• Title/Summary/Keyword: Land Information Model

Search Result 856, Processing Time 0.036 seconds

Potential Habitat Area Based on Natural Environment Survey Time Series Data for Conservation of Otter (Lutra lutra) - Case Study for Gangwon-do - (수달의 보전을 위한 전국자연환경조사 시계열 자료 기반 잠재 서식적합지역 분석 - 강원도를 대상으로 -)

  • Kim, Ho Gul;Mo, Yongwon
    • Korean Journal of Environment and Ecology
    • /
    • v.35 no.1
    • /
    • pp.24-36
    • /
    • 2021
  • Countries around the world, including the Republic of Korea, are participating in efforts to preserve biodiversity. Concerning species, in particular, studies that aim to find potential habitats and establish conservation plans by conducting habitat suitability analysis for specific species are actively ongoing. However, few studies on mid- to long-term changes in suitable habitat areas are based on accumulated information. Therefore, this study aimed to analyze the time-series changes in the habitat suitable area and examine the otters' changing pattern (Lutra lutra) designated as Level 1 endangered wildlife in Gangwon-do. The time-series change analysis used the data on otter species' presence points from the 2nd, 3rd, and 4th national natural environment surveys conducted for about 20 years. Moreover, it utilized the land cover map consistent with the survey period to create environmental variables to reflect each survey period's habitat environment. The suitable habitat area analysis used the MaxEnt model that can run based only on the species presence information, and it has been proven to be reliable by previous studies. The study derived the habitat suitability map for otters in each survey period, and it showed a tendency that habitats were distributed around rivers. Comparing the response curves of the environmental variables derived from the modeling identified the characteristics of the habitat favored by otters. The examination of habitats' change by survey period showed that the habitats based on the 2nd National Natural Environment Survey had the widest distribution. The habitats of the 3rd and 4th surveys showed a tendency of decrease in area. Moreover, the study aggregated the analysis results of the three survey periods and analyzed and categorized the habitat's changing pattern. The type of change proposed different conservation plans, such as field surveys, monitoring, protected area establishment, and restoration plan. This study is significant because it produced a comprehensive analysis map that showed the time-series changes of the location and area of the otter habitat and proposed a conservation plan that is necessary according to the type of habitat change by region. We believe that the method proposed in this study and its results can be used as reference data for establishing a habitat conservation and management plan in the future.

Economic Loss Estimation of Mt. Baekdu Eruption Scenarios (백두산 화산 분화 시나리오에 따른 경제적 손실 평가)

  • Yu, Soonyoung;Lee, Yun-Jung;Yoon, Seong-Min;Choi, Ki-Hong
    • Economic and Environmental Geology
    • /
    • v.47 no.3
    • /
    • pp.205-217
    • /
    • 2014
  • As Mt. Backdu is expected to erupt, the social and economic impacts of the eruption on the Korean peninsula as well as on the world become a research topic of interest. If the volcano erupts, South Korea can be directly impacted by volcanic ash, which will bring out secondary damages in various ways. Given that the direct damage is a basis to estimate indirect and secondary damages, this paper was to review a method to estimate direct damages, called catastrophe risk models, and estimate the direct damages of available eruption scenarios of Mt. Baekdu. Based on the results, the damages by volcanic ash will occur mostly around Gangwon province if the Mt. Backdu erupts. Thus the inventory lists and their damage functions of Gangwon provinces were collected. In particular agricultural and forestry products were surveyed based on the land use. Direct damages were estimated using volcanic ash distribution of eruption scenarios, inventory information and their damage functions. In result, a scenario in winter caused the damage of 299.8 billion KRW (20.4% of total agricultural production in 2010) and 28.9 billion KRW (9.0% of total forestry production in 2010) in agriculture and forestry, respectively. The damages in agriculture was larger, and it is due to the damage functions which show the agricultural products are more vulnerable to volcanic ash than forestry products. Also the agricultural production (1,471.7 billion KRW in 2010) are more than 4.5 times the forestry production (322.3 billion KRW in 2010) in Gangwon province. Inje and Gangnung had the most damages in the scenario in winter. Inje had the most damage due to the thick ash deposit (8.5 mm in average) despite the low production. On the other hand, Goseong had a low damage compared to the ash thickness larger than 20mm, owing to the low production. The direct damage estimated through this process can be used to estimate indirect damages.

