub inland terminals. This paper explains the process and the methods adopted for site selection, with special focus on the Youngnam Freight Terminal. Among nineteen developable sites in Youngnam region, four candidates were selected based on the Map Overlay Approach under several criteria, including land acquisition costs, proximity to major highways and railroads, suitability of the terrain, etc. In this study, we used the AHP to select the best site among the four sites.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.