Analysis of Traffic Accidents Injury Severity in Seoul using Decision Trees and Spatiotemporal Data Visualization (의사결정나무와 시공간 시각화를 통한 서울시 교통사고 심각도 요인 분석)

  • Kang, Youngok;Son, Serin;Cho, Nahye
    • Journal of Cadastre & Land InformatiX
    • /
    • v.47 no.2
    • /
    • pp.233-254
    • /
    • 2017
  • The purpose of this study is to analyze the main factors influencing the severity of traffic accidents and to visualize spatiotemporal characteristics of traffic accidents in Seoul. To do this, we collected the traffic accident data that occurred in Seoul for four years from 2012 to 2015, and classified as slight, serious, and death traffic accidents according to the severity of traffic accidents. The analysis of spatiotemporal characteristics of traffic accidents was performed by kernel density analysis, hotspot analysis, space time cube analysis, and Emerging HotSpot Analysis. The factors affecting the severity of traffic accidents were analyzed using decision tree model. The results show that traffic accidents in Seoul are more frequent in suburbs than in central areas. Especially, traffic accidents concentrated in some commercial and entertainment areas in Seocho and Gangnam, and the traffic accidents were more and more intense over time. In the case of death traffic accidents, there were statistically significant hotspot areas in Yeongdeungpo-gu, Guro-gu, Jongno-gu, Jung-gu and Seongbuk. However, hotspots of death traffic accidents by time zone resulted in different patterns. In terms of traffic accident severity, the type of accident is the most important factor. The type of the road, the type of the vehicle, the time of the traffic accident, and the type of the violation of the regulations were ranked in order of importance. Regarding decision rules that cause serious traffic accidents, in case of van or truck, there is a high probability that a serious traffic accident will occur at a place where the width of the road is wide and the vehicle speed is high. In case of bicycle, car, motorcycle or the others there is a high probability that a serious traffic accident will occur under the same circumstances in the dawn time.

Analysis the Appropriate Schedule for the Installment Payment Amount and Establishment of the Post sale System and Policy in the Apartment Construction (공동주택 건설사업에서 후분양의 제도 및 정책 수립을 위한 분담금 납부 적정시기 분석)

  • Yoon, Inhwan;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Since the 2016 "Housing Act Partial Amendment" and the "2018 Housing Comprehensive Amendment Plan", interest in the pre sale system and post sale system of apartment houses has been on the rise. In order to compare the advantages and disadvantages of the pre sale system and the post sale system of apartment houses, and to establish the basis for the institutional policy of the post sale system, a questionnaire survey method was used for tenants of the apartment house from the public side, and issues of time and cost. The time series analysis method is intended to suggest an appropriate time for payment of contributions. Accordingly, through a review of existing theories and literature, the post sale system of public and private institutions was organized, and through a questionnaire survey, the path to securing pre sale money, product information of the model house, and the degree of awareness of the effect of the post sale system were investigated. For the post sale fund support and payment method, it is necessary to increase the commercial line for existing financiers from the user's point of view, and it is necessary to operate in consideration of the economic power of the pre sale market by region. Both 60% post sale and 80% post sale have a price range of up to KRW 10 million, and the total interest rate is 5.0%, and the annual interest rate is about 2.8% for 60% post sale, and about 2.1% for 80% post sale, which is lower than the current 3.1%. I need an interest rate. The research is a perception survey targeting a total of 5,213 households in a sample of after sale apartments in public institutions. As the actual values are analyzed using a time series on the effects of market supply and demand and market prices, there is a limit to applying them to prospective residents of private apartments. In addition, to respond to first time tenants, a questionnaire survey was conducted on five complexes that have moved in within the last five years.

Vegetation classification based on remote sensing data for river management (하천 관리를 위한 원격탐사 자료 기반 식생 분류 기법)

  • Lee, Chanjoo;Rogers, Christine;Geerling, Gertjan;Pennin, Ellis
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.6-7
    • /
    • 2021
  • Vegetation development in rivers is one of the important issues not only in academic fields such as geomorphology, ecology, hydraulics, etc., but also in river management practices. The problem of river vegetation is directly connected to the harmony of conflicting values of flood management and ecosystem conservation. In Korea, since the 2000s, the issue of river vegetation and land formation has been continuously raised under various conditions, such as the regulating rivers downstream of the dams, the small eutrophicated tributary rivers, and the floodplain sites for the four major river projects. In this background, this study proposes a method for classifying the distribution of vegetation in rivers based on remote sensing data, and presents the results of applying this to the Naeseong Stream. The Naeseong Stream is a representative example of the river landscape that has changed due to vegetation development from 2014 to the latest. The remote sensing data used in the study are images of Sentinel 1 and 2 satellites, which is operated by the European Aerospace Administration (ESA), and provided by Google Earth Engine. For the ground truth, manually classified dataset on the surface of the Naeseong Stream in 2016 were used, where the area is divided into eight types including water, sand and herbaceous and woody vegetation. The classification method used a random forest classification technique, one of the machine learning algorithms. 1,000 samples were extracted from 10 pre-selected polygon regions, each half of them were used as training and verification data. The accuracy based on the verification data was found to be 82~85%. The model established through training was also applied to images from 2016 to 2020, and the process of changes in vegetation zones according to the year was presented. The technical limitations and improvement measures of this paper were considered. By providing quantitative information of the vegetation distribution, this technique is expected to be useful in practical management of vegetation such as thinning and rejuvenation of river vegetation as well as technical fields such as flood level calculation and flow-vegetation coupled modeling in rivers.

  • PDF

Studies on Development of Prediction Model of Landslide Hazard and Its Utilization (산지사면(山地斜面)의 붕괴위험도(崩壞危險度) 예측(豫測)모델의 개발(開發) 및 실용화(實用化) 방안(方案))

  • Ma, Ho-Seop
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.2
    • /
    • pp.175-190
    • /
    • 1994
  • In order to get fundamental information for prediction of landslide hazard, both forest and site factors affecting slope stability were investigated in many areas of active landslides. Twelve descriptors were identified and quantified to develop the prediction model by multivariate statistical analysis. The main results obtained could be summarized as follows : The main factors influencing a large scale of landslide were shown in order of precipitation, age group of forest trees, altitude, soil texture, slope gradient, position of slope, vegetation, stream order, vertical slope, bed rock, soil depth and aspect. According to partial correlation coefficient, it was shown in order of age group of forest trees, precipitation, soil texture, bed rock, slope gradient, position of slope, altitude, vertical slope, stream order, vegetation, soil depth and aspect. The main factors influencing a landslide occurrence were shown in order of age group of forest trees, altitude, soil texture, slope gradient, precipitation, vertical slope, stream order, bed rock and soil depth. Two prediction models were developed by magnitude and frequency of landslide. Particularly, a prediction method by magnitude of landslide was changed the score for the convenience of use. If the total store of the various factors mark over 9.1636, it is evaluated as a very dangerous area. The mean score of landslide and non-landslide group was 0.1977 and -0.1977, and variance was 0.1100 and 0.1250, respectively. The boundary value between the two groups related to slope stability was -0.02, and its predicted rate of discrimination was 73%. In the score range of the degree of landslide hazard based on the boundary value of discrimination, class A was 0.3132 over, class B was 0.3132 to -0.1050, class C was -0.1050 to -0.4196, class D was -0.4195 below. The rank of landslide hazard could be divided into classes A, B, C and D by the boundary value. In the number of slope, class A was 68, class B was 115, class C was 65, and class D was 52. The rate of landslide occurrence in class A and class B was shown at the hige prediction of 83%. Therefore, dangerous areas selected by the prediction method of landslide could be mapped for land-use planning and criterion of disaster district. And also, it could be applied to an administration index for disaster prevention.

  • PDF